• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, August 28, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

CS directs for giving major facelift to Jammu City before Gandhi Jayanti

Images News Netwok by Images News Netwok
August 23, 2023
in CITY & TOWNS
A A
0
CS directs for giving major facelift to Jammu City before Gandhi Jayanti
FacebookTwitterWhatsapp

JAMMU: Chief Secretary, Dr Arun Kumar Mehta, chaired a meeting of officers to take stock of different works taken up under Smart City projects and meant to add to the aesthetic appeal of the city.

The meeting was attended by ACS, Jal Shakti; Principal Secretary, PWD; Principal Secretary, H&UDD; Commissioner Secretary, GAD; Divisional Commissioner, Jammu; Secretary Tourism; Commissioner JMC, Deputy Commissioner, Jammu; Executive Director, Mubarak Mandi Heritage Society beside others.

Related posts

LG thanks Centre for sanctioning 316 road projects under PMGSY

LG chairs high-level meeting to review rescue & relief operations

August 27, 2025
CM chairs high-level meeting on relief and restoration measures in Jammu

CM chairs high-level meeting on relief and restoration measures in Jammu

August 27, 2025

Dr Mehta observed that the face of Jammu should undergo a substantial change by October 2 (Gandhi Jayanti) this year. He emphasized on completion of the maximum possible ongoing projects by then. He added that these projects would give a massive facelift to the city and would help it emerge as a major tourist destination in the country.

The Chief Secretary reviewed the pace on different projects taken up under the Smart City Mission. He took stock of the progress of work and simultaneously passed on several directions for early completion of each of them.

Regarding the Mubarak Mandi, the Chief Secretary enjoined upon the officers to throw open the completed portions of the heritage buildings to the public. He asked them to start the cultural and other folk activities in the complex depicting the rich history and traditions of Jammu.

The Chief Secretary also asked them to dedicate more restored structures to the public and enhance the overall aura of the complex by landscaping of the complex. He also asked to complete the rest of the work by December this year.

The Chief Secretary took note of other projects like the development of intersections, Apsara Road Gandhi Nagar, the use of ITMS for regulating traffic, illumination of bridges and buildings, development of roads and other infrastructure besides works in and around the city. He recalled that dozens of projects were completed in the past couple of years which along with the progressing ones are going to make Jammu one of the best places in the country.

The Chief Secretary was informed that out of the total of 124 Smart City works, 80 stands completed by now. It was further given out that the work on the rest of these projects is going on at a satisfactory pace and is going to be completed within the deadlines set for them.

Earlier in the morning the Chief Secretary visited the Tawi banks to take on spot assessment of the prestigious Tawi Barrage project. He directed for increasing pace of work on this project and a target for the pondage of the lake before November this year.

He emphasised on completing other allied projects of beautification simultaneously to make it a go-to place for the visitors coming here. He also took an e-cycle ride on the newly developed cycle track on the banks of the river and called it a good addition to the city’s infrastructure. He observed that besides providing a leisurely experience in an eco-friendly atmosphere it would give the opportunity of improving on health of the riders as well.

On the occasion, it was revealed that the Tawi Riverfront phase-I is going to be completed soon followed by Phase II. It includes the construction of embankments/retaining walls with channelized sections 250m wide and for a length of 3.5km on both sides. It was given out that raising of barrage height to achieve adequate water height (ponding) at Gujjar Nagar bridge is also part of it.

Pertinently, the JSCL is developing the Tawi Riverfront as the most important project for the development of the city. The 7 KM long riverfront is proposed to be completed in 2 phases. The first phase starts from the 4th bridge to the Main Tawi Bridge and phase 2 from the Main Tawi Bridge to the Gujjar Nagar Bridge. Pathways would be constructed on both sides (banks) of the river to provide easy access to the public.

Previous Post

Shailendra advises farmers to maximize benefits of govt schemes in agri-allied sector

Next Post

Social media playing with the social fabric

Images News Netwok

Images News Netwok

Next Post
New social media rules may raise compliance cost, make competition tough for smaller cos: Ind execs

Social media playing with the social fabric

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.