• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, January 25, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home Latest News

Students in Kargil struggle with poor internet services, officials say efforts on to improve connectivity

Press Trust of india by Press Trust of india
May 26, 2021
in Latest News, LOCAL
A A
0
TRAI chief allays concerns on dip in mobile user base; rules out intervention
FacebookTwitterWhatsapp

More News

LG attends UP Foundation Day festivities at Lok Bhavan

Sakeena Itoo virtually inaugurates WSS, State-of-the-Art Fire Fighting System, Lift facilities at GMC Anantnag

IT Deptt encadres 44 officials under J&K IT Services

Load More

Kargil: Amid reports of students walking long distances outside their villages in search of a mobile network for online classes, authorities in Kargil are hopeful of providing uninterrupted internet connectivity to the people in the coming months across the border district in Ladakh.

Dozens of students from different villages, including Shimsha and Karkit in Drass, have to travel three kilometers daily to a hill along the Srinagar-Leh national highway to ensure their presence in the virtual classrooms due to the closure of schools in the wake of the coronavirus pandemic.

A video of one such group from Shimsha is making the rounds on social media with students, both girls and boys, seen sitting on a roadside gravel hill busy attending their classes under the open sky.

Unfortunately, we do not have internet connectivity in our village despite repeated requests for the facility and had to foot the 3 kilometre distance from our home to attend the online class, one of the students said.

Another student said they have selected the location as we do not want to go to a nearby village which is one kilometre further ahead due to the threat of the pandemic.

A girl said they are facing a lot of problems while travelling to and fro the place but have no other choice.

According to officials, Ladakh is connected to Srinagar with a single cable line at present and interruption occurs sometimes due to heavy traffic of users.

For smooth and uninterrupted connectivity, the work on the VTL PGCIL fibre cable from Srinagar side is going on. Around 80 per cent of the laying work of the optical fibre cable has already been completed, while the remaining 20 per cent will be completed within the period of three to four months, an official of BSNL said.

He said the installation of base transceiver stations at Latoo and Kaksar will also be completed soon.

A base transceiver station is a telecom equipment used to facilitate wireless communication between a mobile device and the cellular operator network.

The official further said there are 45 functional towers of BSNL in the district, out of which seven are under the Army’s jurisdiction.

An official of Jio Telecom service said there are 37 functioning towers of the company in the district, while seven more towers will be completed soon.

All the Universal Service Obligation Fund (USOF) sites would be completed by July 25. Besides, sites have been identified to install more towers which will be completed soon to increase the speed of internet in Kargil town and adjoining areas, he said.

The officials said all possible measures are being taken to provide smooth mobile and internet services to the consumers while work on strengthening the infrastructure by way of installation of mobile towers at different locations is being carried out.

Ladakh Member of Parliament Jamyang Tsering Namgyal, who was on a five-day visit to Kargil, asked the telecom operators to contact him for any hindrance with installation of towers, especially in border areas, where no objection certificate is required from the Army.

The telecom operators should specify the issue with proper reasons and bring the same into his notice, the BJP leader said during a joint meeting with officers and telecom operators to review the status of telecommunication services being provided to users and telecom infrastructure development works in the district.

The Lok Sabha MP assured that he would take up such issues personally with the authorities concerned.

Namgyal also stressed that the installation of towers in public areas should not halt due to land issues, and the technical feasibility should be the only priority to set up a tower.

In case any public hindrance occurs, the issue must be brought to the notice of the District Magistrate, Kargil, he said while chairing a joint meeting with officers and telecom operators.

Underlining the need to ensure mobile connectivity in all unconnected villages of Ladakh, the MP said complete support would be extended from his side to achieve this goal.

He also directed the officials concerned to transfer the available base transceiver stations to the villages where mobile connectivity has not reached yet.

Previous Post

26 senior doctors write to CS for inviting application for new Director SKIMS

Next Post

Rusted Shell Defused in Kunzar Tangmarg

Press Trust of india

Press Trust of india

Related Posts

LG attends UP Foundation Day festivities at Lok Bhavan

LG attends UP Foundation Day festivities at Lok Bhavan
January 25, 2026

JAMMU: Jammu Kashmir Lok Bhavan on Saturday hosted the grand celebrations of Uttar Pradesh Foundation Day at Jammu. Addressing the...

Read moreDetails

Sakeena Itoo virtually inaugurates WSS, State-of-the-Art Fire Fighting System, Lift facilities at GMC Anantnag

Sakeena Itoo virtually inaugurates WSS, State-of-the-Art Fire Fighting System, Lift facilities at GMC Anantnag
January 24, 2026

SRINAGAR: Minister for Health and Medical Education, Social Welfare and Education, Sakeena Itoo, virtually inaugurated the state-of-the-art firefighting system, G+3...

Read moreDetails

IT Deptt encadres 44 officials under J&K IT Services

KI News
January 24, 2026

JAMMU: The Jammu and Kashmir Information Technology Department has successfully encadred 44 officials of the department who were earlier appointed...

Read moreDetails

Rather asks for speedy snow clearance in Charar-i-Sharief; restoration of essential services

Speaker admits PDP’s resolutions to restore Waqf Board, cadre of officers
January 24, 2026

JAMMU: In view of heavy snowfall in higher regions of Jammu and Kashmir, Speaker J&K Legislative Assembly Abdul Rahim Rather...

Read moreDetails

All-weather rail connectivity ensures reliable foodgrain supply to Kashmir Valley, cuts logistics costs

All-weather rail connectivity ensures reliable foodgrain supply to Kashmir Valley, cuts logistics costs
January 24, 2026

NEW DELHI: In a major boost to freight transportation and essential commodity supply to the Kashmir Valley, the first full...

Read moreDetails

Sakeena Itoo virtually lays foundation stone for DIET Centre of Excellence at Kulgam

January 24, 2026

KULGAM: Minister for Education, Social Welfare, Health and Medical Education, Sakeena Itoo, today virtually laid the foundation stone of the...

Read moreDetails
Next Post
Rusted Shell Defused in Kunzar Tangmarg

Rusted Shell Defused in Kunzar Tangmarg

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.