• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, February 20, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Power shutdowns announced by KPDCL and JKPTCL

KI News by KI News
September 26, 2025
in CITY & TOWNS, LOCAL
A A
0
FacebookTwitterWhatsapp

Srinagar: The Kashmir Power Distribution Corporation Limited (KPDCL) and the Jammu and Kashmir Power Transmission Corporation Limited (JKPTCL) have announced a series of scheduled power shutdowns in different districts to facilitate branch cutting, preventive maintenance, and ongoing works under RDSS.

According to the Chief Engineer, Distribution, KPDCL, shutdown of several 33KV lines will be observed on different dates:

More News

BRO to upgrade Akhnoor road; Razdan Pass tunnel DPR soon, 4,142 kanal land earmarked for Anantnag industrial estates

Haripora NTPHC in govt building; land sought for Sumbal facility, Pahalgam hospital upgrade underway

LG Sinha unveiled Calendar dedicated to Legends of J-K

Load More

September 27, 2025: Rawalpora–Bagh-i-Mehtab line – Receiving Station Bagh-i-Mehtab will remain off, affecting Bagh-i-Mehtab, Gopalpora, Kralpora, Mochwa and adjoining areas (10:00 AM to 04:00 PM). Rawalpora–Chanapora line – Receiving Stations at Chanapora and Bone & Joint will remain off, affecting Lalnagar, Chanapora, Methan, Nowgam, Natipora, Budshah Nagar and adjoining areas (10:00 AM to 04:00 PM).

September 29, 2025: Rawalpora–Rangreth line – Receiving Stations at Rangreth, Wanbal, JAKLI, Beacon, SIDCO Complex, and Doodhganga will remain off, affecting Rangreth, Wanbal, Kralpora, Gogo, Yayil and adjoining areas (10:00 AM to 04:00 PM). Rawalpora–Air Force line – Receiving Stations at Peerbagh, Humhama, STC BSF, and Air Force will remain off, affecting Peerbagh, Humhama Heights, Sheikhpora, Friends Colony, Hyderpora and adjoining areas (10:00 AM to 04:00 PM). Budgam–SIDCO Tap line – Receiving Station SIDCO will remain off, affecting Sheikhpora, Ompora, Bhathara, Housing Colony, Mohanpora, Khanpora, Zorigund, Wadipora, SIDCO and adjoining areas (09:00 AM to 03:00 PM).

October 5–8, 2025: October 5 – GIS Tengpora Grid-Exhibition (Tapline) Cargo line; Receiving Stations at Exhibition, Batamaloo will remain off, affecting HSHS Market, PCR, Batamaloo, Firdousabad and adjoining areas (10:00 AM to 04:00 PM). October 6 – Rawalpora–Silk Factory and GIS Tengpora Grid–Narkara lines; Receiving Stations at Silk Factory, Narkara, and Gangbugh will remain off, affecting Allochibagh, Rambagh, Cargo, Tulsibagh, Narkara, Galwanpora, Gangbugh, Shah Anwar Colony, West End Colony, Gulbahar Colony and adjoining areas (10:00 AM to 04:00 PM).

October 7 – GIS Tengpora (Tapline) Allochibagh Bund portion and GIS Tengpora KP Bagh lines; Receiving Stations at KP Bagh and Jawahar Nagar will remain off, affecting Allochibagh, Bulbulbagh, Jawahar Nagar, Mehjoor Nagar, Soiteng, KP Bagh and adjoining areas (10:00 AM to 04:00 PM).

October 8 – TRC Rajbagh line/ KP Bagh–Rajbagh line; Receiving Station Rajbagh will remain off, affecting Rajbagh, Kursoo, Gogjibagh and adjoining areas (10:00 AM to 04:00 PM).

October 12, 2025: Bemina–Exhibition line – Receiving Stations at Court Complex, GIS Batamaloo, and Tengpora Station will remain off, affecting Hamdania Colony, Nundresh Colony, Batamaloo, Moominabad, Batamaloo Market and adjoining areas (10:00 AM to 04:00 PM). Bemina–KP Bagh line – Receiving Station Rakhiarth will remain off, affecting Rakh-i-Arth, Hamdania Colony and adjoining areas (10:00 AM to 04:00 PM).

Meanwhile, the Chief Engineer, JKPTCL Kashmir, has also announced shutdowns for routine and preventive maintenance works:

September 27, 2025: Receiving Stations at Ashajipora, Janglatmandi, Brakpora, Malaknag, Dialgam, Mirbazar, Quimoh, Redwani, Harnag, Naibasti, Sarnal, Anchidora, Akura, Vessu, Qazigund, Chowgam, Kund, and Railway will remain off, affecting the respective areas from 10:00 AM to 04:00 PM.

September 30, 2025: Receiving Stations at Kokernag, Dandipora, Hiller, Arkhahsipora, Hillar Toll Post, Dooru, Verigund, Shankerpora, and Chowgund will remain off, affecting the respective areas from 10:00 AM to 04:00 PM.

Both KPDCL and JKPTCL have appealed to consumers to bear with the inconvenience caused due to these scheduled shutdowns, which are necessary for maintenance and strengthening of the power supply network.

 

Previous Post

KVIC organized various programmes under SEVA PARV

Next Post

DLSA Budgam holds awareness prog on drug abuse, waste management

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

BRO to upgrade Akhnoor road; Razdan Pass tunnel DPR soon, 4,142 kanal land earmarked for Anantnag industrial estates

Govt to examine R&B sub-division for Ajas; infrastructure proposals, road quality issues discussed in House
February 19, 2026

Jammu: The Jammu and Kashmir Legislative Assembly on Thursday witnessed a series of government announcements relating to infrastructure, connectivity, wildlife...

Read moreDetails

Haripora NTPHC in govt building; land sought for Sumbal facility, Pahalgam hospital upgrade underway

J&K to launch cancer control plan, strengthen healthcare infrastructure
February 19, 2026

Jammu: The Jammu and Kashmir government on Thursday informed the Legislative Assembly about steps being taken to strengthen healthcare infrastructure...

Read moreDetails

LG Sinha unveiled Calendar dedicated to Legends of J-K

LG Sinha unveiled Calendar dedicated to Legends of J-K
February 19, 2026

JAMMU: Lieutenant Governor Manoj Sinha today unveiled the Calendar dedicated to Legends of Jammu Kashmir, at Lok Bhavan. Slimline Clinic...

Read moreDetails

16 water supply schemes approved for Khawas under JJM; govt reiterates relief for wildlife conflict victims

NOCs issued after scrutiny; Thanamandi water supply project gets ₹5.23 cr under AMRUT 2.0
February 19, 2026

Jammu: The Jammu and Kashmir government on Thursday informed the Legislative Assembly that several drinking water projects have been sanctioned...

Read moreDetails

J&K govt initiates liquidation of SCARD bank, assures protection of depositors’ interests: Dar

February 19, 2026

Jammu: The Jammu and Kashmir government on Thursday said the State Cooperative Agriculture and Rural Development (SCARD) Bank Ltd has...

Read moreDetails

Div Com Kashmir reviews progress on Jhelum Water Transport Project

February 19, 2026

SRINAGAR: Divisional Commissioner Kashmir, Anshul Garg, along with the Secretary Transport Department, chaired a meeting to review the progress on...

Read moreDetails
Next Post

DLSA Budgam holds awareness prog on drug abuse, waste management

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.