• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, March 24, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Smart Metering project: ‘15,000 meters being installed per month’

Images News Netwok by Images News Netwok
October 27, 2021
in LOCAL
A A
0
Smart Metering project: ‘15,000 meters being installed per month’
FacebookTwitterWhatsapp

Jammu: Principal Secretary Power Development Department, Rohit Kansal, said that the Power Development Department is all set to achieve the highest ever capacity addition in both the distribution and transmission sectors in the UT this year.

“A total of 1420 MVA at 132 kV level and 1595 MVA at 220 kV level in the transmission sectors was set to be added this financial year. In the distribution sector, over 100 substations were to be completed this year under various schemes adding over 500 MVA capacity to the system,” this was revealed at a meeting chaired by to review the progress of various ongoing schemes in the UT.

More News

LG Sinha presented books, meets delegations in Jammu

Div Com inaugurates Gyan Bharatam workshop, manuscript survey in Srinagar

Sat Sharma highlights J&K’s Religious Border Tourism potential in Rajya Sabha

Load More

The meeting was attended by Executive Director and CEO REC PDCL, R Lakshamanan, Executive Director Power Grid Kailash Rathore and other senior officers from Central PSUs besides Managing Directors and Chief Engineers of Transmission and Distribution Corporations of J&K.

‘Our collective objective should be to ensure 24×7 power supply to all the consumers of Jammu and Kashmir in the coming three years’, the Principal Secretary stated while addressing the officers of all Power Corporations and CPSUs.

Outlining in detail the vision of the department to provide uninterrupted quality power supply to entire Jammu & Kashmir by the year 2025, Rohit Kansal said adding that to achieve this, we need to have a vision and a detailed plan for the coming three years. For this he stressed on the need for a detailed system study along with random simulations, IT interventions including unification of billing softwares, energy accounting and 100 % metering and increasing billing and collection efficiencies through innovative solutions.

During the discussions, he stressed on system strengthening, financial stability of Corporations, resolving issues hampering the pace of projects, systematic improvements and augmentation of projects etc.

The Principal Secretary was apprised that the Smart Metering project in J&K has taken off well and nearly 15,000 meters are now being installed per month. The Principal Secretary directed that the pace of installation be accelerated so that the target of installation of 2 lakh smart meters by 2022 and 8 lakh meters by 2023 could be met well in time. He also asked the executing agencies to aim at achieving feeder-wise saturation while installing smart meters. He also directed that the DISCOMS should install 100% DT meters also so that energy accounting could be accurately carried out as a first step towards eliminating losses.

The Revamped Distribution Sector Scheme (RDSS) was also discussed in detail at the meeting. The Principal Secretary thanked the Ministry of Power for the generously funded scheme where 90% of the funds for strengthening the distribution system would be available as a grant to J&K. He urged the DISCOMS to take advantage of this grant and carry out detailed studies to identify bottlenecks in the system. “We have to address key issues which are at the root of seasonal power woes in Jammu and Kashmir regions,” he said and pressed on the need for survey of existing as well as new schemes to decide on the areas and sectors which need to be addressed at once. He advised RECPDCL to do a feeder wise energy accounting on behalf of the distribution companies. He also asked them to do a detailed system study and suggest the need for new additions as well as improvement and maintenance of existing networks. He also called for suggesting measures to reduce high HT/LT ratio.

The Principal Secretary maintained that all the measures being taken by the government are aimed at eliminating power losses and removing bottlenecks to uninterrupted and efficient power distribution in the region. Rohit Kansal called for unification of various automatic metering and billing systems in use and their unification for seamless transition to more efficient billing methodology.

Previous Post

Dr Farooq asks GOI to come to rescue of horticulture sector

Next Post

CS reviews implementation of EoDB reforms in J&K

Images News Netwok

Images News Netwok

Related Posts

LG Sinha presented books, meets delegations in Jammu

LG Sinha presented books, meets delegations in Jammu
March 23, 2026

JAMMU: Lieutenant Governor Manoj Sinha was today presented with a book authored by Brig. Dr Vijay Sagar Dheman (Retd.) titled...

Read moreDetails

Div Com inaugurates Gyan Bharatam workshop, manuscript survey in Srinagar

Div Com inaugurates Gyan Bharatam workshop, manuscript survey in Srinagar
March 23, 2026

Srinagar: Divisional Commissioner Kashmir Anshul Garg on Sunday inaugurated a three-day Gyan Bharatam Workshop and National Survey of Manuscripts at...

Read moreDetails

Sat Sharma highlights J&K’s Religious Border Tourism potential in Rajya Sabha

Sat Sharma raises sports infrastructure issues in Parliament
March 23, 2026

New Delhi: J&K BJP President and MP (Rajya Sabha), Sat Sharma, highlighted the immense potential of religious and border tourism...

Read moreDetails

Power supply to several Sgr areas to remain affected on March 25

‘J&K leading the charge in electricity sector reforms’
March 23, 2026

Srinagar: The Chief Engineer, Distribution, KPDCL, has informed that a shutdown of the 33 kV Bemina–Fateh Kadal line and the...

Read moreDetails

Nothing left in matter: SC disposes of wife’s plea challenging Sonam Wangchuk’s detention

March 23, 2026

New Delhi:  The Supreme Court on Monday disposed of a plea filed by Gitanjali J Angmo, wife of climate activist...

Read moreDetails

PDP MLA Waheed Para moves private member bill in Assembly seeking new divisions, districts

March 23, 2026

Jammu:  PDP MLA Waheed Para has moved a private member bill in the Jammu and Kashmir Assembly seeking a statutory...

Read moreDetails
Next Post
CS reviews implementation of EoDB reforms in J&K

CS reviews implementation of EoDB reforms in J&K

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.