• About us
  • Contact us
  • Our team
  • Terms of Service
Wednesday, June 10, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Looking to get Zojila tunnel completed without cost escalation; project may undergo design changes: Gadkari

Press Trust of india by Press Trust of india
February 17, 2020
in BUSINESS
A A
0
My departments gave employment to 1 crore youths: Gadkari
FacebookTwitterWhatsapp

New Delhi, Feb 16:  The strategic Zojila tunnel for all-year connectivity between Leh and Srinagar may undergo some design changes to prevent cost escalation as the government plans to complete the project at the earlier estimated cost of about Rs 6,800 crore, Union minister Nitin Gadkari said.

The tunnel project, stalled for about six years, holds strategic significance as Zojila Pass is situated at an altitude of 11,578 feet on the Srinagar-Kargil-Leh National highway and remains closed during winters due to heavy snowfall, cutting off Ladakh region from Kashmir.

More News

Centre announces Rs 95,692 crore interim allocation under VB-G RAM G

India eyes more FDI, speed up divestment, asset monetisation as economy faces external risks

Govt cuts subsidised LPG cylinders to Ujjwala beneficiaries to 4

Load More

“We are planning to make some design changes that may include doing away with escape tunnel and instead (have) alternative tunnels to cross from one side to the other as it will be my endeavour to prevent cost escalation and build it at the previous estimated cost of Rs 6,800 crore,” Road Transport and Highways Minister Gadkari told PTI.

Though the revised project cost estimate of a little over Rs 8,000 crore has been sent to the Cabinet, “we are deliberating on minor design changes to prevent cost escalation,” the minister said.

“Besides the escape tunnel, we can do away with vertical shafts not compromising with safety,” he said, adding that rebidding for the project was expected in a month or two.

Prime Minister Narendra Modi had in May 2018 laid the foundation stone for the Rs 6,800 crore project, billed as the Asia’s longest bi-directional tunnel, in Jammu and Kashmir.

However, barely months after the foundation, the National Highways and Infrastructure Development Corporation Ltd (NHIDCL) on January 15, 2019 terminated the contract awarded to troubled IL&FS group company IL&FS Transportation after it abandoned the project citing financial problems.

“The project which was earlier constructed on hybrid annuity mode will now be converted into EPC (engineering, procurement and construction) mode,” Gadkari said.

The cancellation of the award in January last year was the second time NHIDCL had scrapped the contract for the 14.15-km tunnel project which would cut down the 3.5-hour long drive through the mountainous Zojila Pass to just 15 minutes.

The corporation had earlier cancelled the bid of IRB Infrastructure. IL&FS Transportation in 2017 emerged as the lowest bidder in the rebidding process.

Unveiling a plaque for commencement of work for the tunnel, Modi had said, “Zojila tunnel is not a mere tunnel but a modern day marvel.”

The Cabinet on January 3, 2018 had approved the Zojila tunnel project with Parallel Escape (Egress) tunnel between Baltal and Minamarg on the Srinagar-Leh section of NH-1A at a total cost of Rs 6,800 crore.

The project was expected to be completed in seven years.

On March 1, 2016, the Ministry of Road Transport and Highways had ordered “re-bidding” for the project, which had been awarded to IRB Infrastructure.

The decision was taken at a high-level meeting, chaired by Gadkari, after Congress leader Digvijay Singh had alleged that guidelines were violated while awarding the contract.

The original plans of the tunnel included fully transverse ventilation system, uninterrupted power supply (UPS), tunnel emergency lighting, CCTV monitoring, variable message signs (VMS), traffic logging equipment, overheight vehicle detection and tunnel radio system.

Besides, it included pedestrian cross passages at every 250 metres and motorable cross passages and lay-bys at every 750 metres, as well as emergency telephones and fire-fighting cabinets at every 125 metres.

Previous Post

World Snow Shoe Championship-2020 Japan: Kashmir athletes create history, bag 3 medals

Next Post

CB files charge-sheet against father-son duo in fake job racket

Press Trust of india

Press Trust of india

Related Posts

Centre announces Rs 95,692 crore interim allocation under VB-G RAM G

Centre to set up Clean Plant facility to provide disease-resistant plants to horticulturists in Kashmir
June 10, 2026

New Delhi: The Centre on Tuesday announced an interim allocation of Rs 95,692 crore under the newly introduced VB-G RAM...

Read moreDetails

India eyes more FDI, speed up divestment, asset monetisation as economy faces external risks

J&K economy likely to grow at 5.82 pc in 2025-26: Economic Survey
June 10, 2026

New Delhi:  The government plans to push ahead with reforms, including further measures to boost foreign investment, speeding up divestment...

Read moreDetails

Govt cuts subsidised LPG cylinders to Ujjwala beneficiaries to 4

Niti Aayog working on proposal ‘to replace LPG subsidy with cooking subsidy’
June 8, 2026

New Delhi:  The government has reduced the number of subsidised cooking gas cylinders available annually to beneficiaries of its flagship...

Read moreDetails

Eight workers killed in Vizag Steel Plant as molten iron spills

   Two killings/deaths in J&K, people want answers
June 8, 2026

Visakhapatnam: At least eight workers of the Rashtriya Ispat Nigam Ltd (Vizag Steel Plant) were killed and six others injured...

Read moreDetails

LPG Price Hike: Govt says rates in India among world’s lowest despite 46% jump in global benchmark

Niti Aayog working on proposal ‘to replace LPG subsidy with cooking subsidy’
June 7, 2026

New Delhi: Indian households continue to pay among the lowest prices for cooking gas globally despite a sharp rise in...

Read moreDetails

Why aren’t BJP leaders taking to streets with cylinders in protest now: Cong’s dig on LPG price hike

Will ask PAC to call AG, CAG to know when was CAG report on Rafale tabled in Parl: Kharge
June 7, 2026

New Delhi:  The Congress on Sunday launched a scathing attack on the Modi government over domestic LPG price hike, asking...

Read moreDetails
Next Post
Crime Branch registers case against Sachdeva Metal Works

CB files charge-sheet against father-son duo in fake job racket

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.