• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, August 8, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Tangmarg villages up in arms against PDD for pesky power cuts

Images News Netwok by Images News Netwok
February 26, 2018
in LOCAL
A A
0
Tangmarg villages up in arms against PDD for pesky power cuts
FacebookTwitterWhatsapp

Baramulla: Scores of villages of various areas of Tangmarg Baramulla are up in arms against pesky power cuts in the area from many months now.

The people from dozens of villagers including Solinda, Katipora, Ferozpora, Treran, Hariwatnoo, Sonlipora, Ratnipora etc alleged that the PDD Tangmarg is not following proper schedule for power curtailment.

Related posts

Minister promises increased ration quota, gas cylinders as ‘New Year gift’ to people

Satish Sharma asks to intensify, continue drive against adulterated meat

August 8, 2025
KI News

Food Safety Deptt seizes unsafe meat products, seals multiple premises

August 8, 2025

The unscheduled power cuts are not only affected the routine life of the people but also the local business.

“I am running a computer institute but without proper electricity how can it be run smoothly? Besides unscheduled power cuts are having serious toll on the students’ community,” said one Khursheed Ahmad.

While talking to The Kashmir Images Assistant Executive Engineer PDD Sub Division Tangmarg Bashir Ahmad said, “Actually the curtailment program prepared for Tangmarg area  is as per schedule but there is grid curtailment after every two hours for one hour. The curtailment is done by Nihalpora grid station but the problem will be resolved within a week or so after the Drung power project is operational. The Nihalpora Grid actually don’t allow load beyond 280 ampere and we have to ensure electricity to essential areas like Gulmarg,Gondola and Club etc. We will ensure power supply as per schedule.”

Previous Post

Kavinder convenes public meet at Babliana, assures early action on demands

Next Post

Taylor, Latham guide New Zealand to win over England

Images News Netwok

Images News Netwok

Next Post
Taylor, Latham guide New Zealand to win over England

Taylor, Latham guide New Zealand to win over England

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.