• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, January 20, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

‘International Day for Disaster Risk Reduction’: Experts call for increasing River Jhelum’s carrying capacity to 120,000 cusecs to prevent 2014-like floods

KNO by KNO
October 14, 2023
in TOP NEWS
A A
0
FacebookTwitterWhatsapp

Srinagar: Completion of both phases of the Flood Mitigation Plan in Kashmir is a significant step towards minimising flood-related damages, but further measures are necessary for comprehensive protection, according to the experts.

While the ongoing work in the tributaries of Jhelum is part of phase 2, the experts suggest increasing the carrying capacity of the River Jhelum to 120,000 cusecs for effective flood management.

More News

J&K among five UTs where LGs empowered to take action under Drugs and Magic Remedies Act

Paratrooper injured in Kishtwar succumbs as search ops continue; hideout busted

LG Sinha pays tribute to fallen paratrooper

Load More

A senior official from the Irrigation & Flood Control Department, emphasised the importance of augmenting Jhelum’s capacity to handle potential floods.

He confirmed that work on the flood management plan’s second phase is currently underway, focusing on the Jhelum’s tributaries and other critical areas. The successful completion of both phases will undoubtedly reduce flood-related damages in the Kashmir region, he said.

“The completion of phase 2 will increase the Jhelum’s capacity to 60,000 cusecs, having already reached 40,000 cusecs in phase 1,” he stated. However, this capacity will still not suffice to manage the massive volume of water that breached the Jhelum at multiple locations during the devastating 2014 floods.

“If Jhelum’s capacity remains at 60,000 cusecs, it will not be sufficient to prevent embankment breaches as happened in the event of September 2014 floods – even though damages now may not be as severe as in 2014 when the Jhelum’s capacity was only around 30,000 cusecs,” the engineer, who works on the Flood Management Plan, explained.

He further noted that the completion deadline for phase 2 is three years, and timely funding and acquisition processes will be critical in ensuring the project’s successful completion within the stipulated time frame.

The Flood Management Plan, undertaken in two phases, received funding under the Prime Minister’s Development Package, allocating Rs 399 crore for phase 1. This phase included spot dredging and enhancing Jhelum’s capacity to minimize potential damage.

After the 2014 floods, a government committee was formed that recommended long-term measures such as supplementary flood spill channels, storage facilities on Jhelum’s tributaries, floodplain zoning, and enhancing Wular Lake’s capacity. (With inputs from KNO)

Previous Post

J&K lost 30% of glaciers in 6 decades, last year saw record melting: Experts

Next Post

95% of healthcare-associated infections are device-related: Study

KNO

KNO

Related Posts

J&K among five UTs where LGs empowered to take action under Drugs and Magic Remedies Act

MHA approves forensic institute in J&K after AIIMS proposal
January 20, 2026

New Delhi: Lieutenant Governors or administrators of five Union territories will now have the power to authorise officers to search...

Read moreDetails

Paratrooper injured in Kishtwar succumbs as search ops continue; hideout busted

VDGs want automatic weapons, enhanced allowances
January 20, 2026

Jammu:  A paratrooper, who was critically injured in a gunfight with terrorists, succumbed to his injuries on Monday, while the...

Read moreDetails

LG Sinha pays tribute to fallen paratrooper

Higher education institutions must focus on innovation, employability: LG Sinha
January 20, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Monday paid homage to Havildar Gajendra Singh of the Indian Army's special forces, who...

Read moreDetails

CM Omar Abdullah calls on HM Amit Shah

CM Omar Abdullah calls on HM Amit Shah
January 20, 2026

New Delhi:  Jammu and Kashmir Chief Minister Omar Abdullah called on Union Home Minister Amit Shah here on Monday and...

Read moreDetails

Healthcare is bedrock for stable, vibrant and prosperous society: LG

Healthcare is bedrock for stable, vibrant and prosperous society: LG
January 20, 2026

Srinagar: “Healthcare is the bedrock for building a stable, vibrant and prosperous society. Industry leaders in the healthcare sector must...

Read moreDetails

Kashmiri Pandits always welcome to return home: Farooq Abdullah

NC-led govt achieved a lot in one year despite UT status: Farooq Abdullah
January 20, 2026

Jammu:  National Conference president Farooq Abdullah on Monday said Kashmiri Pandits are always welcome to return to their homes in...

Read moreDetails
Next Post
COVID-19 caseload in India climbs to 94.99 lakh with 36,604 infections

95% of healthcare-associated infections are device-related: Study

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.