• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, November 24, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

ERA commences massive activities to move towards unlock

Images News Netwok by Images News Netwok
June 5, 2020
in LOCAL
A A
0
Saloora, Wani join PDP along with hundreds of supporters
FacebookTwitterWhatsapp

JAMMU : To unleash economic and development process disrupted due to Covid –pandemic, Economic Reconstruction Agency (ERA) & Jhelum Tawi Flood Recovery Project ( JTFRP) has started work on multi-crore projects across Jammu and Kashmir.

The development activity has began with resumption of upgrading work on seven vital road projects- with a cumulative road length of 86 kms and construction of three new bridges in the Jammu division and over Rs 160 crore projects in Kashmir Division-under the World Bank funded Jhelum Tawi Flood Recovery Project (JTFRP).

More News

 Altaf Bukhari slams BJP leaders for opposing non-Hindu admissions at SMVDIME

Global sericulture ties strengthened as Tashkent Director visits CSRTI Pampore

Rana enquires about health of former Dy Chairman JKLC

Load More

As per Chief Executive Officer ERA & JTFRP, Dr. Syed Abid Rasheed Shah, the underlying objective of government’s move is to unlock the developmental and economic activities in the UT for the creation of employment opportunities among the locals, post- COVID scenario.

He said  JTFRP is one of the first organizations to restart the developmental activities across the UT, to revive economic scenario under stress due to the Pandemic. “Further the restart of such big ticket projects will revitalize the local economy by pumping the liquidity in the economy thus improving the post-COVID economic recovery,” he added.

In Jammu Division, the  ERA is set to start up-gradation work  on 18.29 Km Sidhra–Surinsar road; 11 Km Tutan Di Khuie to Khada- Madana road; 10 Km Malaini-Chakarbati road; 10.15 Km Chirala Link road; 27 Km Gulati to Shahdra Sharief road via Gambir Gali; 5 Km Devi Mai to Ohli Mandir road and 4.25 Km Anji-Panasa road(Reasi). As per the officials, the work on four road projects has already been awarded, while evaluation process for remaining is underway.

The up-gradation of these road projects would involve bringing the existing profile to good condition, necessary road drainage, providing the appropriate crust and surface as per design, improving road geometrics of the existing road that would create  smooth riding surface, connectivity, thus leading to less travel time, saving of fuel and preventing  wear and tear to the vehicles. The project plan also includes  construction of four vital bridges in the remote parts of the Jammu Division- Katheel Ganjoo to Barsoa Motorable steel bridge  over Ghordi Nallah and Barsoa to Patri Bridge over Barmeeen Nallah (Udhampur), besides, steel decked foot bridge over Anji Nallah at Sukhal Ghati (Reasi)  and Steel Truss bridge over Betar nallah ( Poonch).

The work on the two bridge projects has been awarded, while as the finalization of the award is in final stages. The bridges on completion would provide all weather and reliable connectivity to the people and improve the socio-economic opportunities of people living in these remote parts of the Union Territory.

Similarly, work on different prestigious Infrastructure projects have been started in North, Central & South Kashmir of Kashmir Division.

The work has been resumed on the construction of State of the Art 5 –storey additional Block at Lal Ded Maternity Hospital Srinagar, being executed by JTFRP through Project Implementation Unit, JKPCC at an estimated cost of Rs 132.5 crore.

The existing hospital is the only facility of its kind in the region to provide gynae and child care services; which are under tremendous pressure due to increasing influx of patients. The construction of the additional block would ease the pressure and meet the demand for improved facilities, including the needs for present and future and to create a more resilient infrastructure.

The new block is proposed to be constructed with base isolation technology- which is being used for the first time in J&K for disaster resilience and performance-based design.

The main features of the hospital are 82 inpatient beds, 49 floating beds, 6 modular OTs, 3 wards, State of the Art medical equipment.

In North Kashmir, work has been re started on the construction of Gogjidaji Bridge at a cost of Rs 6.17 crore. The Bridge would connect Sopore via Tarzoo-Naidkhai to Sumbal Bandipore- benefitting about 30,000 plus souls. About 15 villages would be benefitted by the bridge by paving connectivity to National Highway.  Work has also restarted on the up-gradation of Amberpora- Haritar road in Baramulla District at a cost of Rs 8.03 Cr, connecting villages of Amberpora, Akhanpora, Haritar and Rabi Gaon with a population of about 60000 souls. The road would provide an alternate route from Sopore via Tarzoo to Pattan. Resumption of work on the other sub-projects in North Kashmir will be taken up soon.

In South Kashmir, work has also been resumed on the construction of Rs 9.22 crore additional block of the Govt. Degree College, Bijbehara and up-gradation of Rs 4.98 crore Halmulla- Panchpora Kralkot road in Anantnag District.

Meanwhile, efforts are underway to resume work on the other sub-projects in south Kashmir with contractors directed to mobilize men and machinery at an earliest.

JKERA has also resumed work on some of some pending works on Jehangir Chowk Rambagh- Flyover and Grade Separator near Radio Kashmir Junction, Srinagar under the Asian Development Bank funded JKUSDIP.

 

Previous Post

COVID-19: Govt evacuates 1,09,358 stranded JK residents; 75,826 via Lakhanpur, 33,532 through special trains

Next Post

UTRC holds meeting to identify eligible prisoners for release

Images News Netwok

Images News Netwok

Related Posts

 Altaf Bukhari slams BJP leaders for opposing non-Hindu admissions at SMVDIME

Heavy rainfall and gusty winds: Altaf Bukhari urges admin to compensate the affected people
by KI News
November 24, 2025

Srinagar: Apni Party President Syed Mohammad Altaf Bukhari on Sunday expressed deep concern over LoP Sunil Sharma and other BJP...

Read moreDetails

Global sericulture ties strengthened as Tashkent Director visits CSRTI Pampore

Global sericulture ties strengthened as Tashkent Director visits CSRTI Pampore
by KI News
November 24, 2025

Pampore: In a significant step towards enhancing international cooperation in temperate sericulture, Dr. Valiyev Sayfiddin Tojiddinovich, Director of the Sericulture...

Read moreDetails

Rana enquires about health of former Dy Chairman JKLC

Javed Rana reviews water supply restoration measures in flood-affected areas of Jammu city
by KI News
November 24, 2025

JAMMU: Minister for Jal Shakti, Forest, Ecology & Environment and Tribal Affairs, Javed Ahmed Rana, today visited Government Medical College...

Read moreDetails

SC to hear on Nov 24 plea challenging climate activist Sonam Wangchuk’s detention

Will go on 28-day fast from Aug 15 if govt doesn’t initiate talks on our demands: Sonam Wangchuk
by Press Trust of india
November 24, 2025

New Delhi:  The Supreme Court is scheduled to hear on Monday a plea filed by Sonam Wangchuk's wife which termed...

Read moreDetails

JMC steps up water conservation efforts with pond restoration, streetlight installation

by KI News
November 24, 2025

JAMMU: The Jammu Municipal Corporation (JMC) is continuously striving to protect, restore and rejuvenate traditional water bodies across the city....

Read moreDetails

Chief Secy reviews implementation of VVP-II for holistic development of border villages

by KI News
November 23, 2025

JAMMU: As part of the nationwide initiative to realise the vision of Viksit Bharat, Chief Secretary, Atal Dulloo, today chaired...

Read moreDetails
Next Post
UTRC holds meeting to identify eligible prisoners for release

UTRC holds meeting to identify eligible prisoners for release

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.