• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, June 9, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

CS assesses progress on transit accommodation for Kashmiri Migrant employees at Zewan

KI News by KI News
September 22, 2025
in CITY & TOWNS, LOCAL
A A
0
CS assesses progress on transit accommodation for Kashmiri Migrant employees at Zewan
FacebookTwitterWhatsapp

SRINAGAR: Chief Secretary, Atal Dulloo, today visited the Zewan site, one of the major locations identified for the construction of transit accommodation under the Prime Minister’s Development Package (PMDP), to take a first-hand assessment of the ongoing works of flats for Kashmiri Migrant employees.

On this occasion, besides the Principal Secretary, PWD and Divisional Commissioner, Kashmir, he was accompanied by DC, Srinagar; Relief Commissioner; Chief Engineer, R&B (Central) and other concerned officers.

More News

Deputy CM discusses farmers’ issues with Bharatiya Kisan Union delegation

Grand Mufti, senior officials and surgeon call on LG

PM package employees asked to occupy allotted transit flats by July-end

Load More

During the visit, the Chief Secretary reviewed in detail the progress made on the construction of 936 one-BHK flats taken up at Zewan. Out of these, 624 flats have already been constructed, while another 312 are at different stages of execution. So far, 703 flats have been allotted, marking an increase of 51 allotments since March 2025.

The Chief Secretary also assessed timelines for further completion and was informed that 96 more flats are targeted for completion up to September 2025, followed by 72 flats between October–December 2025, and 144 flats from January–March 2026.

Reviewing the financial progress, it was informed that the revised approved cost of the Zewan project stands at Rs 197.37 Cr, out of which Rs 124.07 Cr had been utilized up to March 2025. The balance cost of Rs 73.30 Cr has been proposed as outlay for 2025–26, with Rs 36.65 Cr already released during the current financial year.

Speaking on the occasion, the Chief Secretary emphasized the need to complete the project within the set timelines and ensure early handover of completed flats. “This project must be completed on time and the completed units should be allotted to the employees without any delay,” he stressed.

Highlighting the locational advantage of the Zewan site, Dulloo added that the transit accommodations here are ideally suited for employees serving both in the Srinagar and Pulwama districts. “This site is feasible for migrant employees posted in Srinagar as well as Pulwama, and it is therefore imperative that the flats are made ready for occupation at the earliest,” he observed.

He directed the concerned executing agencies to maintain high standards of quality in construction and adhere strictly to timelines so that the objective of providing secure and dignified housing to migrant employees working in the Valley is fully realised.

The Chief Secretary is regularly monitoring the progress of all transit accommodations being raised across different districts of the Valley. These projects have witnessed tremendous progress in the last few years and are set to be completed as per the given deadlines.

It is noteworthy to mention here that at the UT level under the PMDP, a total of 6000 transit accommodations are being constructed for Kashmiri Migrant employees with a revised approved outlay of Rs 1245.38 Cr. With additional commitment from the UT Government, the total availability for the project stands at Rs 1325.85 Cr, including Rs 983.28 Cr for the construction of flats and Rs 342.57 Cr for allied works.

Previous Post

Javid Dar discusses dairy, animal husbandry in virtual meet with Union Minister

Next Post

Several legislators meet CM Omar to discuss development priorities

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

Deputy CM discusses farmers’ issues with Bharatiya Kisan Union delegation

Dy CM reviews progress of NH Projects across Jammu division
June 9, 2026

Srinagar: Deputy Chief Minister of Jammu and Kashmir, Surinder Choudhary, on Monday held a detailed discussion with a delegation of...

Read moreDetails

Grand Mufti, senior officials and surgeon call on LG

Grand Mufti, senior officials and surgeon call on LG
June 9, 2026

Srinagar: Grand Mufti of Jammu and Kashmir Mufti Nasir-ul-Islam, Registrar of Companies J&K Haamid Bukhari, Chairperson of the J&K Solace...

Read moreDetails

PM package employees asked to occupy allotted transit flats by July-end

Chief Secy reviews Mission YUVA progress across J&K districts
June 9, 2026

Srinagar: Chief Secretary Atal Dulloo on Monday directed authorities to ensure that all completed transit accommodations meant for Prime Minister's...

Read moreDetails

PDP MLA Parra joins protest against govt’s ‘attempts to evict land tillers’

PDP MLA Parra joins protest against govt’s ‘attempts to evict land tillers’
June 9, 2026

Srinagar: PDP MLA from Pulwama on Monday joined local farmers in paddy transplantation as a mark of protest against the...

Read moreDetails

J&K holds UT-level workshop on Industrial Corridors, Plug-and-Play Infrastructure

June 9, 2026

Jammu/Srinagar, June 8: The Department of Industries and Commerce, Government of Jammu and Kashmir, on Monday organised a UT-level internal...

Read moreDetails

Two habitual drug peddlers detained under PIT-NDPS Act in Reasi

June 9, 2026

Jammu:  Two notorious drug peddlers were detained under the stringent Prevention of Illicit Traffic in Narcotic Drugs and Psychotropic Substances...

Read moreDetails
Next Post
Several legislators meet CM Omar to discuss development priorities

Several legislators meet CM Omar to discuss development priorities

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.