• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, August 11, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Power connection mandatory for under-construction buildings: KPDCL

Images News Netwok by Images News Netwok
July 13, 2024
in TOP NEWS
A A
0
Power connection mandatory for under-construction buildings: KPDCL
FacebookTwitterWhatsapp

Srinagar: Kashmir Power Distribution Corporation Limited (KPDCL) has advised the owners of under-construction commercial and residential buildings to immediately apply for temporary connection (TC) in the concerned Electric Subdivision offices for running operations that require electricity.

The owners can apply for TC, after following due procedure as enshrined in the Supply Code and avail TC facility easily.

Related posts

PM flags off Amritsar – Shri Mata Vaishno Devi Katra Vande Bharat Train, LG expresses gratitude

PM flags off Amritsar-Shri Mata Vaishno Devi Katra Vande Bharat Train

August 11, 2025
June 6 is a special day for entire J&K: PM

Indian tech, Make In India behind Operation Sindoor’s success: PM Modi

August 11, 2025

In a press statement issued here today, a KPDCL spokesperson informed the owners that electricity connection for under-construction commercial and residential buildings is mandatory and not applying for connection and using electricity unauthorisedly shall invite punitive action under the Electricity Act.

He further stated that directions have been issued to all Executive Engineers of KPDCL to inspect and frame a list of under-construction buildings with the status of power connections.

Giving details, the KPDCL spokesperson said those owners who apply for a new electricity connection for their under-construction buildings falling in the commercial or residential category, get a temporary line along with a meter at a specified rate which will be converted into a permanent one at notified tariff when the construction activity is completed.

The spokesperson warned that KPDCL shall initiate stringent action against owners of under-construction buildings who fail to apply for TC and are caught using electricity illegally.

Previous Post

MHA amends business rules of J&K Govt

Next Post

Two dead, 25 injured as bus plunges into gorge in Doda

Images News Netwok

Images News Netwok

Next Post
1 dead, 14 injured as vehicle falls into gorge in Udhampur

Two dead, 25 injured as bus plunges into gorge in Doda

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.