The October 7 bureaucratic reshuffle, involving 49 IAS and JKAS officers, has once again set the administrative carousel spinning. Deputy Commissioners have been shifted, departments have acquired new heads, and officers have moved from one influential assignment to another.
But one document is conspicuously missing from this elaborate exercise: the public report card of the outgoing officer.
What did he achieve? What did he fail to achieve? How much public money was spent under his watch? How many grievances did he resolve? How many did he leave behind? And what measurable difference did his tenure make to the lives of ordinary citizens?
Nobody seems interested in answering these questions.
Srinagar Smart City: Build Today, Dig Tomorrow!
Take Srinagar Smart City.
For years, citizens endured dug-up roads, traffic diversions, dust and inconvenience while being promised a transformed Srinagar.
Public money was poured into beautification, pedestrian infrastructure, roads and urban redesign. Government departments celebrated the transformation as a major achievement. Even as there was nothing so major about it. Bakshi Stadium gets inundated with a 20-minute downpour, and vehicles float in knee-deep waters as rains lash.
Then came the spectacle of newly developed infrastructure being dismantled and reworked.
At Jehangir Chowk, pedestrian infrastructure created under the Smart City project was reported to be undergoing reconstruction.
Now, reconstruction is not automatically proof of wrongdoing. Urban infrastructure sometimes requires modification. But where public money has been spent, the reason must be disclosed.
Was the original design defective? Was traffic movement inadequately studied? Were engineers overruled? Was the construction substandard? Or had circumstances genuinely changed? Or was there something else that the outgoing commissioner didn’t have courage to say?
And if the original project was properly conceived, who authorised the subsequent alterations, and at what additional cost?
The government owes taxpayers a project-wise explanation. That people are dumb and inert doesn’t mean accountability must be taken for granted.
A public project cannot become one officer’s monument today and another officer’s excavation site tomorrow, with both claiming to have served the public interest.
The Transfer Order: An Administrative Escape Certificate?
Dr Raja Muzaffar Bhat recently raised a valid concern in Kashmir Observer about the revolving doors of bureaucracy. He argued that frequent transfers prevent well-intentioned officers from completing important initiatives.
He cited examples from waste management, pollution control and livelihood programmes, including initiatives in Budgam that may lose momentum because their administrative champions have moved elsewhere.
His argument deserves attention.
But I would ask a question that goes beyond the length of an officer’s tenure.
What is the point of giving an officer three years instead of eight months if nobody measures what he actually achieves during those three years?
An efficient officer can make a meaningful difference in six months. An inefficient officer can waste three years conducting meetings, issuing instructions, and posing for photographs. While the former deserves applause; the latter better be relegated to some clerical work. Public should not be expected to carry the burden of someone’s inefficiency for life.
Tenure is a measure of time. Performance is a measure of outcomes. Confusing the two is one of the fundamental defects of our administrative culture.
The Citizen Who Never Gets Transferred
Imagine a citizen whose land mutation has remained pending for years. Or a small dispute pending at a Deputy Commissioner’s level has aged him.
During those years, eight Deputy Commissioners may have occupied the chair. Several Tehsildars and Patwaris may have come and gone.
Ironically, each new officer assumes charge amid declarations of transparency, responsiveness and citizen-friendly administration. Yet the citizen’s file continues gathering dust.
The officers move on. Their salaries continue. Their careers advance. Some receive more influential assignments, which convert into more graft and personal glory. But the citizen remains trapped in the same problem – year after year.
In Kashmir, bureaucrats have transfer orders. Ordinary citizens have pending files. And unlike the bureaucrat, the citizen has no administrative escape route.
Who measures the social, psychological and financial cost of this delay?
Who compensates citizens for lost income, repeated travel, legal expenses and years of harassment caused by administrative inaction?
Put LED Display Boards Outside Every DC Office
Here is a simple proposal.
Every Deputy Commissioner’s office, Municipal Corporation and major public-facing government department should have a large electronic display board, visible to citizens, showing its actual performance.
Not photographs of the Lieutenant Governor or Chief Minister. Not promotional slogans. Not lists of ceremonial achievements. Real numbers.
How many public grievances were received? How many were resolved? How many remain pending? How many land and revenue disputes are still pending? How many development projects are delayed? How much money has been spent? What are the five most urgent unresolved issues requiring immediate action?
And, crucially, how much progress has been made during the tenure of the present officer?
When a DC is transferred, the display should record his final performance statistics and preserve them permanently in the public domain.
The administration has developed an extraordinary ability to confuse activity with achievement.
An officer conducts 150 meetings. Another holds 30 public grievance camps. A third visits 20 schools and hospitals.
Photographs are released. Press statements are issued. Social media celebrates the officer’s dynamism.
But what changed?
Did the hospitals become better? Did drainage improve? Were jobs generated? Did corruption complaints decrease? Were public grievances resolved within prescribed timelines?
A meeting is not an achievement. An instruction is not implementation. And expenditure is not development.
The real measure of bureaucratic success should be the social impact of decisions.
Every officer should leave behind an independently verifiable social impact statement, not merely a handing-over note.
A Challenge to the Government
Lieutenant Governor Manoj Sinha and Chief Minister Omar Abdullah now have an opportunity to introduce a governance reform that would be more meaningful than another round of administrative reshuffling.
Make a Public Tenure Completion Audit mandatory for every Deputy Commissioner, Municipal Commissioner and head of a major government department.
Require every outgoing officer to publish an independently validated performance statement.
| A proposed public accountability board displaying the measurable performance of every outgoing Deputy Commissioner. Performance Indicator |
Status / Figures |
| Officer’s tenure | 11 months |
| Public grievances received | 8,430 |
| Public grievances resolved | 5,210 |
| Cases pending | 3,220 |
| Delayed development projects | 7 |
| Public expenditure | Actual vs. approved budget to be published |
| Oldest pending grievance | 418 days |
| Independent citizen feedback | Verified and published |
| Incomplete promises | Responsibility transferred to successor |
Note: All figures are illustrative, not actual performance data. A real board must display independently verified official statistics.
Require every incoming officer to acknowledge the inherited pendencies and publish a 100-day action plan.
Let citizens know not simply who has been transferred, but what the outgoing officer leaves behind.
A good officer should welcome such scrutiny. His record would speak louder than recommendations, political patronage or media management.
A poor performer would find it more difficult to hide behind a new designation.
And the government would finally possess a transparent basis for distinguishing administrative excellence from administrative theatrics.
The next time the General Administration Department announces the transfer of 49 officers, let it issue 49 performance summaries alongside the transfer order.
Because governance is not about how frequently officers change chairs. It is about what changes for the public while they occupy those chairs.
If the government can transfer a bureaucrat overnight, why can’t it tell the public by the following morning what he actually accomplished?



