• TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
Wednesday, June 25, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Power shutdown schedule announced across multiple areas for maintenance work

KI News by KI News
May 21, 2025
in CITY & TOWNS, LOCAL
0

SRINAGAR: The Kashmir Power Distribution Corporation Limited (KPDCL) has announced a series of scheduled power shutdowns in various parts of the Valley to carry out essential maintenance work, including branch cutting, tree pruning, and infrastructure upgradation.

According to the Chief Engineer, Distribution, KPDCL, in order to carry out branch cutting/ pruning of trees coming under alignment of these 33 KV Lines, shutdown of 33KV Potushai Aloosa line shall be observed due to which 33/11KV Receiving Station at Aloosa shall remain off while power supply to Aloosa, PHE, Quail, Malangam and adjoining areas besides BB Cant Tap Line will be affected from 10:00 AM to 04:00 PM on 23 May, 2025.

Related posts

Govt committed to save old industrial units, promote new ventures: Dy CM

Govt committed to save old industrial units, promote new ventures: Dy CM

June 25, 2025
Delegation of Shri Amarnath Ji Yatra Welfare Society, others call on LG

Delegation of Shri Amarnath Ji Yatra Welfare Society, others call on LG

June 25, 2025

Similarly, the shutdown of 33KV Potushai Nadihal Line/ 33 KV Ajar line shall be observed due to which 33/11KV Receiving Stations at Ajar, Nusoo, Naidhal, Panzigam, Ajas shall remain off while power supply to Nusoo, Naidhal, Ajas, Garoora, Papchan, Nishat, Argam, Ajar, Arin, Saderkoot, Sadnara, Authwatoo and adjoining areas will be affected from 10:00 AM to 04:00 PM on 24 May, 2025.

Further, the shutdown of 33KV Potushai Gurez line shall be observed due to which 33/11KV Receiving Stations at Dawar, Gurez shall remain off while power supply to Dawar, Wanpora, Tragbal, NHPC and adjoining areas will be affected from 10:00 AM to 04:00 PM on 25, 27 & 29 May 2025.

Meanwhile, in a separate shutdown schedule issued from the office of Chief Engineer KPDCL, in order to facilitate upgradation of 33 KV Wanpoh SICOP line from 0.1 ACSR to 0.2 ACSR, the shutdown of 33KV Wanpoh SICOP line shall be observed due to which 33/11KV Receiving Stations at Shamsipora, SICOP, Zirpara, Veer and Cheeniwadder shall remain off while power supply to Shamsipora, SICOP, Bijbehara, Darigund, Kanelwan, Veer, Zirpara, Jablipora, Srigufwara and adjoining areas will be affected from 09:00 AM to 03:00 PM on 22, 24 & 26 May, 2025.

Previous Post

Gujarat Titans eye top-two finish as struggling LSG look to salvage pride

Next Post

District Admin reaches out to fire victims in Narwara Nawakadal

Next Post

District Admin reaches out to fire victims in Narwara Nawakadal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: [email protected]

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.