• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, December 23, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Looking to get Zojila tunnel completed without cost escalation; project may undergo design changes: Gadkari

Press Trust of india by Press Trust of india
February 17, 2020
in BUSINESS
A A
0
My departments gave employment to 1 crore youths: Gadkari
FacebookTwitterWhatsapp

New Delhi, Feb 16:  The strategic Zojila tunnel for all-year connectivity between Leh and Srinagar may undergo some design changes to prevent cost escalation as the government plans to complete the project at the earlier estimated cost of about Rs 6,800 crore, Union minister Nitin Gadkari said.

The tunnel project, stalled for about six years, holds strategic significance as Zojila Pass is situated at an altitude of 11,578 feet on the Srinagar-Kargil-Leh National highway and remains closed during winters due to heavy snowfall, cutting off Ladakh region from Kashmir.

More News

India, New Zealand conclude FTA talks; pact to offer duty-free access, USD 20 bn FDI

Vaishnaw should resign over Railways deterioration: Congress after train fare hikes

Gold jumps to record high of Rs 1.38 lakh/10g, silver hits new peak of Rs 2,14,500 per kg

Load More

“We are planning to make some design changes that may include doing away with escape tunnel and instead (have) alternative tunnels to cross from one side to the other as it will be my endeavour to prevent cost escalation and build it at the previous estimated cost of Rs 6,800 crore,” Road Transport and Highways Minister Gadkari told PTI.

Though the revised project cost estimate of a little over Rs 8,000 crore has been sent to the Cabinet, “we are deliberating on minor design changes to prevent cost escalation,” the minister said.

“Besides the escape tunnel, we can do away with vertical shafts not compromising with safety,” he said, adding that rebidding for the project was expected in a month or two.

Prime Minister Narendra Modi had in May 2018 laid the foundation stone for the Rs 6,800 crore project, billed as the Asia’s longest bi-directional tunnel, in Jammu and Kashmir.

However, barely months after the foundation, the National Highways and Infrastructure Development Corporation Ltd (NHIDCL) on January 15, 2019 terminated the contract awarded to troubled IL&FS group company IL&FS Transportation after it abandoned the project citing financial problems.

“The project which was earlier constructed on hybrid annuity mode will now be converted into EPC (engineering, procurement and construction) mode,” Gadkari said.

The cancellation of the award in January last year was the second time NHIDCL had scrapped the contract for the 14.15-km tunnel project which would cut down the 3.5-hour long drive through the mountainous Zojila Pass to just 15 minutes.

The corporation had earlier cancelled the bid of IRB Infrastructure. IL&FS Transportation in 2017 emerged as the lowest bidder in the rebidding process.

Unveiling a plaque for commencement of work for the tunnel, Modi had said, “Zojila tunnel is not a mere tunnel but a modern day marvel.”

The Cabinet on January 3, 2018 had approved the Zojila tunnel project with Parallel Escape (Egress) tunnel between Baltal and Minamarg on the Srinagar-Leh section of NH-1A at a total cost of Rs 6,800 crore.

The project was expected to be completed in seven years.

On March 1, 2016, the Ministry of Road Transport and Highways had ordered “re-bidding” for the project, which had been awarded to IRB Infrastructure.

The decision was taken at a high-level meeting, chaired by Gadkari, after Congress leader Digvijay Singh had alleged that guidelines were violated while awarding the contract.

The original plans of the tunnel included fully transverse ventilation system, uninterrupted power supply (UPS), tunnel emergency lighting, CCTV monitoring, variable message signs (VMS), traffic logging equipment, overheight vehicle detection and tunnel radio system.

Besides, it included pedestrian cross passages at every 250 metres and motorable cross passages and lay-bys at every 750 metres, as well as emergency telephones and fire-fighting cabinets at every 125 metres.

Previous Post

World Snow Shoe Championship-2020 Japan: Kashmir athletes create history, bag 3 medals

Next Post

CB files charge-sheet against father-son duo in fake job racket

Press Trust of india

Press Trust of india

Related Posts

India, New Zealand conclude FTA talks; pact to offer duty-free access, USD 20 bn FDI

India, New Zealand conclude FTA talks; pact to offer duty-free access, USD 20 bn FDI
by Press Trust of india
December 22, 2025

New Delhi:  India and New Zealand on Monday announced the conclusion of talks for a free trade agreement that will...

Read moreDetails

Vaishnaw should resign over Railways deterioration: Congress after train fare hikes

Govt bringing laws, taking steps to make social media platforms accountable: IT Min
by Press Trust of india
December 22, 2025

New Delhi:  The Congress on Monday demanded the resignation of Railway Minister Ashwini Vaishnaw, claiming that under him, the condition...

Read moreDetails

Gold jumps to record high of Rs 1.38 lakh/10g, silver hits new peak of Rs 2,14,500 per kg

by Press Trust of india
December 22, 2025

New Delhi:  Gold prices rose to a fresh lifetime high of Rs 1,38,200 per 10 grams, gaining Rs 1,685, in...

Read moreDetails

PM unveils Rs 10,601-cr fertiliser plant in Assam, unit to be commissioned by 2030

Take part in ‘Your Money, Your Right’ movement: PM Modi
by Press Trust of india
December 21, 2025

Namrup: Prime Minister Narendra Modi on Sunday laid the foundation stone of a Rs 10,601-crore brownfield ammonia-urea plant in Dibrugarh...

Read moreDetails

Rs 2 cr siphoned off from India’s Permanent Mission in Geneva; CBI books accounts officer

CBI questions PNB’s ED for second day
by Press Trust of india
December 21, 2025

New Delhi: The CBI has launched a probe into the swindling of more than 2 lakh Swiss francs (around Rs...

Read moreDetails

Centre rejects mining push charge behind Aravalli definition

by Press Trust of india
December 21, 2025

New Delhi:  The Centre on Sunday rejected reports that the definition of the Aravalli hills had been changed to allow...

Read moreDetails
Next Post
Crime Branch registers case against Sachdeva Metal Works

CB files charge-sheet against father-son duo in fake job racket

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.