• TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
Saturday, July 5, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

Div Com reviews status of work on various projects in power sector

Images News Netwok by Images News Netwok
May 14, 2019
in LOCAL
A A
0
Div Com for strict action against profiteers, black marketers
FacebookTwitterWhatsapp

SRINAGAR, MAY 13: Divisional Commissioner Kashmir Baseer Ahmad Khan today convened a meeting with all Chief Engineers (CE) of Power Development Department (PDD) to review the status of work on various projects in the sector across the valley.

The meeting discussed the progress of various projects under execution in different parts of the valley which include  Grid Station at Bandipora, erection of transmission towers and laying of transmission lines from Ganderbal to Bandipora, Lassipora Grid Station at Pulwama, Grid Station at Ahmadpora (Magam), Chrar-i-Sharief Grid Station and works on Alesteng Grid Station.

Related posts

Union Agriculture Secretary visits agricultural institutions, facilities in Kashmir

Union Agriculture Secretary visits agricultural institutions, facilities in Kashmir

July 4, 2025
CS aligns hydropower development with community empowerment

CS aligns hydropower development with community empowerment

July 4, 2025

The Divisional Commissioner directed for effective monitoring of ongoing works and strict adherence to the design, drawing and specifications, and use of quality material for creation of durable assets.

He emphasized upon the executing agency to complete the projects within stipulated time frame.

Khan asked all Chief Engineers to furnish progress report on fortnightly basis to the Divisional Commissioner’s office.

Additional Commissioner Kashmir, CE Electric M&RE, CE Systems & Operations, CE Projects Wing and other concerned officers were present in the meeting.

Previous Post

Joint separatist leadership condemns rape incident, demands exemplary punishment to culprit

Next Post

Advisor Sharma holds public grievances redressal camp at Jammu

Images News Netwok

Images News Netwok

Next Post
Advisor K K Sharma visits SMGS Hospital

Advisor Sharma holds public grievances redressal camp at Jammu

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: [email protected]

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.