• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, January 19, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home Latest News

Students in Kargil struggle with poor internet services, officials say efforts on to improve connectivity

Press Trust of india by Press Trust of india
May 26, 2021
in Latest News, LOCAL
A A
0
TRAI chief allays concerns on dip in mobile user base; rules out intervention
FacebookTwitterWhatsapp

More News

Secretary Transport reviews progress on Institute of Driving Training, Research Kot Bhalwal

India Post opens 2nd N-Gen Post Office of J&K Circle at Kashmir University

14th Annual Raising Day of SDRF celebrated at Srinagar

Load More

Kargil: Amid reports of students walking long distances outside their villages in search of a mobile network for online classes, authorities in Kargil are hopeful of providing uninterrupted internet connectivity to the people in the coming months across the border district in Ladakh.

Dozens of students from different villages, including Shimsha and Karkit in Drass, have to travel three kilometers daily to a hill along the Srinagar-Leh national highway to ensure their presence in the virtual classrooms due to the closure of schools in the wake of the coronavirus pandemic.

A video of one such group from Shimsha is making the rounds on social media with students, both girls and boys, seen sitting on a roadside gravel hill busy attending their classes under the open sky.

Unfortunately, we do not have internet connectivity in our village despite repeated requests for the facility and had to foot the 3 kilometre distance from our home to attend the online class, one of the students said.

Another student said they have selected the location as we do not want to go to a nearby village which is one kilometre further ahead due to the threat of the pandemic.

A girl said they are facing a lot of problems while travelling to and fro the place but have no other choice.

According to officials, Ladakh is connected to Srinagar with a single cable line at present and interruption occurs sometimes due to heavy traffic of users.

For smooth and uninterrupted connectivity, the work on the VTL PGCIL fibre cable from Srinagar side is going on. Around 80 per cent of the laying work of the optical fibre cable has already been completed, while the remaining 20 per cent will be completed within the period of three to four months, an official of BSNL said.

He said the installation of base transceiver stations at Latoo and Kaksar will also be completed soon.

A base transceiver station is a telecom equipment used to facilitate wireless communication between a mobile device and the cellular operator network.

The official further said there are 45 functional towers of BSNL in the district, out of which seven are under the Army’s jurisdiction.

An official of Jio Telecom service said there are 37 functioning towers of the company in the district, while seven more towers will be completed soon.

All the Universal Service Obligation Fund (USOF) sites would be completed by July 25. Besides, sites have been identified to install more towers which will be completed soon to increase the speed of internet in Kargil town and adjoining areas, he said.

The officials said all possible measures are being taken to provide smooth mobile and internet services to the consumers while work on strengthening the infrastructure by way of installation of mobile towers at different locations is being carried out.

Ladakh Member of Parliament Jamyang Tsering Namgyal, who was on a five-day visit to Kargil, asked the telecom operators to contact him for any hindrance with installation of towers, especially in border areas, where no objection certificate is required from the Army.

The telecom operators should specify the issue with proper reasons and bring the same into his notice, the BJP leader said during a joint meeting with officers and telecom operators to review the status of telecommunication services being provided to users and telecom infrastructure development works in the district.

The Lok Sabha MP assured that he would take up such issues personally with the authorities concerned.

Namgyal also stressed that the installation of towers in public areas should not halt due to land issues, and the technical feasibility should be the only priority to set up a tower.

In case any public hindrance occurs, the issue must be brought to the notice of the District Magistrate, Kargil, he said while chairing a joint meeting with officers and telecom operators.

Underlining the need to ensure mobile connectivity in all unconnected villages of Ladakh, the MP said complete support would be extended from his side to achieve this goal.

He also directed the officials concerned to transfer the available base transceiver stations to the villages where mobile connectivity has not reached yet.

Previous Post

26 senior doctors write to CS for inviting application for new Director SKIMS

Next Post

Rusted Shell Defused in Kunzar Tangmarg

Press Trust of india

Press Trust of india

Related Posts

Secretary Transport reviews progress on Institute of Driving Training, Research Kot Bhalwal

January 19, 2026

JAMMU: Secretary, Transport Department, Avny Lavasa, today conducted a detailed review of the ongoing works at the Institute of Driving...

Read moreDetails

India Post opens 2nd N-Gen Post Office of J&K Circle at Kashmir University

January 19, 2026

Srinagar: Jammu & Kashmir Postal Circle today inaugurated its first N-Gen Post Office in Kashmir at the University of Kashmir...

Read moreDetails

14th Annual Raising Day of SDRF celebrated at Srinagar

14th Annual Raising Day of SDRF celebrated at Srinagar
January 19, 2026

SRINAGAR: The 14th Annual Raising Day of the State Disaster Response Force (SDRF) was celebrated today with great enthusiasm at...

Read moreDetails

Shutdown of 33 KV Salia Tap line

January 19, 2026

SRINAGAR, JANUARY 19: Chief Engineer, Distribution, KPDCL has informed that the Shutdown of 33 KV Salia Tap line will be...

Read moreDetails

DC Baramulla reviews status of KCC cases

January 19, 2026

BARAMULLA: Deputy Commissioner (DC) Baramulla, Minga Sherpa, today chaired a review meeting at the DC Office Meeting Hall to assess...

Read moreDetails

CM Omar meets Amit Shah in Delhi, discusses various matters concerning J&K

CM Omar meets Amit Shah in Delhi, discusses various matters concerning J&K
January 19, 2026

CM Omar meets Amit Shah in Delhi, discusses various matters concerning J& KNO DESK Srinagar, Jan 19 (KNO): Jammu and...

Read moreDetails
Next Post
Rusted Shell Defused in Kunzar Tangmarg

Rusted Shell Defused in Kunzar Tangmarg

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.