• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, September 7, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Progress on Baramulla-Gulmarg National Highway upgradation work reviewed

KI News by KI News
October 25, 2020
in LOCAL
A A
0
Progress on Baramulla-Gulmarg National Highway upgradation work reviewed
FacebookTwitterWhatsapp

BARAMULLA: With an aim to upgrade basic infrastructure for developing tourism sector in the district, a meeting of concerned was convened here to review the progress on the strengthening and upgradation work on Baramulla-Gulmarg National Highway via Babareshi road.

On the occasion, Executive Director NHIDCL gave a detailed power point presentation during which he highlighted various issues and bottlenecks hampering the smooth execution of the work.

Related posts

LG assures of thorough inquiry into Chattisinghpora massacre

LG assures of thorough inquiry into Chattisinghpora massacre

September 6, 2025
Torrential rains create flood scare across J&K

Hindu family shelters Muslim neighbours after floods in Kathua

September 6, 2025

He informed that the road having a length of 42.80 km, is being upgraded at an estimated cost of Rs 84.62 cr. He further added that the road was declared as National Highway 701A in 2018 by the Union Ministry of Road Transport and Highways.

The Deputy Commissioner (DC) Baramulla, Dr G N Itoo took a detailed account of all the aspects and said that the roads play a vital role in developing tourism as it connects Baramulla with the famous tourist destination, Gulmarg.

He directed the concerned agencies to ramp up the pace of work so that it is completed well within the stipulated timeframe.

He also stressed the concerned to work in coordination and cohesion besides directed to sort out all bottle necks in a time bound manner. Moreover, he assured that all the bottlenecks shall be resolved in a time bound manner so that the execution work is not affected in any way.

Among others, the meeting was attended by Executive Director National Highway Infrastructural Development Corporation limited (NHICDL), Additional Deputy Commissioner Baramulla, SE R&B, DFO Tangmarg, Tehsildars and heads of various engineering departments.

Previous Post

Uphill task for EC to enforce COVID-19 guidelines despite requisite powers, feel former CECs

Next Post

LG meets J&K NEET topper Avikshit Gupta, 4 others

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Next Post
LG meets J&K NEET topper Avikshit Gupta, 4 others

LG meets J&K NEET topper Avikshit Gupta, 4 others

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.