• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, May 18, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home EDITORIAL

Tackling electric power crisis

Editor by Editor
December 5, 2022
in EDITORIAL
A A
0
Medical Mafia
FacebookTwitterWhatsapp

While Union Territory administration has been assuring people in Kashmir that this winter they should expect comfortable supply of electricity, reports reaching from rural areas are disturbing. The concerned department has already issued load-shedding programme for both metered and un-metered areas. Though in some Srinagar localities, the schedule is followed, in rural areas, even the metered areas face power cuts like the un-metered areas. While the administration at the top is convinced that there has been some improvement of power supply front but it seems they are being fed lies by the concerned authorities who are hiding their inefficiencies. Lt Governor, Manoj Sinha has been interacting with the people through a radio programme wherein people apprise him of their issues and concerns. It would be prudent that the next such programme focuses on the issue of power supply and people from cross section of the society are allowed to participate and present the actual power scenario to the LG.

It is appreciable that the UT administration has been making efforts to ensure the efficiency of power supply and has been trying to minimise Aggregate Technical and Commercial losses, it still remains the highest in the entire country. In simple terms, Jammu and Kashmir is suffering a huge gap in the energy it puts into the system and the revenue (payment) it collects for this energy.According to the data by the Ministry of Power, Government of India, the former state had 60.46 percent AT&C losses in 2019-20. The losses are highest in entire India where the average losses in this category are 22 percent.Over the years thousands of crores of rupees have been spent in overhauling the transmission and destruction infrastructure besides taking to technical up-gradation by the J&K Power Development Department. The end results are however appalling.

More News

Dual Malignancy Burden

Growers Demand Safety Net

Cyber Shield for Governance

Load More

In 2008, the then state embarked up on a Restructured Accelerated Power Development and Reforms Programme (R-APDRP) with Rs 872.36 crore aimed at strengthening and up-gradation of sub-transmission and distribution network and adoption of Information Technology.The ambitious programme targeted at reducing the losses to three percent per annum and bringing them to 15 percent within five years.In 2011, Rs 1700 crores were sanctioned for bettering the system in 30 towns and cities under the programme. “The financial support has been squandered.” Dysfunctional meters worth crores of rupees were purchased under the scheme and dumped later on that speak of corruption in purchase of other materials and supplies under the multi-crore projects.Even with a huge financial input, the revamp and modernization of the electricity distribution system is not visible. The target of 100 percent metering of domestic consumers has also not been met and there are thousands of unregistered consumers using electricity in connivance with the PDD officials as the money for infrastructure and technical up-gradation has been “flowing like water under a bridge”.

Rs 617 crores were approved by the central government in 2015-16 under Deendayal Upadhaya Gram Jyoti Yojana. The money had been granted for strengthening and augmenting the sub-transmission and distribution infrastructure in rural areas.Likewise, sub-stations were to be created at 33/11 kV, 11/.433 kV levels, besides extension of HT Lines and AB cables under the Integrated Power Development Scheme at a cost of Rs 242 crores.Rs 966 crores were also provided under the Prime Minister’s Development Plan for rural and urban areas. The money had been allocated for creation of new 33/11 kV sub-stations, augmentation of existing sub-stations, extensions of HT and LT lines and capacity at distribution level.But the ground situation is that a mesh of decayed electric wires and poles dangle over the heads everywhere in the towns and the villages and the average power supply continues to be dismal in the chilling winters.

It is high time that the UT administration looks into these issues seriously and comes up with a long term strategy to ensure that Kashmir gets sufficient power supply during winters and Jammu during summers.

Previous Post

India, Bangladesh bolstering ties through Silchar-Sylhet Festival

Next Post

‘Kashmir Files’ best cinematic expression of Kashmir pain: Chugh

Editor

Editor

Related Posts

Dual Malignancy Burden

Theme Park, a great initiative
May 18, 2026

Cancer in Kashmir is not a solitary affliction but a continuum, a relentless shadow that often returns in the form...

Read moreDetails

Growers Demand Safety Net

Theme Park, a great initiative
May 16, 2026

Kashmir’s horticulture sector, worth nearly Rs 10,000 crore annually, continues to stand exposed to the vagaries of nature without any...

Read moreDetails

Cyber Shield for Governance

Theme Park, a great initiative
May 15, 2026

The establishment of a Security Operations Centre in Jammu and Kashmir is not only a step forward but also part...

Read moreDetails

Electric Dreams, Policy Delays

Theme Park, a great initiative
May 14, 2026

Electric mobility has become a national priority, with states across India rolling out policies, incentives, and infrastructure to accelerate adoption....

Read moreDetails

Faith in Exams Shattered

Theme Park, a great initiative
May 13, 2026

The medical entrance examination, meant to be the most sacred gateway to the nation’s healing profession, now stands tainted by...

Read moreDetails

Climate Change Alters Flow

Theme Park, a great initiative
May 12, 2026

The fragile snowpack across the Himalayas this winter has once again exposed the delicate balance between climate variability and water...

Read moreDetails
Next Post
Budget 2021-22 will usher in new era of development in J&K, Ladakh: Chugh

‘Kashmir Files’ best cinematic expression of Kashmir pain: Chugh

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.