• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, November 8, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

ISRO’s breakthrough ‘3D-printed’ rocket engine saves 97% raw materials, 60% production time

Press Trust of india by Press Trust of india
May 10, 2024
in BUSINESS
A A
0
ISRO announces Young Scientist Prog-2024
FacebookTwitterWhatsapp

Bengaluru: ISRO has successfully conducted a long-duration test of its PS4 engine, re-designed for production using cutting-edge additive manufacturing (AM) techniques — also known in common parlance as 3D printing — and crafted in Indian industry, the space agency said on Friday.

The new engine, now a single piece, saves 97 per cent of raw materials and reduces production time by 60 per cent, ISRO said.

More News

All Agniveers eligible for regular enrollment post 2-year tenure extension: Rajnath Singh

J&K Bank explores expansion of banking services in Ladakh

J&K Bank opens premium branch at Barzulla, extension counter at PCR

Load More

ISRO achieved the major milestone with the successful hot testing of a liquid rocket engine manufactured through AM technology for a duration of 665 seconds on May 9, a release from the space agency said.

The engine used is the PS4 engine of PSLV (Polar Satellite Launch Vehicle) upper stage.

The PS4 engine manufactured in the conventional machining and welding route has been in use for the fourth stage of PSLV which has a thrust of 7.33 kN in vacuum condition. The same engine is also used in the Reaction Control System (RCS) of the first stage (PS1) of PSLV, the release said.

The engine uses the earth-storable bipropellant combinations of Nitrogen Tetroxide as oxidiser and Mono Methyl Hydrazine as fuel in pressure-fed mode. It was developed by ISRO’s Liquid Propulsion Systems Centre (LPSC).

LPSC redesigned the engine making it amenable to the Design for Additive Manufacturing (DfAM) concept thereby gaining considerable advantages.

The Laser Powder Bed Fusion technique employed has brought down the number of parts from 14 to a single-piece, and eliminated 19 weld joints, saving significantly on the raw material usage per engine (13.7 kg of metal powder compared to the 565 kg of forgings and sheets for conventional manufacturing process) and reduced 60 per cent in the overall production time, the ISRO release said.

The manufacturing of the engine was done in Indian industry (M/s WIPRO 3D), and the engine was hot tested at ISRO Propulsion Complex, Mahendragiri, Tamil Nadu.

As part of the development programme, the injector head of the engine was realised and successfully hot tested earlier. Detailed flow and thermal modelling, structural simulation, and cold flow characterisation of the proto hardware were carried out to gain confidence for the hot test, ISRO said.

Consequently, four successful developmental hot tests of integrated engine were conducted for a cumulative duration of 74 seconds which validated the engine performance parameters.

Furthermore, the engine was successfully tested for the full qualification duration of 665 seconds and observed that all the performance parameters were as expected. It is planned to induct this AM PS4 engine into the regular PSLV programme, ISRO added.

Previous Post

Heavy fighting in Gaza’s Rafah keeps aid crossings closed, sends 100,000 civilians fleeing

Next Post

Opposition leaders welcome Kejriwal’s interim bail

Press Trust of india

Press Trust of india

Related Posts

All Agniveers eligible for regular enrollment post 2-year tenure extension: Rajnath Singh

BJP governments never imposed any ban on media organisations: Rajnath Singh
November 8, 2026

New Delhi: After completing an additional two-year tenure, all Agniveers will be eligible for enrollment as regular soldiers, subject to...

Read moreDetails

J&K Bank explores expansion of banking services in Ladakh

J&K Bank explores expansion of banking services in Ladakh
November 7, 2026

CGM meets UT Finance Secretary; discussions also cover CSR initiatives LEH: Chief General Manager of Jammu and Kashmir Bank Imtiyaz...

Read moreDetails

J&K Bank opens premium branch at Barzulla, extension counter at PCR

J&K Bank opens premium branch at Barzulla, extension counter at PCR
November 7, 2026

SRINAGAR: Jammu and Kashmir Bank on Friday inaugurated a Premium Branch at Barzulla in Srinagar and an extension counter at...

Read moreDetails

Cybercrime networks shift to smaller, mobile scam operations amid enforcement pressure: FATF

Govt establishes JK4C to combat cyber crimes across J&K
November 7, 2026

New Delhi:  With enforcement pressure mounting, criminal networks are breaking their Southeast Asia-based scam compounds, which are dens of international...

Read moreDetails

J&K Bank holds customer care town hall in Anantnag

J&K Bank holds customer care town hall in Anantnag
November 5, 2026

ANANTNAG: Jammu and Kashmir Bank on Thursday held the second meeting of its Customer Care Town Hall series at its...

Read moreDetails

Govt relaxes passport and visa rules for foreign nationals residing in India

Govt relaxes passport and visa rules for foreign nationals residing in India
November 5, 2026

New Delhi: The government has relaxed passport and visa rules for several categories of foreign nationals residing in the country,...

Read moreDetails
Next Post

Opposition leaders welcome Kejriwal's interim bail

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.