• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, August 5, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Major leap in railway safety: Kavach 4.0 commissioned on Mathura-Kota section of Delhi-Mumbai route

KI News by KI News
July 31, 2025
in CITY & TOWNS, LOCAL
A A
0
FacebookTwitterWhatsapp

New Delhi, July 30: In a significant milestone for Indian Railways, the indigenous Automatic Train Protection (ATP) system Kavach 4.0 has been successfully commissioned on the Mathura-Kota section of the high-density Delhi-Mumbai corridor.

The deployment of this advanced safety system marks a crucial step in modernizing the nation’s railway infrastructure and enhancing passenger safety.

More News

No religion permits killing innocents: CM on Kulgam attack

Dy CM directs fast-tracking of key mining projects to revive JK Minerals Ltd

Javed Rana reviews Jal Jeevan Mission progress, calls for faster fund flow

Load More

Unveiling the development, Railway Minister Ashwini Vaishnaw emphasized the system’s indigenous origins and its alignment with the Atmanirbhar Bharat vision of Prime Minister Narendra Modi. “Railways has indigenously designed, developed, and manufactured the Kavach system. While many developed nations took decades to develop such systems, India has commissioned Kavach 4.0 in record time. This is a major achievement,” he said.

Approved by the Research Designs and Standards Organisation (RDSO) in July 2024, Kavach 4.0 represents the most advanced iteration of the safety technology. It is designed to prevent train collisions, enforce speed limits, and ensure automatic braking in case of emergency situations—even in low-visibility conditions such as fog.

Indigenous Innovation Backed by National Vision

Developed with Safety Integrity Level 4 (SIL-4), the highest level of safety certification, the Kavach system began its journey in 2015. After undergoing rigorous testing and initial deployment in the South Central Railway zone, Indian Railways incorporated feedback to develop the upgraded Kavach 4.0, which was approved in May 2025 for speeds up to 160 kmph.

All key components of the system—including RFID tags, telecom towers, on-board equipment, and control systems—are being manufactured domestically, ensuring reduced reliance on imports and bolstering India’s self-reliance in high-end rail technologies.

How Kavach Works

Kavach is a highly complex safety mechanism, equivalent in scope to setting up a complete telecom infrastructure. Key components of the system include:

RFID Tags: Installed every 1 km and at each signal point to pinpoint the exact location of trains.

Telecom Towers: Erected along the track for real-time communication between trains and control centers.

Loco Kavach: Integrated into locomotives to relay and receive critical safety information, including automated braking.

Station Kavach: Installed at all stations and block sections, guiding train movement based on signalling and safety protocols.

Optical Fibre Network: Enables high-speed data transfer between all subsystems.

Integrated Signalling System: Ensures seamless coordination between on-ground and onboard systems.

These components work in tandem to monitor train speeds, enforce limits, and trigger automatic brakes to prevent collisions. In foggy conditions, loco pilots receive signal information directly on their dashboard, eliminating the need to rely on external visuals.

Scaling Up Across India

Indian Railways has ambitious plans to deploy Kavach across key routes nationwide within the next six years. So far, significant progress has been made:

Sr. No. Item Progress
1 Optical fibre laid 5,856 km
2 Telecom towers installed 619
3 Kavach installed at stations 708
4 Kavach installed on Locos 1,107
5 Trackside equipment installed 4,001 Rkm

Over 30,000 personnel have been trained on the Kavach system. Additionally, the Indian Railway Institute of Signal Engineering and Telecommunications (IRISET) has partnered with 17 AICTE-approved engineering institutions to introduce Kavach modules into their B.Tech curricula, ensuring a steady pipeline of trained engineers for future deployments.

A New Era in Rail Safety

Kavach 4.0 is one among several safety initiatives for which Indian Railways allocates over ₹1 lakh crore annually. Its commissioning on one of the busiest railway corridors in India is a testament to the Railways’ commitment to world-class safety standards.

With Kavach 4.0 now operational on the Mathura-Kota section, Indian Railways sets the stage for its rollout across the country, reinforcing safety, reliability, and technological excellence in Indian train operations.

 

 

 

 

 

 

 

Previous Post

WCL semifinal: Indian Champions refuse to play against Pakistan keeping sentiments in mind

Next Post

CS assesses implementation of SBM-Urban, AMRUT 2.0 in J&K

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

No religion permits killing innocents: CM on Kulgam attack

CM assures priority redressal of public concerns
August 5, 2026

Srinagar: Chief Minister Omar Abdullah on Tuesday termed the killing of two migrant labourers in Kulgam district as "very unfortunate"...

Read moreDetails

Dy CM directs fast-tracking of key mining projects to revive JK Minerals Ltd

Govt committed to catalyse youth initiatives: Dy CM
August 5, 2026

SRINAGAR: Deputy Chief Minister Surinder Choudhary on Tuesday directed Jammu and Kashmir Minerals Limited (JKML) to fast-track key mining projects...

Read moreDetails

Javed Rana reviews Jal Jeevan Mission progress, calls for faster fund flow

Govt committed to preserving Kashmir’s houseboat heritage: Javed Rana
August 5, 2026

SRINAGAR: Minister for Jal Shakti, Forest, Ecology and Environment, and Tribal Affairs, Javed Ahmed Rana, on Tuesday reviewed the progress...

Read moreDetails

Centre tells Rajya Sabha J&K achieved 100% immunisation coverage in 2025-26

Parliament’s Monsoon session ends: Lok Sabha, Rajya Sabha adjourned sine die
August 5, 2026

NEW DELHI: The Union Government has informed the Rajya Sabha that Jammu and Kashmir achieved 100 per cent Full Immunisation...

Read moreDetails

Govt rebuts editorial on industrial policy, cites record investment in J&K

August 5, 2026

SRINAGAR: The Jammu and Kashmir Government on Tuesday rejected claims made in an editorial titled "Self-Inflicted Industrial Isolation", published in...

Read moreDetails

Early Census 2027 headcount in J&K’s snow-bound areas from Sept 1

August 5, 2026

SRINAGAR: The headcount phase of Census 2027 will begin in Jammu and Kashmir's snow-bound non-synchronous areas from September 1, with...

Read moreDetails
Next Post

CS assesses implementation of SBM-Urban, AMRUT 2.0 in J&K

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.