• About us
  • Contact us
  • Our team
  • Terms of Service
Saturday, August 9, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Flyover near Banihal-Qazigund tunnel develops crack; traffic diverted

Press Trust of india by Press Trust of india
August 24, 2021
in TOP NEWS
A A
0
FacebookTwitterWhatsapp

Banihal/Jammu: A minor crack was spotted on the ‘macadamized road’ of a flyover near the recently opened Banihal-Qazigund tunnel along the 270-km-long Jammu-Srinagar national highway on Monday, prompting diversion of traffic for repairs, officials said.

Traffic movement on the double-tube four-lane tunnel was, however, going on smoothly, they said.

Related posts

AC extends Amnesty Scheme-2022 for domestic consumers of electricity till March 2025

Govt warns against banned synthetic food colours in Wazwan, ready-to-eat foods

August 9, 2025
Minister promises increased ration quota, gas cylinders as ‘New Year gift’ to people

‘Crackdown against unhygienic, substandard foods will continue’

August 9, 2025

The officials said workers noticed the crack on the stretch between the toll plaza in Banihal and the tunnel early Monday, following which traffic coming from Kashmir towards Jammu was immediately diverted.

“A small patch of the flyover has developed a minor crack which is being taken care of to ensure early restoration of traffic movement,” an official of the Navyug construction company told PTI.

He said it is a minor issue as all the pillars of the flyover are safe.

The 8.5-km-long Banihal-Qazigund tunnel, built at a cost of Rs 2,100 crore, was opened for traffic early this month.

Work on the tunnel, which is part of an ongoing four-lane highway project, was started in June 2011 by the Navyug engineering company, and its operationalisation reduced travel time between Jammu and Srinagar by about 1.5 hours.

Previous Post

Notion of normality in Kashmir is far from reality: Yashwant Sinha

Next Post

J&K reports 93 fresh COVID-19 cases, one death

Press Trust of india

Press Trust of india

Next Post
32k Covid-19 tests conducted in Phase-I of Special Drive in Srinagar

J&K reports 93 fresh COVID-19 cases, one death

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.