• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, July 14, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

MD KPDCL reviews progress of works, functioning of divisions

Images News Netwok by Images News Netwok
April 25, 2021
in LOCAL
A A
0
MD KPDCL reviews progress of works, functioning of divisions
FacebookTwitterWhatsapp

SRINAGAR: The Managing Director (MD) Kashmir Power Distribution Corporation Limited (KPDCL), Dr Basharat Qayoom, today conducted a day-long tour of various sites and divisions to review their functioning.

The MD visited Central workshop Division Pampore, Electric Central Store Division Pampore and under construction receiving station located at Shar Pulwama.

Related posts

CS visits Baltal Base Camp to assess SANJY 2025 arrangements

CS visits Baltal Base Camp to assess SANJY 2025 arrangements

July 13, 2025
LMD fines flour, oil mills for violation of norms

Erring FBOs fined Rs 35000 by Food Safety Department

July 13, 2025

During the visit to Electric Workshop Division Pampore, the Executive Engineer apprised the MD about the frequency of damaged transformers received in the division on a daily basis and the position of Buffer Stock available.

The MD asked the concerned Executive Engineer to utilise the entire available manpower to repair the transformers in the shortest possible time. He directed the Ex. Engineer to maintain sufficient buffer stock including Power transformers so that the same becomes ready for use in case of any urgent situation.

He further stressed upon strengthening the Central workshop Division so that dependence on SSI units becomes negligible.

He also visited Electric Central Store Division Pampore and took stock of the material present including ST Poles, PCC Poles, ACSR Conductor, Transformer Oil, Transformers and other allied material.

Later, the MD visited Receiving Station Shar and reviewed the progress of work that started February last year.

The concerned Executive Engineer STD Pulwama informed the MD about the progress made till now in the construction of 6.3 MVA Receiving station and the timeline for its completion.

The MD stressed upon the Concerned Ex. Engineer to speed up the work so that the Receiving station is commissioned by August 2021.

Meanwhile, the MD KPDCL during the visit was accompanied by Superintending Engineer Circle Ist and other officials of KPDCL.

Previous Post

Div com Jmu inspects Covid control room, oxygen generation plant at DH Samba

Next Post

Secy TAD holds deliberations on establishment of Model Residential Schools in tribal areas

Images News Netwok

Images News Netwok

Next Post
DM Srinagar directs schools for strict adherence to bus safety rules

Secy TAD holds deliberations on establishment of Model Residential Schools in tribal areas

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.