• About us
  • Contact us
  • Our team
  • Terms of Service
Thursday, August 21, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Railways unveils overarch deck on Chenab railway bridge

Press Trust of india by Press Trust of india
August 14, 2022
in TOP NEWS
A A
0
Lower ends of arch of world’s highest railway bridge in J&K connected
FacebookTwitterWhatsapp

Jammu: The ‘golden joint’ of the Chenab railway bridge, connecting two ends of the deck of the world’s highest railway bridge, was unveiled in Reasi district on Saturday.

The bridge will prove direct connectivity to the Kashmir Valley.

Related posts

Uproar in LS as Shah moves Bills for removal of PM, CMs, ministers arrested on criminal charges

Uproar in LS as Shah moves Bills for removal of PM, CMs, ministers arrested on criminal charges

August 21, 2025
Premier educational institutions set up in J&K in past 10 years: LG Sinha

LG asks educational institutions to invest in human capital, innovation, research

August 21, 2025

The unveiling of the overarch deck saw bursting of firecrackers and people from different parts of the country singing the national anthem and chanting ‘Bharat Mata ki Jai’ on it.

“This is a historic moment,” a senior official said, adding that the completion of the ‘golden joint’ has been a long journey.

The term ‘golden joint’ was coined by the civil engineers who worked on connecting the two ends of the deck of the bridge, he said.

Roughly, the 1.3-km bridge, which is being constructed at a cost of Rs 1,250 crore, is 98 percent complete with the completion of the ‘golden joint’, officials said.

The bridge is located 359 m above the Chenab riverbed and is 30 m higher than the Eiffel Tower in Paris, they said.

The bridge forms a crucial link in the 111-km stretch from Katra to Banihal, which is part of the Udhampur-Srinagar-Baramulla section of the Kashmir Railway project, the officials said.

For constructing the bridge, pylons were erected on either side of the river and two auxiliary self-propelled cable cranes were used to tow temporary auxiliary ropes across these pylons, according to the officials.

More than 1,300 workers and 300 engineers have been working round the clock to complete the bridge, the officials said.

The construction started in 2004 but the work was stopped in 2008-09 to consider the aspect of safety of rail passengers in view of frequent high velocity winds in the area, they said.

Once completed, the bridge will be able to withstand winds with speed up to 260 kmph and will have a lifespan of 120 years.

Previous Post

Be Contented with Your Possessions and Status

Next Post

Suspicious box turns out to be tiffin box in Bhaderwah

Press Trust of india

Press Trust of india

Next Post
44 killed in Peru bus accident

Suspicious box turns out to be tiffin box in Bhaderwah

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.