• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, July 13, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home CITY & TOWNS

Power shutdown

Images News Netwok by Images News Netwok
December 14, 2018
in CITY & TOWNS
A A
0
Power Shutdown
FacebookTwitterWhatsapp

JAMMU DECEMBER 13: To execute work for Branch cutting and tightening of jumpers, the shutdown of 11KV feeder TRN-3 emanating from 2 x10 MVA 33/11 kV R/Stn Trikuta Nagar is being observed.

During the shutdown, the power supply to Sector-2 & 2-Extn in Trikuta Nagar and its adjoining areas   will remain affected on December 14 from 10 am to 12 noon.

Related posts

Quality education imperative for honing intellectual capacity of youth: Dy CM

Dy CM acts against poor road work; suspends JE, issues notice to Contractor

July 12, 2025
Sakeena Itoo inaugurates CRWM for water supply schemes at Noorabad Kulgam

Sakeena Itoo inaugurates CRWM for water supply schemes at Noorabad Kulgam

July 12, 2025

Meanwhile, for replacement of 33 KV isolator and 33 KV LA set by M/s IRCON International Ltd, the shutdown of 33 KV Janipur-Sheetli Line is being observed.

During the shutdown, the power supply to Sheetli, Sidhra, Bamyal, MES Sheetli, PHE Sheetli and adjoining areas will remain affected on December 14 from 12 noon to 3 pm.

However, to carry out work for branch cutting of 33 KV line from Salehat to Sai, the shutdown of 33 KV Salehar-Sai Tap in emanating from Salehar is being observed.

During the shutdown, the power supply to Sai, Bilaspur and its adjoining areas will remain affected on December 15 from 10 am to 3 pm.

However, for replacement of CT/PT unit of M/s Kashmir Ispat, SIDCO Complex, Bari Brahmana, the shutdown of 33/11 KV feeder is being observed.

During the shutdown, the power supply to Industrial Complex Bari Brahmana will remain affected on December 14 from 1.30 pm to 2 pm and 5.30 pm to 6 pm.

Previous Post

Sarfraz  calls on squad to play ‘without fear’ in South Africa

Next Post

Dec 13 Par attack: PM salutes valour of those martyred

Images News Netwok

Images News Netwok

Next Post
Dec 13 Par attack: PM salutes valour of those martyred

Dec 13 Par attack: PM salutes valour of those martyred

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.