• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, June 17, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

BRO plans tunnels, passes to ensure all-weather connectivity in eastern Ladakh

Press Trust of india by Press Trust of india
August 3, 2025
in TOP NEWS
A A
0
FacebookTwitterWhatsapp

Leh: In a move to bolster strategic infrastructure, the Border Roads Organisation (BRO) is in the advanced planning stages of constructing numerous tunnels and high-altitude passes to ensure all-weather road connectivity in eastern Ladakh, a senior officer said on Saturday.

The BRO is also aggressively adopting new technologies to accelerate project execution in this high-altitude region, where the working season is restricted to just a few months due to harsh winter conditions.

More News

CM calls for transparent, efficient urban development

JK Bank signs MoU with Centre for pension-related services

As rains lash, strong winds damage houses, shops in parts of Kashmir; MeT forecasts wet spell till June 22

Load More

“Primarily, Ladakh is linked by two national highways – NH 1 and NH 3. We are responsible for NH 3. The Rohtang tunnel has already come up and we are planning on a few tunnels along passes like Baralacha and Tanglang,” Col. Deepak Palande, director, works and resources, Project Himank, told PTI here.

BRO’s Project Himank was raised for the development of road communication in Ladakh region. It ensures the maintenance of communication and access to strategic areas close to the Line of Actual Control with China.

Col. Palande said the planning of these tunnels is at a “very advanced stage”.

“The alignments are almost approved and the final survey is on. The detailed project report will be made soon,” he added.

He said each tunnel will have a different timeline, varying from five to seven years.

“It is a very complex project. It depends on soil composition, soil content, rock content, technical surveys, geo survey reports, GSI-GTI reports. All these reports come into play,” the officer said.

The tunnels will help in ensuring all-weather road connectivity to eastern Ladakh, the area under Project Himank, he added.

On the strategic importance of the roads in eastern Ladakh, Col. Palande said, “Every road is important because it helps in movement of defence logistics, personnel, equipment and whatever military resources are required to be deployed during operations. These can be moved easily and it provides the flexibility for planning the military operations.”

The officer also said construction of several passes, including many high-altitude ones, is also going on.

“We have completed Umling La. Mig La is coming up. Marshimik La has already come up,” he said.

Umling La is currently the world’s highest motorable pass at a height of 19,024 ft above sea level, which will be succeeded by Mig La at 19,400 ft once completed.

Eight out of 14 highest motorable passes in the world are currently under Project Himank.

“There are other roads and passes across the Ladakh region which we are working on. For every ridge to be crossed, it has to be generally through a pass,” the top official said.

Col. Palande said the BRO is not following only the standard practices, it is adopting technology aggressively in its works in this crucial sector.

“For example, we are investing and harvesting technology in terms of pre-cast. The working season is quite limited here, about six months. So, to apply your resources more effectively, pre-cast is helping us,” he added.

Previous Post

Bihar polls: INDIA bloc leaders to meet in Delhi next week, says Farooq Abdullah

Next Post

Drug peddler detained under PIT NDPS Act in Handwara

Press Trust of india

Press Trust of india

Related Posts

CM calls for transparent, efficient urban development

CM calls for transparent, efficient urban development
June 17, 2026

    Srinagar, Jun 16: Chief Minister Omar Abdullah on Tuesday called for transparent, efficient and sustainable urban development, stressing...

Read moreDetails

JK Bank signs MoU with Centre for pension-related services

J&K Bank Promotes 694 employees across scales
June 17, 2026

Srinagar: Jammu and Kashmir Bank on Tuesday signed an MoU with the Union Ministry of Personnel, Public Grievances and Pensions...

Read moreDetails

As rains lash, strong winds damage houses, shops in parts of Kashmir; MeT forecasts wet spell till June 22

As rains lash, strong winds damage houses, shops in parts of Kashmir; MeT forecasts wet spell till June 22
June 17, 2026

Srinagar: Several parts of Jammu and Kashmir witnessed gusty winds, rain and thundershowers on Tuesday afternoon as the Meteorological Centre...

Read moreDetails

Union MoS Ajay Tamta reviews J&K highway projects, highlights ₹1.35 lakh crore infrastructure push

Union MoS Ajay Tamta reviews J&K highway projects, highlights ₹1.35 lakh crore infrastructure push
June 17, 2026

JAMMU: Union Minister of State for Road Transport and Highways Ajay Tamta concluded a two-day visit to Jammu and Kashmir...

Read moreDetails

Police attach drug peddlers’ properties worth Rs 4 crore

Three OGWs held in Pulwama: Police
June 17, 2026

Srinagar: Police attached properties worth Rs 4 crore belonging to three drug peddlers in Pulwama and Srinagar districts on Tuesday,...

Read moreDetails

All arrangements in place for Amarnath Yatra: Jitendra Singh

BJP broke alliance with PDP over discrimination against Jammu: MoS PMO
June 17, 2026

Srinagar: Union Minister Jitendra Singh on Tuesday said all arrangements, including security, have been put in place for the smooth...

Read moreDetails
Next Post
Drug peddler held in Budgam

Drug peddler detained under PIT NDPS Act in Handwara

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.