• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, June 7, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Lowest bidder for Zojila tunnel quotes Rs 4,509 cr: NHIDCL

Press Trust of india by Press Trust of india
August 22, 2020
in TOP NEWS
A A
0
Lowest bidder for Zojila tunnel quotes Rs 4,509 cr: NHIDCL
FacebookTwitterWhatsapp

New Delhi: Megha Engineering & Infrastructure Ltd (MEIL) emerged as the lowest bidder for the prestigious Zojila Pass tunnel to provide all-year connectivity between Jammu and Kashmir and Ladakh union territories, the National Highways and Infrastructure Development Corporation Ltd (NHIDCL) said on Friday.

Among the three bidders in the race including Larsen & Toubro and Ircon International JV, the Hyderabad-headquartered company had quoted the lowest Rs 4,509.5 crore for the tunnel project, stuck for over six years now.

More News

No safe haven for cross-border smugglers, peddlers or terror financiers in J&K: LG

J&K govt files review petition before SC on conduct of TET: Edu minister Itoo

NC slams ‘unelected’ Mehbooba Mufti for visiting AIIMS to ‘review’ construction

Load More

The project holds strategic significance as Zojila Pass is situated at an altitude of 11,578 feet on the Srinagar-Kargil-Leh National Highway and remains closed during winters due to heavy snowfall.

“MEIL has emerged as the lowest bidder by quoting Rs 4,509.5 crore for the Zojila Pass tunnel project,” an NHIDCL official said.

Road Transport and Highways Minister Nitin Gadkari last month had said that the work on the project will start soon.

Prime Minister Narendra Modi had in May 2018 laid the foundation stone for the Rs 6,800 crore project, billed as the Asia’s longest bi-directional tunnel, in Jammu and Kashmir.

However, barely months after the foundation, the NHIDCL on January 15, 2019 terminated the contract awarded to troubled IL&FS group company IL&FS Transportation after it abandoned the project citing financial problems.

Earlier this year, the Ministry of Road Transport and Highways through NHIDCL had invited bid for “construction of 14.15 km long tunnel across Zojila Pass on Sonmarg-Kargil section of NH-1 between union territories of J&K and Ladakh along with approaches” through an engineering, procurement and construction (EPC) contract.

“MEIL has become L-1 in Zojila Pass tunnel in Jammu Kashmir-Ladakh in Himalayan region. NHIDCL has opened the bids on Friday, and MEIL topped the list by quoting less than other companies. …the Zojilla tunnel is to be built in horseshoe shape of 14.15 km as a two-road lane of 9.5 metres wide and 7.57 metres high. This project will have to carry out innovatively in the most critical conditions,” MEIL said in a statement.

The company said the project is in complex hill and its completion schedule is 72 months.

“This whole project has to executed in two parts. The first part is 18.50 kilometres of road, and the second part is 14.15 kilometres as a tunnel…”, it said.

Gadkari had said that the tunnel for all-year connectivity between Leh and Srinagar may undergo some design changes to prevent cost escalation.

The cancellation of the award in January last year was the second time NHIDCL had scrapped the contract for the 14.15-km tunnel project.

The corporation had earlier cancelled the bid of IRB Infrastructure. IL&FS Transportation in 2017 emerged as the lowest bidder in the rebidding process.

Unveiling a plaque for commencement of work for the tunnel, Modi had said, “Zojila tunnel is not a mere tunnel but a modern day marvel.”

The Cabinet on January 3, 2018 had approved the Zojila tunnel project with Parallel Escape (Egress) tunnel between Baltal and Minamarg on the Srinagar-Leh section of NH-1A at a total cost of Rs 6,800 crore.

The project was expected to be completed in seven years.

Previous Post

LG inaugurates first phase of Jammu ring road project

Next Post

NEET UG 2020 exam on September 13

Press Trust of india

Press Trust of india

Related Posts

No safe haven for cross-border smugglers, peddlers or terror financiers in J&K: LG

No safe haven for cross-border smugglers, peddlers or terror financiers in J&K: LG
June 7, 2026

Jammu: Lieutenant Governor Manoj Sinha on Saturday led a ‘padyatra’ (march) in Kishtwar as the ongoing drug-free J&K campaign reached...

Read moreDetails

J&K govt files review petition before SC on conduct of TET: Edu minister Itoo

Sakeena Itoo reviews performance, functioning of J&K Medical Supplies Corporation Limited
June 7, 2026

Srinagar: The Jammu and Kashmir government has filed a review petition before the Supreme Court on the conduct of the...

Read moreDetails

NC slams ‘unelected’ Mehbooba Mufti for visiting AIIMS to ‘review’ construction

Want elected govt to handle law & order: MLA Tanvir Sadiq
June 7, 2026

Srinagar: The ruling National Conference (NC) on Saturday termed as "unfortunate" the visit of former chief minister Mehbooba Mufti to...

Read moreDetails

HC cancels bail of rape accused, orders him to surrender

PM Modi inaugurating incomplete projects for votes: JKPCC
June 7, 2026

Srinagar: The High Court of J&K and Ladakh has cancelled the bail granted to a rape accused man from Sumbal,...

Read moreDetails

UNSC membership huge responsibility, not forum for peddling biased, false narratives: India slams Pak

Pakistan violated spirit of IWT by inflicting three wars, thousands of terror attacks on India: India tells UN
June 7, 2026

United Nations:  India has slammed Pakistan for its "unwarranted reference" to Jammu and Kashmir at the UN, telling the current...

Read moreDetails

Health sector reforms: CS calls for expansion of trauma, emergency, critical-care services

Chief Secy reviews Mission YUVA progress across J&K districts
June 7, 2026

Srinagar: Chief Secretary, Atal Dulloo, today chaired a comprehensive review meeting to assess the progress achieved under the Health Sector...

Read moreDetails
Next Post
NEET UG 2020 exam on September 13

NEET UG 2020 exam on September 13

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.