• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, June 16, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

CAG questions selection of projects in J&K under Centre’s key scheme for tourism sector

Images News Netwok by Images News Netwok
August 15, 2023
in TOP NEWS
A A
0
CAG pulls up JKPCC for poor performance, not finalising accounts
FacebookTwitterWhatsapp

Srinagar: The Comptroller and Auditor General of India has slammed the Jammu & Kashmir Government for selecting three projects under the Tourism Ministry’s “Swadesh Darshan” scheme.

The CAG report, which was tabled in the Parliament in the recently concluded monsoon session, has pointed out that these projects were selected without considering factors such as current tourist traffic, connectivity potential, and stakeholder consultation.

More News

A deal has been reached to end Iran war; Trump orders stop to US naval blockade

Hope US-Iran peace deal holds until formal signing of accord: Omar Abdullah

Muharram-ul-Haram to begin from Wednesday: Grand Mufti

Load More

The Swadesh Darshan scheme was launched by the Union Tourism Ministry in 2015 for the development of tourist infrastructure in India.

In its report, a copy of which is in possession of news agency KNO, the CAG said that these projects were picked up from existing developed tourist destinations or unviable sites were selected.

“As per the scheme guidelines, tourist circuits/destinations were to be identified considering factors such as current tourist traffic, connectivity potential and significance attached to the site, holistic tourist experience. However, identification criteria for the components planned and executed under the project was not mentioned in the respective DPRs. The projects were picked up from existing developed tourist destinations or unviable sites were selected. It was noticed that three projects were planned without considering factors such as current tourist traffic, connectivity potential, stakeholder consultation,” the CAG said.

The CAG revealed that a project under the scheme was executed at Suchetgarh , Jammu, despite being a sensitive location.

“Suchetgarh (Jammu) is situated in a sensitive border location. Despite knowing this fact, the state government selected this location for the execution of a project under the Himalayan circuit in Jammu & Kashmir and completed it by incurring an expenditure of Rs 3.71 crore. During the site visit, it was noticed that the project completed under the scheme is occupied and used by the Border Security Force (BSF) for their operational purposes, hence defeating the very purpose of the project,” reads the report.

The CAG noticed that Jammu & Kashmir government took up a project under the scheme in Salamabad Uri without ensuring availability of land for it.

“The component ‘Integrated Development of Border Tourism at Salamabad-Uri’ under Swadesh Darshan Scheme was entrusted to J&K Projects Construction Corporation (JKPCC) by State Tourism Department. The land belonged to National Hydroelectric Power Corporation NHPC) and despite knowing this fact, the implementing agency went ahead with project execution. During physical inspection, it was seen that NHPC had constructed a wall around the land and work had been stopped after incurring an expenditure of Rs 1.27 crore for earthwork for basement and foundation columns, etc., which thus proved to be unfruitful,” the report states.

The CAG report mentions that the J & K Government took up work for an amusement park at Tattoo Ground Srinagar without ensuring availability of land for the same.

“Similarly, land of Amusement Park at Tattoo Ground, Srinagar was in occupation by the Armed Forces. Without ensuring land availability, work was taken up and an expenditure of Rs 0.16 crore was incurred. Later, the Armed Forces did not allow construction and work was stopped. Thus, due to poor planning, the project turned out to be a total loss and got dropped,” the report states.

Previous Post

Independence Day: Liberation in Diversity, Celebration in Unity

Next Post

Eastern Ladakh row: India, China hold fresh military talks

Images News Netwok

Images News Netwok

Related Posts

A deal has been reached to end Iran war; Trump orders stop to US naval blockade

A deal has been reached to end Iran war; Trump orders stop to US naval blockade
June 16, 2026

Islamabad:  The United States and Iran have reached an agreement to end the war and open the Strait of Hormuz,...

Read moreDetails

Hope US-Iran peace deal holds until formal signing of accord: Omar Abdullah

Hope US-Iran peace deal holds until formal signing of accord: Omar Abdullah
June 16, 2026

Srinagar: Chief Minister Omar Abdullah on Monday said he hoped the agreement to end the US-Iran war holds until the...

Read moreDetails

Muharram-ul-Haram to begin from Wednesday: Grand Mufti

Ramzan to begin on March 2 across J&K: Mufti Nasir-ul-Islam
June 16, 2026

Srinagar: The New of Islamic Calendar, Muharram-ul-Haram, will commence in Jammu and Kashmir from Wednesday, June 17, 2026. This announcement...

Read moreDetails

LG releases 15th edition of Amarnath Yatra guidebook

LG releases 15th edition of Amarnath Yatra guidebook
June 16, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Monday released the 15th edition of the Amarnath Yatra guidebook at Lok Bhavan here....

Read moreDetails

Amarnath Yatra provides opportunity to end hate across India: PDP chief

Mehbooba questions ban on over 30 TV channels
June 16, 2026

Srinagar: PDP president Mehbooba Mufti on Monday said safeguarding the annual Amarnath Yatra is the duty of Kashmiris, and an...

Read moreDetails

CM reviews Muharram arrangements across Jammu & Kashmir

CM reviews Muharram arrangements across Jammu & Kashmir
June 16, 2026

  Srinagar: Chief Minister Omar Abdullah today chaired a high-level meeting to review the arrangements being put in place for...

Read moreDetails
Next Post
‘US closely monitoring India-China border row, does not want it to escalate’

Eastern Ladakh row: India, China hold fresh military talks

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.