• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, July 16, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

DC Srinagar reviews snow clearance, response system

Images News Netwok by Images News Netwok
January 5, 2021
in LOCAL
A A
0
DC Srinagar reviews snow clearance, response system
FacebookTwitterWhatsapp

SRINAGAR: Deputy Commissioner Srinagar, Shahid Choudhary along with Chief Engineer, Mechanical Engineering Department, Abdul Rashid Dar monitored the progress of snow clearance and visited the central control room and workshop to assess response system for snow clearance in the district.

The machinery and equipment deployed more than 1250KM main roads in District Srinagar includes 30 snow ploughs, 13 Snow cats, 23 truck mounted machines, 6 tippers/dumpers and a fleet of smaller vehicles. The MED is entrusted with snow clearance from all main roads in the district. The Deptt also deputed two Hydraulic/LRV cranes for recovering any damaged machines during the operation.

Related posts

Rana reviews functioning of JKFDC

Rana reviews functioning of JKFDC

July 15, 2025
Javid Dar inaugurates ‘Waste to Wealth’ Exhibition at Baltal

Javid Dar inaugurates ‘Waste to Wealth’ Exhibition at Baltal

July 15, 2025

The DC sanctioned Rs 15 Lakh for better facilities , heating and food arrangements as well as protective equipment for staff deployed at central control room and round the clock duty of snow clearance as per roster. He also visited the workshop of the department, control room and staff accommodation to assess the facilities. The district administration is augmenting the resources for effective support to field staff for snow clearance and ensuring better facilities.

He appreciated the engineers, staff and field workers of MED for their exemplary response system and putting in best efforts for timely and effective snow clearance.

Chief Engineer MED Abdul Rashid Dar informed that Pre-positioning of machines at vital locations and early start of operations helped in timely clearance of snow from all areas. He also have the details of staff deployed and further requirements for effective operations.

Meanwhile, PMGSY machinery was deployed in snow clearance from respective rural roads. The PMGSY work plan is restricted to departmental roads while all PWD roads are being cleared through MED.

Earlier, the DC reviewed the snow clearance response system with Superintending Engineers and Executive Engineers of PWD and PMGSY. ADC Syed Hanief Balkhi and Jt Director Planning Mohammad Yaseen Lone were also present.

Pertinently, the lanes and by lanes are cleared of snow by Srinagar Municipal Corporation in the city area , covering around 900KM cumulative length of lanes/by lanes while MED is entrusted with all major roads.

Previous Post

Navin chairs 7th BoD meeting of JCCB

Next Post

Advisor Baseer Khan asks tourism officials to tap tourist potential along IB

Images News Netwok

Images News Netwok

Next Post
Advisor Baseer Khan asks tourism officials to tap tourist potential along IB

Advisor Baseer Khan asks tourism officials to tap tourist potential along IB

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.