• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, May 19, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Excavation of Khellani tunnel’s 1st tube in Doda completed before deadline

Press Trust of india by Press Trust of india
March 5, 2023
in TOP NEWS
A A
0
Work on Z-Morh, Zojila tunnels will be completed ahead of schedule: NHIDCL
FacebookTwitterWhatsapp

Doda/Jammu: The National Highways and Infrastructure Development Corporation Ltd (NHIDCL) has completed the excavation of the first tube of the strategic Khellani tunnel along NH 244, an alternative road connecting Kashmir with the rest of the country.

The work on the 1.574 km tunnel, which is crucial for the Sudhmahadev-Goha-Khalleni-Chhatroo-Khanabal highway project, started on March 25, 2021, to provide alternative all-weather connectivity and shorten the distance between Doda and Kishtwar districts by 30 km, an official said.

More News

Fuel, LPG supplies normal across J&K: Oil Industry

Thajwas Glacier lost 86% area, 88% volume since Neoglaciation: Study

Kashmir records above normal temp as Srinagar sizzles at 31.5 C

Load More

“The breakthrough on the Khellani project was achieved on February 24 but because of the loose strata, we are in the process of stabilising it. Within another 10 days, the work will be completed and in the next 7 to 8 months, this tunnel will be made motorable,” senior site engineer, NHIDCL, Harjeet Singh said.

He said the work on the second tube is also going on at a brisk pace and if everything goes as planned, the breakthrough is expected by April-end.

The Khellani tunnel, constructed at a cost of Rs 431.28 crore, will bypass the slide-prone Batote-Pul Doda which has already been declared “unsafe” due to the reservoir of Baglihar hydroelectric project.

In 2008, around half-a-kilometre patch of the highway between Batote and Pul Doda washed away due to capillary action caused by Baglihar pondage, the officials said.

The management staff of APCO Infra-Tech Private Limited, which is the contractor of the Khellani tunnel project, are also positive to complete the construction of the tunnel in time after the breakthrough of one of the twin tubes of the tunnel.

“We started the work on this tunnel in March 2021 and we have completed above 85 percent of the work and have already successfully made the breakthrough of the 1st tube. There are maximum chances that we will complete the work within time,” Assistant General Manager, Khellani Tunnel Project, Vinay Kumar Singh said.

He said the road has been planned to reduce the travelling time for the inhabitants of the Doda and Kishtwar districts and boost the economy of the area besides providing an alternate all-weather road between Jammu and Srinagar.

Doda district vice-president of BJP, Sanjay Saraf credited the local member parliament and Union Minister Jitendra Singh for his efforts in sanctioning and fast-tracking the work on the project.

“This road will change the fortunes of the people of Doda and Kishtwar as the tourism industry emerging as the mainstay of the economy of the region will surely get a major boost because visitors no longer will be compelled to ply on a dangerous and treacherous road, instead they can enjoy the shorter and safer journey,” Saraf said.

Previous Post

India records more than 300 fresh COVID-19 cases

Next Post

India hits out at Pak at UNHRC session

Press Trust of india

Press Trust of india

Related Posts

Fuel, LPG supplies normal across J&K: Oil Industry

Niti Aayog working on proposal ‘to replace LPG subsidy with cooking subsidy’
May 19, 2026

Jammu/Srinagar: Himanshu Sharma on Monday said the supply position of fuel and LPG across Jammu and Kashmir remains stable and...

Read moreDetails

Thajwas Glacier lost 86% area, 88% volume since Neoglaciation: Study

Thajwas Glacier lost 86% area, 88% volume since Neoglaciation: Study
May 19, 2026

Srinagar: The Thajwas Glacier in the Kashmir Himalaya has lost nearly 86 per cent of its area and close to...

Read moreDetails

Kashmir records above normal temp as Srinagar sizzles at 31.5 C

For the third day in a row, the Earth’s average temperature remained at a record high
May 19, 2026

Srinagar: Jammu and Kashmir witnessed hot and dry weather on Monday, with several places recording above normal temperatures, while the...

Read moreDetails

LoP Sharma insists, house committee appointments lack fairness & convention

LoP Sharma raises corruption alarm in J&K
May 19, 2026

Jammu: The battle between Speaker of the Legislative Assembly Abdul Rahim Rather and Leader of Opposition Sunil Kumar Sharma intensified...

Read moreDetails

KU extends deadline for B.Tech, M.Tech admission applications till May 21

Kashmir University wins ‘GATI Achiever’ award
May 19, 2026

Srinagar: University of Kashmir has extended the last date for submission of online application forms for admission to B.Tech and...

Read moreDetails

Police attach drug peddler’s house in Anantnag

May 19, 2026

Srinagar: Police on Monday attached a residential house worth Rs 1.10 crore and belonging to an alleged drug peddler in...

Read moreDetails
Next Post
At UNHRC, Pak demands lifting of communication blockade, release of Kashmiri leaders

India hits out at Pak at UNHRC session

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.