• About us
  • Contact us
  • Our team
  • Terms of Service
Friday, November 13, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Railways unveils overarch deck on Chenab railway bridge

Press Trust of india by Press Trust of india
August 14, 2022
in TOP NEWS
A A
0
Lower ends of arch of world’s highest railway bridge in J&K connected
FacebookTwitterWhatsapp

Jammu: The ‘golden joint’ of the Chenab railway bridge, connecting two ends of the deck of the world’s highest railway bridge, was unveiled in Reasi district on Saturday.

The bridge will prove direct connectivity to the Kashmir Valley.

More News

LG Sinha visits fire-hit markets in Jammu, announces compensation to affected shopkeepers

LG addresses national seminar on ‘Revival, Preservation and Sustainability of Kashmir’s Cultural Heritage’

CM calls for exam reforms; stresses foolproof, merit-based system

Load More

The unveiling of the overarch deck saw bursting of firecrackers and people from different parts of the country singing the national anthem and chanting ‘Bharat Mata ki Jai’ on it.

“This is a historic moment,” a senior official said, adding that the completion of the ‘golden joint’ has been a long journey.

The term ‘golden joint’ was coined by the civil engineers who worked on connecting the two ends of the deck of the bridge, he said.

Roughly, the 1.3-km bridge, which is being constructed at a cost of Rs 1,250 crore, is 98 percent complete with the completion of the ‘golden joint’, officials said.

The bridge is located 359 m above the Chenab riverbed and is 30 m higher than the Eiffel Tower in Paris, they said.

The bridge forms a crucial link in the 111-km stretch from Katra to Banihal, which is part of the Udhampur-Srinagar-Baramulla section of the Kashmir Railway project, the officials said.

For constructing the bridge, pylons were erected on either side of the river and two auxiliary self-propelled cable cranes were used to tow temporary auxiliary ropes across these pylons, according to the officials.

More than 1,300 workers and 300 engineers have been working round the clock to complete the bridge, the officials said.

The construction started in 2004 but the work was stopped in 2008-09 to consider the aspect of safety of rail passengers in view of frequent high velocity winds in the area, they said.

Once completed, the bridge will be able to withstand winds with speed up to 260 kmph and will have a lifespan of 120 years.

Previous Post

Be Contented with Your Possessions and Status

Next Post

Suspicious box turns out to be tiffin box in Bhaderwah

Press Trust of india

Press Trust of india

Related Posts

LG Sinha visits fire-hit markets in Jammu, announces compensation to affected shopkeepers

LG Sinha visits fire-hit markets in Jammu, announces compensation to affected shopkeepers
November 13, 2026

Jammu: Lieutenant Governor (LG) Manoj Sinha visited the Warehouse, Nehru Market, and Shiv Market here on Thursday evening to assess...

Read moreDetails

LG addresses national seminar on ‘Revival, Preservation and Sustainability of Kashmir’s Cultural Heritage’

LG addresses national seminar on ‘Revival, Preservation and Sustainability of Kashmir’s Cultural Heritage’
November 13, 2026

Srinagar: Lieutenant Governor Manoj Sinha Thursday said that revival of cultural institutions, heritage sites strengthen identity, self-respect and national consciousness....

Read moreDetails

CM calls for exam reforms; stresses foolproof, merit-based system

CM calls for exam reforms; stresses foolproof, merit-based system
November 13, 2026

Jammu: Chief Minister Omar Abdullah on Thursday called for comprehensive reforms in the examination system in the Union Territory, stressing...

Read moreDetails

Bullet-riddled bodies of 2 missing SPOs recovered in Kishtwar

   Two killings/deaths in J&K, people want answers
November 13, 2026

Jammu/Srinagar: Bullet-riddled bodies of two Special Police Officers (SPOs), who went missing while on duty in the remote Dachhan-Marwah area...

Read moreDetails

CM seeks permanent halt for Vande Bharat at Anantnag railway station

Omar Abdullah invites GCC firms to invest in J&K, create jobs for local youth
November 13, 2026

Jammu: Chief Minister Omar Abdullah has written to Union Railway Minister Ashwini Vaishnaw, requesting that the experimental halt of the...

Read moreDetails

Public representatives, delegations, students call on CM at Civil Secretariat

Public representatives, delegations, students call on CM at Civil Secretariat
November 13, 2026

Jammu: Several delegations, public representatives and school students today called on Chief Minister Omar Abdullah at the Civil Secretariat here...

Read moreDetails
Next Post
44 killed in Peru bus accident

Suspicious box turns out to be tiffin box in Bhaderwah

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.