• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, June 7, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

‘Northern Railways makes breakthrough in ambitious Kashmir project’

Press Trust of india by Press Trust of india
February 16, 2022
in TOP NEWS
A A
0
PDP People’s Conference spar on social media over Centre’s decision to extend rail link
FacebookTwitterWhatsapp

Banihal/Jammu: The Northern Railways has achieved a line and level breakthrough of the longest 12.758 km tunnel between Sumber and Arpinchala station on the Katra-Banihal section under the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, an official said on Tuesday.

The breakthrough was achieved on the T-49 tunnel, which is going to be the longest tunnel of the Indian Railways surpassing the 11.2 km-long Pir Panjal tunnel constructed by USBRL on the Banihal-Qazigund section.

More News

No safe haven for cross-border smugglers, peddlers or terror financiers in J&K: LG

J&K govt files review petition before SC on conduct of TET: Edu minister Itoo

NC slams ‘unelected’ Mehbooba Mufti for visiting AIIMS to ‘review’ construction

Load More

“The South portal of tunnel T-49 is located in the picturesque Sumber village at a distance of 45 km from district headquarters Ramban at an altitude of 1,200 metres, while the North portal is located near Arpinchala village in Khari Tehsil at an altitude of 1,600 metres,” he said.

He said the T-49 tunnel has two tubes — one is the main tunnel and the other is the escape tunnel. It has been constructed using a modern drill and blast technique called the New Austrian Tunnelling Method.

He said the cross-section profile of the tunnel is modified to give it a horseshoe shape.

“In order to facilitate construction of the longest tunnel, three adits — UrnihalAdit, HingniAdit and Kundan Adit — have also been constructed. The tunnel has a ruling gradient 1 in 80 and a designed speed of 100 Kmph,” the official said.

An adit is a horizontal or near-horizontal passageway to a larger underground excavation for the purposes of ventilation, water removal, or auxiliary entrance.

As per the international standards, he said, the escape tunnel constructed parallel to the main tunnel is connected by cross passages at an interval of 375 metres to facilitate rescue and restoration work.

“The work of construction was entrusted by Northern Railways to M/s IRCON International limited which has assigned works in two packages to M/S HCC and M/s AFCONS,” the official said.

The HCC is executing the work on the 5.1 km stretch length from the south portal and AFCONS is executing the work on the 7.658 km stretch from the north portal.

“Several challenges were encountered in the course of construction such as shear zone, perched aquifer, and highly jointed rock mass, rock problems of squeezing and high ingress of water,” the official said.

“During construction activities of the tunnel, the local population was employed by agencies for various works, which has changed the overall socio-economic landscape,” he mentioned.

Of the proposed 272-km-long USBRL project, 161 km has already been commissioned and operationalised in phases, with the first phase of the 118-km Qazigund-Baramulla section commissioned in October 2009, followed by 18 km Banihal-Qazigund in June 2013 and 25 km Udhampur-Katra in July 2014.

The work on the intervening stretch of 111 km between Katra and Banihal is under progress, the official said, adding the Katra-Banihal section is traversing through the hilly terrain of the lower Himalayas, where geology is a major challenge.

It has several major bridges. Long tunnels are under different stages of construction, the official said.

Previous Post

India snubs OIC for commenting on dress code row

Next Post

Himayat scheme fails to live up to the promises and hopes it was launched with

Press Trust of india

Press Trust of india

Related Posts

No safe haven for cross-border smugglers, peddlers or terror financiers in J&K: LG

No safe haven for cross-border smugglers, peddlers or terror financiers in J&K: LG
June 7, 2026

Jammu: Lieutenant Governor Manoj Sinha on Saturday led a ‘padyatra’ (march) in Kishtwar as the ongoing drug-free J&K campaign reached...

Read moreDetails

J&K govt files review petition before SC on conduct of TET: Edu minister Itoo

Sakeena Itoo reviews performance, functioning of J&K Medical Supplies Corporation Limited
June 7, 2026

Srinagar: The Jammu and Kashmir government has filed a review petition before the Supreme Court on the conduct of the...

Read moreDetails

NC slams ‘unelected’ Mehbooba Mufti for visiting AIIMS to ‘review’ construction

Want elected govt to handle law & order: MLA Tanvir Sadiq
June 7, 2026

Srinagar: The ruling National Conference (NC) on Saturday termed as "unfortunate" the visit of former chief minister Mehbooba Mufti to...

Read moreDetails

HC cancels bail of rape accused, orders him to surrender

PM Modi inaugurating incomplete projects for votes: JKPCC
June 7, 2026

Srinagar: The High Court of J&K and Ladakh has cancelled the bail granted to a rape accused man from Sumbal,...

Read moreDetails

UNSC membership huge responsibility, not forum for peddling biased, false narratives: India slams Pak

Pakistan violated spirit of IWT by inflicting three wars, thousands of terror attacks on India: India tells UN
June 7, 2026

United Nations:  India has slammed Pakistan for its "unwarranted reference" to Jammu and Kashmir at the UN, telling the current...

Read moreDetails

Health sector reforms: CS calls for expansion of trauma, emergency, critical-care services

Chief Secy reviews Mission YUVA progress across J&K districts
June 7, 2026

Srinagar: Chief Secretary, Atal Dulloo, today chaired a comprehensive review meeting to assess the progress achieved under the Health Sector...

Read moreDetails
Next Post
Himayat scheme fails to live up to the promises and hopes it was launched with

Himayat scheme fails to live up to the promises and hopes it was launched with

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.