• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, September 4, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Govt failing to ensure proper power supply: Ghulam Hassan Mir 

Images News Netwok by Images News Netwok
November 25, 2022
in LOCAL
A A
0
Release data on COVID-19 inoculation in J&K: Ghulam Hassan Mir
FacebookTwitterWhatsapp

Srinagar: Apni Party Senior Vice President and former Cabinet minister Ghulam Hassan Mir on Friday said that the government is failing to ensure sufficient power supply in the Valley. 

He said that frequent power cuts are causing problems for the people.

Related posts

Sakeena Itoo, Nasir Aslam Wani take stock of flood situation in south Kashmir

Sakeena Itoo, Nasir Aslam Wani take stock of flood situation in south Kashmir

September 3, 2025
Raabita reflects continued commitment of govt to public welfare, responsive governance: Sakeena Itoo

Health Minister appeals doctors, paramedics to remain available in view of adverse weather conditions

September 3, 2025

In a statement issued here, Mir said, “The frequent power cuts in both metered and non-metered areas across the Valley has brought miseries to the people. People are frustrated to see that the power department violates even its own curtailment schedule in most of the areas here.”

Urging the LG administration to intervene in the matter to ensure sufficient power supply to the consumers in the Valley, Ghulam Hassan Mir said, “Administration must realize that people are already facing tremendous difficulties due to the harsh winter days, and the unscheduled power cuts increase their problems. The Administration must intervene to make the officials of the Kashmir Power Development Corporation Limited (KPDCL) accountable in this regard. The department should not go for the power cuts beyond a certain limit or the announced schedule.”

Previous Post

Cartoon

Next Post

‘Conversion of in-service Police personnel as ASI(S) and SGCT (M)’ – Pre-selection tests scheduled to be conducted from Nov 28

Images News Netwok

Images News Netwok

Next Post
SVO disposes of 35 cases

‘Conversion of in-service Police personnel as ASI(S) and SGCT (M)’ - Pre-selection tests scheduled to be conducted from Nov 28

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.