• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, August 3, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Hyperloop project being developed at IIT Madras will become world’s longest: Vaishnaw

Press Trust of india by Press Trust of india
March 16, 2025
in BUSINESS
A A
0
FacebookTwitterWhatsapp

Chennai: The ambitious Hyperloop project under development at the Indian Institute of Technology Madras will feature the longest Hyperloop tube in Asia, measuring 410 meters, and is set to become the world’s longest soon, Union Minister Ashwini Vaishnaw said on Sunday.

The Minister for Railways, Information & Broadcasting, and Information Technology, who was on a short visit to the city, inspected the Hyperloop project at IIT Madras on March 15.

More News

India approves just 1 Chinese FDI proposal worth Rs 1 cr, 13 Hong Kong proposals worth Rs 610.42 cr

Petrol, diesel sales soar on weak monsoon rains, LPG demand shifts to piped gas

PM Modi inaugurates Bhogapuram Airport, says Andhra poised to become manufacturing hub

Load More

He stated that the electronics component technology for the Hyperloop project would be developed at the Integral Coach Factory in Chennai.

“Longest Hyperloop tube in Asia (410 meters)… soon to be the world’s longest @iitmadras,” Vaishnaw said in a social media post on Sunday, sharing a video of his visit to the IIT Madras campus.

Hyperloop is considered the fifth mode of transportation—a high-speed train that travels in a near-vacuum tube. The reduced air resistance allows the capsule inside the tube to reach speeds of over 1,000 km per hour.

The entire testing system for Hyperloop transportation has been developed using indigenous technologies, and India is expected to be ready for Hyperloop transportation soon, as tests conducted so far have yielded promising results, he said.

In May 2022, the Ministry of Railways approved an allocation of Rs 8.34 crore to IIT Madras to indigenously develop and validate the Hyperloop transportation system and its subsystems.

Previous Post

Mangaluru police bust biggest-ever drug cartel in Karnataka, arrest two South African nationals

Next Post

India, New Zealand announce resumption of FTA talks

Press Trust of india

Press Trust of india

Related Posts

India approves just 1 Chinese FDI proposal worth Rs 1 cr, 13 Hong Kong proposals worth Rs 610.42 cr

India top recipient of Commonwealth FDI: Report
August 2, 2026

  New Delhi:  India approved just one Chinese FDI proposal worth Rs 1 crore, while clearing 13 applications from Hong Kong...

Read moreDetails

Petrol, diesel sales soar on weak monsoon rains, LPG demand shifts to piped gas

Petrol price hit highest level under BJP govt, diesel at record high
August 2, 2026

New Delhi: Petrol and diesel sales by India's three state-run fuel retailers rose sharply in July as below-normal monsoon rainfall...

Read moreDetails

PM Modi inaugurates Bhogapuram Airport, says Andhra poised to become manufacturing hub

Nation responds to PM’s call for fuel conservation
August 1, 2026

Visakhapatnam: Highlighting the development potential of Andhra Pradesh, Prime Minister Narendra Modi on Saturday said global companies are exploring opportunities...

Read moreDetails

Commercial LPG prices cut by Rs 192, ATF rates up Rs 5/litre

Niti Aayog working on proposal ‘to replace LPG subsidy with cooking subsidy’
August 1, 2026

New Delhi: The prices of commercial LPG -- used in establishments such as hotels and restaurants -- were on Saturday...

Read moreDetails

Gross GST mop-up grows 15.4% to over Rs 2.11 lakh cr in July on higher imports, sales

August 1, 2026

New Delhi: Gross GST collections grew 15.4 per cent to over Rs 2.11 lakh crore in July on higher mop-up...

Read moreDetails

Cabinet approves extension of PM-KISAN scheme till FY’31 with outlay of Rs 3.15 lakh crore

Cabinet nod to expand infra, academic capacity of five IITs
August 1, 2026

New Delhi: The government on Friday extended the PM-KISAN scheme for the next five years till 2030-31 with a total...

Read moreDetails
Next Post
India, New Zealand announce resumption of FTA talks

India, New Zealand announce resumption of FTA talks

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.