• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, September 1, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

‘213 km road macadamised by R&B dept in Sgr in last 40 days’

Images News Netwok by Images News Netwok
July 11, 2021
in CITY & TOWNS
A A
0
No containment zone to be de-notified till satisfactory vaccination: DC Srinagar
FacebookTwitterWhatsapp

Srinagar: In order to ensure smooth vehicular movement and passage of pedestrians, a road length of 213 kms has been blacktopped/macadamized during the last 40 days by the R&B department in Srinagar district.

In this regard, Deputy Commissioner Srinagar Mohammad Aijaz Asad said that Lieutenant Governor Administration has given focused attention towards extensive road connectivity, besides their upgradation, maintenance and repairs .

Related posts

Mann ki Baat resumed, PM congratulates ECI and everyone associated with the 2024 election

PM dials Odisha’s gold medal-winning canoeist, praises her performance in Srinagar event

August 31, 2025
Rana reviews water supply restoration measures in Jammu

Rana reviews water supply restoration measures in Jammu

August 31, 2025

The DC said a better road network is pivotal for overall development and all possible measures are being taken in this regard.

Giving details, the Superintendent Engineer R&B Circle  Srinagar/Budgam said that against the set target of macadamizing road length of 171 kilometers under 61 works about 142 km road length has been macadamized so far  and remaining work will be completed within next one month.

Similarly, the Superintendent Engineer(R&B) Circular Road Project informed that a road length of 71 kms have been blacktopped during the same period against the target of 85 kms. He said work is going at full pace and the remaining 14 km of road will be macadamized over the next couple of days. This excludes the Road network to be maintained by SMC.

Pertinent to mention that except main arterial roads all other roads in lanes/sub lanes were transferred to Srinagar Municipal Corporation a few months ago.

Previous Post

NC remembers Madre Meharban on her 21st death anniversary

Next Post

Police claims to solve theft cases in Budgam, Bandipora

Images News Netwok

Images News Netwok

Next Post
Srinagar police solves theft case

Police claims to solve theft cases in Budgam, Bandipora

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.