• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, June 17, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

J&K rail project: Country’s first cable-stayed rail bridge in Reasi completed

Press Trust of india by Press Trust of india
April 30, 2023
in TOP NEWS
A A
0
J&K rail project: Country’s first cable-stayed rail bridge in Reasi completed
FacebookTwitterWhatsapp

Jammu: The work on the country’s first cable-stayed railway bridge at Anji Khad in Reasi district of Jammu and Kashmir has been completed, Railway Minister Ashwini Vaishnaw said.

The completion of the bridge drew praise from Prime Minister Narendra Modi who is keenly monitoring the Udhampur-Srinagar-Baramulla Railway Link (USBRL), which will provide rail connectivity between the Kashmir Valley and the rest of the country.

More News

CM calls for transparent, efficient urban development

JK Bank signs MoU with Centre for pension-related services

As rains lash, strong winds damage houses, shops in parts of Kashmir; MeT forecasts wet spell till June 22

Load More

“In 11 months, India’s first cable-stayed rail bridge (Anji Khad) is ready…,” Railway Minister Ashwini Vaishnaw tweeted on Friday, sharing a video of the completed bridge. The total length of the cable strand used in the bridge is 653 km.

Reacting to Vaishnaw’s tweet, the prime minister wrote “excellent”.

The completion of Anji Khad bridge, having a single pylon with a height of 331 metres above the river bed on Udhampur-Srinagar-Baramulla Rail Link (USBRL), is yet another major breakthrough achieved by the Indian Railways, which is expecting to complete the Rs 37,000 crore project by the end of this year.

Minister of State for Railways Darshana Vikram Jardosh, who recently inspected the USBRL project by visiting various key locations including Anji Khad bridge and the nearby iconic Chenab bridge, termed the completion of the country’s first cable-stayed bridge as “another milestone” despite difficult geographic conditions.

“I visited the bridge site and congratulated everyone for successfully installing all 96 cables of the bridge in a record time of 11 months. This asymmetrical cable-stayed bridge crosses the deep gorges of Anji river, a tributary of river Chenab,” she said.

Jardosh said the bridge connects tunnel T2 on the Katra side and Tunnel T3 on the Reasi side.

“It has been the PM’s vision to make Indian railways the best in the world. Overcoming geographic and climatic challenges, our engineers and railway officials have conquered the invincible,” the minister said.

Described as a “true engineering marvel”, the bridge has 48 cables each on lateral and central spans with work on its pylon started in 2017, officials said, adding the pylon is standing 191 metre from its foundation level.

They said It is the second highest railway bridge after the iconic arch bridge over Chenab at Kauri, which is the highest railway bridge in the world being 359 metres above the river bed level — 35 metres higher than the iconic Eiffel tower in Paris.

Anji Khad bridge has a total length of 473.25 metres, while the length of the viaduct is 120 metres. The central embankment has a length of 94.25 meters, the officials said.

They said the bridge has been designed to handle heavy storms of strong winds and even explosions.

In October 2016, the Railways decided to build a cable-stayed bridge at Anji Khad after the plan to build an arch bridge similar to Chenab bridge was abandoned due to vulnerability of the structure, primarily due to concerns over geological stability of the region.

The Railway Ministry sanctioned the construction of the railway line from Udhampur to Baramulla via Srinagar in phases — 25-km Udhampur to Katra in 1994, 118-km Qazigund to Baramulla and 129-km Katra to Qazigund in 1999.

In view of the importance of the USBRL in providing seamless and hassle-free connectivity to Kashmir, the 272-km-long rail link was declared as a “National Project” in 2002.

Out of the total 272-km USBRL project, 161-km was commissioned in phases with first phase 118-km Qazigund-Baramulla section commissioned in October 2009, followed by 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014. The work on the 111-km Katra-Banihal stretch is going on.

Previous Post

J&K Housing Board to allot 336 flats to non-locals under PMAY(U) in Jammu

Next Post

J&K Police trains officers in use of space application, drone technology

Press Trust of india

Press Trust of india

Related Posts

CM calls for transparent, efficient urban development

CM calls for transparent, efficient urban development
June 17, 2026

    Srinagar, Jun 16: Chief Minister Omar Abdullah on Tuesday called for transparent, efficient and sustainable urban development, stressing...

Read moreDetails

JK Bank signs MoU with Centre for pension-related services

J&K Bank Promotes 694 employees across scales
June 17, 2026

Srinagar: Jammu and Kashmir Bank on Tuesday signed an MoU with the Union Ministry of Personnel, Public Grievances and Pensions...

Read moreDetails

As rains lash, strong winds damage houses, shops in parts of Kashmir; MeT forecasts wet spell till June 22

As rains lash, strong winds damage houses, shops in parts of Kashmir; MeT forecasts wet spell till June 22
June 17, 2026

Srinagar: Several parts of Jammu and Kashmir witnessed gusty winds, rain and thundershowers on Tuesday afternoon as the Meteorological Centre...

Read moreDetails

Union MoS Ajay Tamta reviews J&K highway projects, highlights ₹1.35 lakh crore infrastructure push

Union MoS Ajay Tamta reviews J&K highway projects, highlights ₹1.35 lakh crore infrastructure push
June 17, 2026

JAMMU: Union Minister of State for Road Transport and Highways Ajay Tamta concluded a two-day visit to Jammu and Kashmir...

Read moreDetails

Police attach drug peddlers’ properties worth Rs 4 crore

Three OGWs held in Pulwama: Police
June 17, 2026

Srinagar: Police attached properties worth Rs 4 crore belonging to three drug peddlers in Pulwama and Srinagar districts on Tuesday,...

Read moreDetails

All arrangements in place for Amarnath Yatra: Jitendra Singh

BJP broke alliance with PDP over discrimination against Jammu: MoS PMO
June 17, 2026

Srinagar: Union Minister Jitendra Singh on Tuesday said all arrangements, including security, have been put in place for the smooth...

Read moreDetails
Next Post
BSF ups ante against drones in anticipation of Republic Day 

J&K Police trains officers in use of space application, drone technology

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.