• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, June 16, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Jmu-Sgr highway remains closed for second day, restoration work on

Images News Netwok by Images News Netwok
July 10, 2023
in TOP NEWS
A A
0
Traffic resumes on Sgr-Jmu highway after 13-hour closure
FacebookTwitterWhatsapp

Banihal: Traffic movement on the Jammu-Srinagar national highway remained suspended for the second day on Sunday as authorities stepped up efforts to restore the road amid improved weather conditions, officials said.

The 270-km highway was closed for traffic on Saturday following heavy rains overnight that triggered multiple landslides and also washed away a portion of nearly 40-metre road stretch near Panthiyal tunnel in Ramban district.

More News

A deal has been reached to end Iran war; Trump orders stop to US naval blockade

Hope US-Iran peace deal holds until formal signing of accord: Omar Abdullah

Muharram-ul-Haram to begin from Wednesday: Grand Mufti

Load More

The closure of the highway left over 3,500 vehicles, including those carrying Amarnath pilgrims from Jammu to Kashmir, stranded at different places.

After hectic efforts, the highway was partially opened for stranded vehicles with concerned agencies bypassing the damaged road stretch by connecting an old road alignment and clearing the debris, the officials said.

However, they said sinking of road at Chamba near Seeri and fresh landslides at Mehar and Cafeteria Morh forced the authorities to suspend the traffic once again.

Ramban Deputy Commissioner Massarat Islam, along with Senior Superintendent of Police, traffic national highway, Rohit Baskotra, and senior officials of the National Highways Authority of India (NHAI) visited the problematic spots, including Panthiyal, to inspect the ongoing works.

“Efforts are going on at war-footing to ensure early opening of the highway. The damaged portion of road near Panthiyal was a temporary arrangement as work on a bridge was going on. The engineers are working on a plan to make the permanent bridge connecting T3 and T5 tunnels motorable to allow traffic through T5 tunnel bypassing Panthiyal slide,” NHAI Project Director Parshutam Kumar was quoted as saying by PTI.

He said necessary works like filling and grading are in progress to allow traffic via the newly constructed bridge over Panthiyal Nullah.

“Different agencies are working round-the-clock to ensure early restoration of the highway. We request people to know the condition of the road from the traffic department before starting their journey,” SSP Baskotra said.

He said all the pilgrims stranded on the highway are safe and are being provided all facilities.

Ajay Kumar, an engineer working with a private construction company, said they are expecting to provide an alternative road near Panthiyal tunnel by this evening. (With inputs from PTI)

 

Previous Post

CRPF conducts sanitisation operation around Jammu base camp of Amarnath Yatra

Next Post

2 soldiers among 4 drown to death as J&K receives heavy rains

Images News Netwok

Images News Netwok

Related Posts

A deal has been reached to end Iran war; Trump orders stop to US naval blockade

A deal has been reached to end Iran war; Trump orders stop to US naval blockade
June 16, 2026

Islamabad:  The United States and Iran have reached an agreement to end the war and open the Strait of Hormuz,...

Read moreDetails

Hope US-Iran peace deal holds until formal signing of accord: Omar Abdullah

Hope US-Iran peace deal holds until formal signing of accord: Omar Abdullah
June 16, 2026

Srinagar: Chief Minister Omar Abdullah on Monday said he hoped the agreement to end the US-Iran war holds until the...

Read moreDetails

Muharram-ul-Haram to begin from Wednesday: Grand Mufti

Ramzan to begin on March 2 across J&K: Mufti Nasir-ul-Islam
June 16, 2026

Srinagar: The New of Islamic Calendar, Muharram-ul-Haram, will commence in Jammu and Kashmir from Wednesday, June 17, 2026. This announcement...

Read moreDetails

LG releases 15th edition of Amarnath Yatra guidebook

LG releases 15th edition of Amarnath Yatra guidebook
June 16, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Monday released the 15th edition of the Amarnath Yatra guidebook at Lok Bhavan here....

Read moreDetails

Amarnath Yatra provides opportunity to end hate across India: PDP chief

Mehbooba questions ban on over 30 TV channels
June 16, 2026

Srinagar: PDP president Mehbooba Mufti on Monday said safeguarding the annual Amarnath Yatra is the duty of Kashmiris, and an...

Read moreDetails

CM reviews Muharram arrangements across Jammu & Kashmir

CM reviews Muharram arrangements across Jammu & Kashmir
June 16, 2026

  Srinagar: Chief Minister Omar Abdullah today chaired a high-level meeting to review the arrangements being put in place for...

Read moreDetails
Next Post
Youth drowns to death in Kupwara

2 soldiers among 4 drown to death as J&K receives heavy rains

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.