• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, September 8, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Over 100 trapped civilians rescued by Army in Kishtwar

Press Trust of india by Press Trust of india
May 15, 2022
in TOP NEWS
A A
0
Indian Army extends assistance to stranded civilians
FacebookTwitterWhatsapp

Jammu: The Army on Saturday said over 100 civilians trapped in a remote village due to the washing away of a footbridge were rescued while work is in progress to construct a new bridge to enable regular movement across the river.

The wooden bridge over a river at Chisoti village in Machail area was washed away due to a sudden increase in the flow of water on Thursday evening, leaving over 100 people trapped on the other side, a defence spokesman said in a statement here.

Related posts

After Jammu, MHA team arrives in Kashmir to assess flood damage

After Jammu, MHA team arrives in Kashmir to assess flood damage

September 8, 2025
India emerging as force to reckon with, Op Sindoor made it clear: LG Sinha

LG calls for using nanotechnology for landslide, flash flood warning in Himalayan region

September 8, 2025

He said the Army responded swiftly when approached by the civil administration.

“Necessary items and support was provided for preparation of the bridge at night. Early in the morning, the commanding officer along with his team reached Chisoti and assessed the situation along with engineers from civil administration,” the spokesperson said.

After carrying out inspection of the area, the Army built an adhoc bridge using fallen trees and wooden planks and anchored it using ropes, the spokesperson said.

“Work on the construction of a permanent bridge is in progress at full pace to enable regular movement across the river,” the spokesperson said.

Previous Post

Political parties in J&K stage protests over killings in Valley

Next Post

Ladakh reports three Covid cases

Press Trust of india

Press Trust of india

Next Post
20 fresh positive COVID-19 cases in Ladakh

Ladakh reports three Covid cases

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.