• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, August 10, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

DC Anantnag reviews Shri Amarnath Ji Yatra 2019 arrangements

Images News Netwok by Images News Netwok
May 15, 2019
in LOCAL
A A
0
DC Anantnag reviews Shri Amarnath Ji Yatra 2019 arrangements
FacebookTwitterWhatsapp

ANANTNAG, MAY 14: Deputy Commissioner Anantnag Khalid Jahangir today convened a meeting of the officers to review the status of arrangements made for the Shri Amarnath Ji Yatra 2019.

The DC emphasized that Yatra track condition is of foremost importance and entire focus should be laid on clearance of the track. He said that necessary restoration works must be completed on priority. The DC was informed that reckie of the entire route up to the Holy cave has been completed and snow clearance has been started and would be completed by 25th May 2019 up to Sheshnag.

Related posts

Itoo calls for timely disbursal of payments to eligible beneficiaries of welfare schemes

Sakeena Itoo inaugurates Science Block at GHSS D K Marg Kulgam

August 10, 2025
Decades of injustice against tribals in J&K ended in August 2019: LG Sinha

LG condoles passing away of eminent electronics engineer, Dr. MJ Zarabi

August 10, 2025

The DC directed for maintenance of proper sanitation and cleanliness at base camps and Halt Stations en route to the Holy cave, besides segregation of non-biodegradable component made by using solid waste management.

To improve the drinking water facilities, DC urged to complete the construction of 20000-Gallon capacity filtration plant at Pahalgam. Executive Engineer PHE Division Bijbehara was asked to ensure erection of PSPs by 5th June 2019 at Nunwan Base Camp & Chandanwari.

Executive Engineer R&B Division Khanabal was instructed to carry patchwork of Pahalgam – Chandanwari road on priority.

Superintending Engineer (SE) PDD was directed to ensure uninterrupted power supply at Base Camp & Halt Stations, besides keeping additional Generator Sets in standby mode and ensure installation of lighting systems by 1st week of June 2019.

CMO Anantnag informed the meeting that Medical facilities at 24 stations will remain available 24×7, including doctors, paramedics & essential medicines. The CMO was directed to ensure sufficient number of Oxygen Cylinders, X-Ray & ECGs facilities available at Chandanwari and other stations, besides all medical teams must reach to their stations one week prior to the commencement of the Yatra.

The DC directed for timely registration of Ponnies, Poniwalas, Dandiwalas and Palkiwalas. He stressed to ensure timely permission for pitching of tents, keeping in view the layout plan of each Yatra camp.

ARTO, Anantnag was directed that adequate transport should be made available during the Yatra season so that Yatries do not face any inconvenience.

FCS&CA Department was directed to keep sufficient stocks of rice, Atta, sugar, K.Oil & LPG available at all stations en route to the Holy cave.

The DC directed Dy. Director Fire & Emergency Services Anantnag to impart orientation training regarding fire fighting and other safety measures to Langarwalas & other service providers.

DM BSNL was directed to ensure hustle free telecommunication services to the Yatries. The DC was informed that 3G Services & Hotspot services shall be made available to the Yatries.

It was given out that Joint Control Room & Emergency Operation Centres shall be made operational one week before the commencement of the Yatra. Further, Mountain Rescue Teams shall remain available at seven locations from Chandanwari to Holy cave.

The DC urged the officers to work with added zeal and in complete coordination to ensure smooth conduct of the Shri Amarnath Ji Yatra 2019.

The meeting was attended by SP Headquarters, ADC Anantnag, CEO PDA, SDM Pahalgam, SE PDD, CMO Anantnag, Xens of R&B, PHE, PMGSY, EOs of MC Pahalgam & Ashmuqam and  other district officers.

Previous Post

Secy Tourism reviews status of PMDP projects, Capex Budget 2019-20

Next Post

VC SKUAST-K, Director SKIMS meet Governor

Images News Netwok

Images News Netwok

Next Post
VC SKUAST-K, Director SKIMS meet Governor

VC SKUAST-K, Director SKIMS meet Governor

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.