• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, August 5, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Railways conducts trial run on world’s highest arch rail bridge in J&K

Press Trust of india by Press Trust of india
June 21, 2024
in TOP NEWS
A A
0
Railways conducts trial run on world’s highest arch rail bridge in J&K

File Photo

FacebookTwitterWhatsapp

New Delhi:  Indian Railways on Thursday successfully conducted a trial run of a eight-coach MEMU train on the world’s highest railway bridge — Chenab Bridge — in Jammu and Kashmir, paving the way for the start of rail service on the route from Reasi to Baramulla in Kashmir.

“After an extensive inspection of the newly constructed Chenab Bridge by senior officers from Railway Board, Northern Railway and Konkan Railway, a trial run was conducted on a 46-km-long electrified line section between Sangaldan in Ramban district and Reasi at a speed of 40 kmph,” the Railway Ministry said in a statement.

More News

Modi Govt brought back 274 fugitives from 36 countries between 2019 and 2026: MHA

J&K joins league of fully literate states under ULLAS scheme: LG Sinha

Ahead of August 5, PDP stages candle light protest

Load More

“It was successfully carried out starting at 12:35 pm from Sangaldan and reaching Reasi at 2:05 pm. On the way it passes through nine tunnels with a combined length of 40.787 km and longest tunnel T-44 of 11.13 km,” it added.

According to the ministry, it was the first ever full train that crossed over the iconic bridge between Dugga and Bakkal stations across the Chenab river, which is the world’s highest arch railway bridge.

The stations — Reasi, Bakkal, Dugga and Sawlakote — are situated in the Reasi district of J&K.

“The electrification work on this section has been executed with state-of-the-art technology, ROCS (Rigid Overhead Conductor System) at 25 kV, for the first time on railways,” the ministry said.

The Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, including the 48.1-km-long Banihal-Sangaldan section, was inaugurated by Prime Minister Narendra Modi on February 20, 2024.

Phase I of the project, covering the 118 km long Qazigund-Baramulla section, was inaugurated in October 2009 under the Congress-led UPA govt.

Subsequent phases saw the inauguration of the 18 km long Banihal-Qazigund section in June 2013 and the 25 km Udhampur-Katra section in July 2014.

In February 2024, the first electric train trial run from Banihal to Khari to Sangaldan section on the Banihal-Katra section of the USBRL project in Ramban was successfully conducted on around 40 km of track and tunnels between Banihal and Sangaldan railway stations in Ramban district.

“After conduction of a series of such tests, this bridge would be open to run all train services which will be a monumental stride towards the seamless integration of the Kashmir valley with Jammu and the broader Indian landscape,” the ministry said.

It added, “This would foster social integration by facilitating easier movement of people and goods, thereby promoting cultural exchanges and regional development and boost to economic activities such as tourism and trade.”

With the aim to provide an alternative and a reliable transportation system to Jammu and Kashmir, the Indian Railways has successfully laid a 272-km-long railway line from Udhampur to Baramulla joining the Kashmir valley with the rail network under the USBRL project.

In view of the importance of the USBRL project in providing seamless and hassle-free connectivity, the Project was declared as “National Project” in 2002.

The USBRL Project involves 38 Tunnels (combined length of 119Km), the longest Tunnel (T-49) having a length of 12.75 Km and is the country’s longest transportation tunnel.

There are 927 bridges (combined length of 13 Km). These bridges include the iconic Chenab Bridge (Overall length 1315 m, Arch span of 467 m and height of 359 m above river bed) which is around 35 metres taller than the Eiffel Tower and is pegged to be the World’s highest arch railway bridge.

Previous Post

Yoga Day: Mufti alleges J&K employees being forced to take part, govt denies

Next Post

‘When will full statehood be restored, elections be held in J&K?’ – Cong on PM’s visit

Press Trust of india

Press Trust of india

Related Posts

Modi Govt brought back 274 fugitives from 36 countries between 2019 and 2026: MHA

MHA approves forensic institute in J&K after AIIMS proposal
August 5, 2026

New Delhi: The Ministry of Home Affairs (MHA) on Tuesday said that 274 fugitive criminals were brought back to India...

Read moreDetails

J&K joins league of fully literate states under ULLAS scheme: LG Sinha

India’s greatest strength lies in its young population: LG
August 5, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Tuesday said Jammu and Kashmir has joined the league of fully literate states and...

Read moreDetails

Ahead of August 5, PDP stages candle light protest

Ahead of August 5, PDP stages candle light protest
August 5, 2026

Srinagar: Ahead of August 5, the 7th anniversary of Articles 370 and 35 A abrogation, Peoples Democratic Party (PDP) held...

Read moreDetails

Article 370 abrogation ensured equality, justice, one Constitution in J&K: BJP

Article 370 abrogation ensured equality, justice, one Constitution in J&K: BJP
August 5, 2026

Jammu: Jammu and Kashmir unit of the BJP on Tuesday said the abrogation of Article 370 by the Centre on...

Read moreDetails

2026-27 Budget announcements: CM stresses timely delivery, tangible outcomes

2026-27 Budget announcements: CM stresses timely delivery, tangible outcomes
August 5, 2026

Srinagar: Chief Minister Omar Abdullah today chaired a review meeting at the Civil Secretariat to assess the progress on the...

Read moreDetails

Cabinet clears Gulmarg hotel outsourcing, IT park, land transfers, JKAS promotions

GoI transfers Hotel Gulmarg Ashok to J&K govt
August 5, 2026

Srinagar: The Jammu & Kashmir Cabinet on Tuesday cleared several major proposals aimed at boosting tourism and infrastructure in the...

Read moreDetails
Next Post
Congress condemns terror attack in Reasi, questions chest-thumping normalcy propaganda of Modi govt

‘When will full statehood be restored, elections be held in J&K?’ - Cong on PM's visit

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.