• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, April 17, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

ISRO’s breakthrough ‘3D-printed’ rocket engine saves 97% raw materials, 60% production time

Press Trust of india by Press Trust of india
May 10, 2024
in BUSINESS
A A
0
ISRO announces Young Scientist Prog-2024
FacebookTwitterWhatsapp

Bengaluru: ISRO has successfully conducted a long-duration test of its PS4 engine, re-designed for production using cutting-edge additive manufacturing (AM) techniques — also known in common parlance as 3D printing — and crafted in Indian industry, the space agency said on Friday.

The new engine, now a single piece, saves 97 per cent of raw materials and reduces production time by 60 per cent, ISRO said.

More News

Asia will remain main driver of global growth: IMF

Economic normalisation could take longer: CEA Anantha Nageswaran

Income Tax Act, 2025 is historic step towards modern, transparent tax system: President

Load More

ISRO achieved the major milestone with the successful hot testing of a liquid rocket engine manufactured through AM technology for a duration of 665 seconds on May 9, a release from the space agency said.

The engine used is the PS4 engine of PSLV (Polar Satellite Launch Vehicle) upper stage.

The PS4 engine manufactured in the conventional machining and welding route has been in use for the fourth stage of PSLV which has a thrust of 7.33 kN in vacuum condition. The same engine is also used in the Reaction Control System (RCS) of the first stage (PS1) of PSLV, the release said.

The engine uses the earth-storable bipropellant combinations of Nitrogen Tetroxide as oxidiser and Mono Methyl Hydrazine as fuel in pressure-fed mode. It was developed by ISRO’s Liquid Propulsion Systems Centre (LPSC).

LPSC redesigned the engine making it amenable to the Design for Additive Manufacturing (DfAM) concept thereby gaining considerable advantages.

The Laser Powder Bed Fusion technique employed has brought down the number of parts from 14 to a single-piece, and eliminated 19 weld joints, saving significantly on the raw material usage per engine (13.7 kg of metal powder compared to the 565 kg of forgings and sheets for conventional manufacturing process) and reduced 60 per cent in the overall production time, the ISRO release said.

The manufacturing of the engine was done in Indian industry (M/s WIPRO 3D), and the engine was hot tested at ISRO Propulsion Complex, Mahendragiri, Tamil Nadu.

As part of the development programme, the injector head of the engine was realised and successfully hot tested earlier. Detailed flow and thermal modelling, structural simulation, and cold flow characterisation of the proto hardware were carried out to gain confidence for the hot test, ISRO said.

Consequently, four successful developmental hot tests of integrated engine were conducted for a cumulative duration of 74 seconds which validated the engine performance parameters.

Furthermore, the engine was successfully tested for the full qualification duration of 665 seconds and observed that all the performance parameters were as expected. It is planned to induct this AM PS4 engine into the regular PSLV programme, ISRO added.

Previous Post

Heavy fighting in Gaza’s Rafah keeps aid crossings closed, sends 100,000 civilians fleeing

Next Post

Opposition leaders welcome Kejriwal’s interim bail

Press Trust of india

Press Trust of india

Related Posts

Asia will remain main driver of global growth: IMF

Pakistan unlikely to get IMF bailout by Jan 15: Report
April 17, 2026

Washington: Asia will remain the main driver of global growth with India and China contributing 70 per cent of the...

Read moreDetails

Economic normalisation could take longer: CEA Anantha Nageswaran

Govt working overtime to cushion export sector from US tariffs: CEA Anantha Nageswaran
April 17, 2026

Washington: India's top economic adviser on Wednesday cautioned about the impact of rising oil prices on the global economy and...

Read moreDetails

Income Tax Act, 2025 is historic step towards modern, transparent tax system: President

President on 2-day J&K visit from Wednesday
April 15, 2026

Nagpur: The Income Tax Act, 2025 which came into force from April 1 is a historic step towards a modern,...

Read moreDetails

Global growth needs unconstricted energy markets: Jaishankar on Hormuz disruption

Victims of terrorism do not sit together with perpetrators of terrorism: Jaishankar
April 15, 2026

New Delhi: Against the backdrop of closure of the Strait of Hormuz, India on Wednesday made a strong pitch for...

Read moreDetails

West Asia conflict threatens to push 2.5 million people in India into poverty: UNDP report

West Asia conflict threatens to push 2.5 million people in India into poverty: UNDP report
April 14, 2026

United Nations: The conflict and military escalation in West Asia threatens to push 2.5 million people in India into poverty...

Read moreDetails

Fuel, fertiliser prices may remain high for prolonged period: IMF, World Bank, IEA

Petrol price hit highest level under BJP govt, diesel at record high
April 14, 2026

Washington: The IMF, World Bank and the International Energy Agency said that fuel and fertiliser prices may remain high for...

Read moreDetails
Next Post

Opposition leaders welcome Kejriwal's interim bail

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.