• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, November 20, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home NATION

ISRO loses contact with GSAT-6A, trying to establish link

Press Trust of india by Press Trust of india
April 2, 2018
in NATION
A A
0
FacebookTwitterWhatsapp

Bengaluru, Apr 1 : Two days after India’s latest communication satellite with military applications GSAT-6A was launched, the Indian Space Research Organisation (ISRO) today said it had lost contact with it and was making efforts to establish link.

The space agency lost communication with the satellite when it attempted to ignite the engine in a third and final move to its desired location after its March 29 textbook launch from the space port of Sriharikota in Andhra Pradesh.

More News

SC strikes down key provisions of Tribunals Reforms Act, says Parliament can’t override verdicts

Nitish Kumar elected as leader of NDA in Bihar

Samrat Choudhary named BJP legislature party leader in Bihar

Load More

The second orbit raising operation of GSAT-6A was successfully carried out on Saturday, but when it was on course to normal operating configuration for the third and final firing scheduled for April 1, communication with the satellite was lost, the space agency said after maintaining unusual silence on the health of the satellite.

A satellite is placed in orbit in three phases.

“Efforts are underway to establish link with the satellite,” Bengaluru-headquartered ISRO said on its website.

The 2,140-kg GSAT-6A rode piggyback on ISRO’s powerful geosynchronous rocket (GSLV-F08) fitted with indigenous cryogenic engine at the third stage and was put into orbit successfully after the launch in what was described by a senior ISRO official as a “magnificent mission”.

GSAT-6A is aimed at helping in mobile communication even from very remote locations through hand-held ground terminals and is considered a shot in the arm for the armed forces.

The space agency’s unusual silence regarding the satellite had set off speculation about its health.

ISRO, which normally communicates on its website about the orbit raising operations like it did on March 30, following the success of the first orbit raising operation, had not released any update since then.

The last update was on March 30, wherein it said, “The first orbit raising operation of GSAT-6A Satellite has been successfully carried out by Liquid Apogee Motor (LAM) Engine firing for 2188 sec from 09:22hr IST on March 30, 2018.”

“Orbit Determination results from this LAM firing are: apogee X perigee height was changed to 36412 km X 5054 km. Inclination is 11.93 deg. Orbital period is 12hr 45min,” it had said.

ISRO did not spell out what went wrong.

Reports, however, suggest that the glitch was related to the satellite’s power system after the second orbit-raising exercise yesterday, following which ISRO’s top brass have reportedly gone into a huddle towards setting things right.

The orbit raising operation is carried out to hurl the satellite to its space home.

GSAT-6A, with a mission life of about 10 years, is designed to provide thrust to mobile communication through multi-beam coverage facility.

The satellite is also aimed at providing a platform for developing technologies such as demonstration of 6 m S-Band Unfurlable Antenna, hand-held ground terminals and network management techniques that could be useful in satellite-based mobile communication applications.

“GSAT-6A is a complement to GSAT6, already in orbit. These two satellites combined will provide a platform for development of advanced technologies,” ISRO Chairman K Sivan had said post the launch.

This was the first mission for Sivan, who assumed charge of the space agency in January.

In August last year, India’s mission to launch its backup navigation satellite IRNSS-1H on board PSLV-C39 ended in a failure after a technical fault on the final leg following a perfect launch.

ISRO had then said the heat shield had not separated on the final leg of the launch sequence and, as a result, IRNSS-1H had got stuck in the fourth stage of the rocket.

Previous Post

PDP’s Mansoor Hussain bereaved

Next Post

Launch of Apple Year-2018 postponed: Dir Horticulture

Press Trust of india

Press Trust of india

Related Posts

SC strikes down key provisions of Tribunals Reforms Act, says Parliament can’t override verdicts

SC says will consider listing of pleas challenging abrogation of Article 370
by Press Trust of india
November 19, 2025

New Delhi: In a major jolt to the Centre, the Supreme Court on Wednesday struck down key provisions of the...

Read moreDetails

Nitish Kumar elected as leader of NDA in Bihar

No rift between BJP & JD(U), no hurry to sort out seat-sharing: Nitish
by Press Trust of india
November 19, 2025

Patna: JD(U) supremo Nitish Kumar was chosen leader of the NDA in Bihar during a meeting of newly elected MLAs...

Read moreDetails

Samrat Choudhary named BJP legislature party leader in Bihar

Samrat Choudhary named BJP legislature party leader in Bihar
by Press Trust of india
November 19, 2025

Patna:  Tarapur MLA Samrat Choudhary was on Wednesday named the leader of BJP legislature party in Bihar during a meeting...

Read moreDetails

Her courage, patriotism inspire me to stand against injustice: Rahul on Indira’s birth anniversary

by Press Trust of india
November 19, 2025

New Delhi:  The Congress on Wednesday paid rich tributes to former prime minister Indira Gandhi on her birth anniversary, with...

Read moreDetails

Indian mission in Jeddah sets up camp office in Madina after bus tragedy; Consul General meets lone survivor

Several Indians dead in bus accident in Madina
by Press Trust of india
November 18, 2025

Dubai:  The Consulate General of India in Jeddah has set up a camp office in Madina to assist the families...

Read moreDetails

‘Doubly disappointing’: Congress on SC recalling its verdict barring post-facto green clearances

PM leaving no stone unturned to save ‘flailing image’: Cong slams UGC’s ‘selfie points’ directive
by Press Trust of india
November 18, 2025

New Delhi:  The Congress on Tuesday termed as "doubly disappointing" the Supreme Court recalling its judgement that prohibited post-facto environmental...

Read moreDetails
Next Post

Launch of Apple Year-2018 postponed: Dir Horticulture

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.