• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, June 8, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home NATION

ISRO loses contact with GSAT-6A, trying to establish link

Press Trust of india by Press Trust of india
April 2, 2018
in NATION
A A
0
FacebookTwitterWhatsapp

Bengaluru, Apr 1 : Two days after India’s latest communication satellite with military applications GSAT-6A was launched, the Indian Space Research Organisation (ISRO) today said it had lost contact with it and was making efforts to establish link.

The space agency lost communication with the satellite when it attempted to ignite the engine in a third and final move to its desired location after its March 29 textbook launch from the space port of Sriharikota in Andhra Pradesh.

More News

Indian politics dominated by Hindu-Muslim agenda; joblessness key concern, CJP apolitical: Dipke

‘INDIA janbandhan’ united, 23 parties have confirmed participation: Congress

Mamata travels to Delhi to attend INDIA bloc meeting amid speculation of split among TMC MPs

Load More

The second orbit raising operation of GSAT-6A was successfully carried out on Saturday, but when it was on course to normal operating configuration for the third and final firing scheduled for April 1, communication with the satellite was lost, the space agency said after maintaining unusual silence on the health of the satellite.

A satellite is placed in orbit in three phases.

“Efforts are underway to establish link with the satellite,” Bengaluru-headquartered ISRO said on its website.

The 2,140-kg GSAT-6A rode piggyback on ISRO’s powerful geosynchronous rocket (GSLV-F08) fitted with indigenous cryogenic engine at the third stage and was put into orbit successfully after the launch in what was described by a senior ISRO official as a “magnificent mission”.

GSAT-6A is aimed at helping in mobile communication even from very remote locations through hand-held ground terminals and is considered a shot in the arm for the armed forces.

The space agency’s unusual silence regarding the satellite had set off speculation about its health.

ISRO, which normally communicates on its website about the orbit raising operations like it did on March 30, following the success of the first orbit raising operation, had not released any update since then.

The last update was on March 30, wherein it said, “The first orbit raising operation of GSAT-6A Satellite has been successfully carried out by Liquid Apogee Motor (LAM) Engine firing for 2188 sec from 09:22hr IST on March 30, 2018.”

“Orbit Determination results from this LAM firing are: apogee X perigee height was changed to 36412 km X 5054 km. Inclination is 11.93 deg. Orbital period is 12hr 45min,” it had said.

ISRO did not spell out what went wrong.

Reports, however, suggest that the glitch was related to the satellite’s power system after the second orbit-raising exercise yesterday, following which ISRO’s top brass have reportedly gone into a huddle towards setting things right.

The orbit raising operation is carried out to hurl the satellite to its space home.

GSAT-6A, with a mission life of about 10 years, is designed to provide thrust to mobile communication through multi-beam coverage facility.

The satellite is also aimed at providing a platform for developing technologies such as demonstration of 6 m S-Band Unfurlable Antenna, hand-held ground terminals and network management techniques that could be useful in satellite-based mobile communication applications.

“GSAT-6A is a complement to GSAT6, already in orbit. These two satellites combined will provide a platform for development of advanced technologies,” ISRO Chairman K Sivan had said post the launch.

This was the first mission for Sivan, who assumed charge of the space agency in January.

In August last year, India’s mission to launch its backup navigation satellite IRNSS-1H on board PSLV-C39 ended in a failure after a technical fault on the final leg following a perfect launch.

ISRO had then said the heat shield had not separated on the final leg of the launch sequence and, as a result, IRNSS-1H had got stuck in the fourth stage of the rocket.

Previous Post

PDP’s Mansoor Hussain bereaved

Next Post

Launch of Apple Year-2018 postponed: Dir Horticulture

Press Trust of india

Press Trust of india

Related Posts

Indian politics dominated by Hindu-Muslim agenda; joblessness key concern, CJP apolitical: Dipke

‘Crackdown’ on CJP, access to all accounts lost, says founder Abhijeet Dipke
June 7, 2026

Chhatrapati Sambhajinagar: Cockroach Janta Party founder Abhijeet Dipke on Sunday alleged that politics in the country over the last decade...

Read moreDetails

‘INDIA janbandhan’ united, 23 parties have confirmed participation: Congress

8 oppn-ruled states demand mechanism to ensure GST rate cut benefits get passed on to consumers
June 7, 2026

New Delhi: Twenty-three political parties have confirmed their participation in the "INDIA janbandhan" meeting at the Constitution Club here on...

Read moreDetails

Mamata travels to Delhi to attend INDIA bloc meeting amid speculation of split among TMC MPs

   BJP resorting to politics of killing: Mamata
June 7, 2026

Kolkata: Trinamool Congress chief Mamata Banerjee travelled to Delhi on Sunday, a day ahead of the INDIA bloc meeting, amid...

Read moreDetails

Tell them we are not scared: Abhijeet Dipke says as CJP holds protest demanding Pradhan’s resignation

‘Crackdown’ on CJP, access to all accounts lost, says founder Abhijeet Dipke
June 7, 2026

New Delhi: Hundreds of protesters gathered at Delhi's Jantar Mantar on Saturday under the banner of the Cockroach Janta Party...

Read moreDetails

Congress cold, others in Opposition warm to CJP protest at Jantar Mantar

Cong launches month-long ‘Haath Se Haath Jodo’ campaign in J&K
June 7, 2026

New Delhi: On a day when hundreds gathered at Jantar Mantar here responding to the Cockroach Janta Party's (CJP) call,...

Read moreDetails

Students, parents at CJP protest cite education concerns, seek greater political accountability

Students, parents at CJP protest cite education concerns, seek greater political accountability
June 7, 2026

New Delhi: School students, college-goers, competitive exam aspirants and parents were among those who gathered at Jantar Mantar here on...

Read moreDetails
Next Post

Launch of Apple Year-2018 postponed: Dir Horticulture

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.