• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, June 21, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

PM inaugurates Rs 11,000 cr Eastern Peripheral Expressway

Press Trust of india by Press Trust of india
May 28, 2018
in BUSINESS
A A
0
Development became vibrant movement over last 4 years: PM
FacebookTwitterWhatsapp

Baghpat, May 27 :  Asserting that infrastructure is a key priority of his government, Prime Minister Narendra Modi today said Rs 3 lakh crore has been spent on laying a network of 28,000 km of highways.

Highways, railways, airways and I-ways have been the focus of the government he said.

More News

Modi releases PM-Kisan instalment worth Rs 18,880 cr, launches several projects in Bengal

3 Indian-flagged oil tankers transit through Strait of Hormuz

PM Modi says 70 lakh jobs created under PM-VBRY so far

Load More

Highways construction has reached 27 km a day from mere 12 km a day during the Congress regime, while last year 10 crore people undertook air journeys, he said.

Modi was addressing a public rally here after dedicating the Eastern Peripheral Expressway (EPE) to the nation. The 135 km EPE has been built at a cost of Rs 11,000 crore in 500 days.

He said that apart from Rs 5 lakh crore provision for Bharatmala for highways, a provision of Rs 14 lakh crore was made in the budget to strengthen agriculture related infrastructure.

The government is sensitive to the plight of sugarcane farmers and adequate steps are taken to provide proper prices for their crop, he said.

While talking about social justice, Modi said his government is committed to the protection of dalits and has constituted special courts for fast-track hearing of cases of atrocities.

Lauding Uttar Pradesh Chief Minister Yogi Adityanath, he said criminals in UP are now surrendering themselves and pledging not to indulge in illegal acts.

About the Ganga cleaning programme, Modi said more than 200 projects worth Rs 21,000 crore for have been taken up.

Taking a jibe at Congress, Modi said it had betrayed people for 70 years and played politics to create a crisis of confidence whether related to EVMs or other critical issues.

He said the opposition was spreading rumours on farmer issues and asked people not to give credence to lies about farms being given on contract farming.

In his about 50 minute-speech, he said all-round development work has been initiated.

Transport and Highways Minister Nitin Gadkari said, the expressway will reduce 27 per cent pollution and ease 41 per cent traffic jam.

He said the highway was built in a record 500 days against 910 days time.

Gadkari said it the Delhi-Meerut expressway will be completed by next March and reduce the travel time between the two cities to 40 minutes from two-and-half hours at present.

A lot of traffic, outbound or non-destined for Delhi will be diverted, he has said, adding that at least 50,000 vehicles going to Jammu & Kashmir, Punjab, Haryana, Uttrakhand, Uttar Pradesh and Rajasthan will be diverted bringing down vehicular pollution.

The alignment of EPE starts near Kundli and passes through six Parliamentary Constituencies — Sonepat, Bagpat, Gaziabad, Noida, Faridabad and Palwal.

Gadkari also announced that Delhi-Saharanpur Highway will be built on EPE pattern and foundation stone of the Rs 7,000 crore Dwarka Expressway will be launched soon by the Prime Minister.

Besides, he announced the Rs 45,000 crore Delhi-Mumbai project via Jaipur and Vadodara on a new alignment, which will save Rs 16,000 crore on land acquisition.

EPE is India’s first highway to be lit by solar power besides provisions of rain water harvesting every 500 metre on both sides. It also showcases 36 national monuments and 40 fountains.

There are 8 solar power plants on this expressway having a capacity of 4000-kilo watt (4 MW).

The state-of-the-art road has auto challan system for over-speeding, as cameras will capture speed of vehicles besides having provisions of tolling only for the distance travelled. The expressway has an iconic toll plaza at the entry point on Kundli side besides digital art gallery.

It is also equipped with smart and intelligent highway traffic management system (HTMS) and video incident detection system (VIDS) and is environment-friendly with world-class safety features and smart/ interactive infrastructure.

The foundation stone of the greenfield project was laid by Modi on November 5, 2015.

About 2.5 lakh trees have been planted alongside the expressways including transplant of 8-10 year old trees with drip irrigation system for plantation.

It has consumed 11 lakh tonne of cement, 1 lakh tonne of steel, 3.6 crore cum earthwork and 1.2 crore cum fly-ash. Gadkari has said earlier that the project has generated employment opportunities of about 50 lakh man-days and 9,375 manpower was deployed here.

The fully access controlled six-lane expressway provides entry and exit designated interchanges only. It has 406 structures of which 4 are major bridges, 46 minor bridges, 3 flyovers, 7 inter-changes, 221 underpasses and 8 ROBs.

The project had earlier faced resistance from farmers over land and other issues which have since been solved by giving higher compensation.

The Supreme Court on May 10 had directed the NHAI to throw open the Eastern Peripheral Expressway for the public by May 31, asking why were they “waiting” for its inauguration by the Prime Minister.

The apex court had said if the 135-km expressway is not inaugurated on or before May 31, it should be thrown open for public who were facing traffic congestion in Delhi.

The Eastern and the Western Peripheral Expressways were planned in 2006 following the apex court’s order to build a ring road outside the national capital for channelling the traffic not bound for Delhi.

Previous Post

India, Russia conclude negotiations for S-400 Triumf deal

Next Post

Ramadan Donations- Think before you offer!

Press Trust of india

Press Trust of india

Related Posts

Modi releases PM-Kisan instalment worth Rs 18,880 cr, launches several projects in Bengal

India progressing with futuristic vision and modern approach: PM Modi
June 20, 2026

Tarakeswar (WB): Prime Minister Narendra Modi released the 23rd instalment of the PM-Kisan scheme worth Rs 18,880 crore, benefiting over...

Read moreDetails

3 Indian-flagged oil tankers transit through Strait of Hormuz

India summons Iran envoy over incident of firing at ships in Strait of Hormuz
June 20, 2026

New Delhi:  Three Indian-flagged crude oil tankers carrying over 8.6 lakh million tonnes of cargo with 94 crew members from...

Read moreDetails

PM Modi says 70 lakh jobs created under PM-VBRY so far

‘Challenging’ situation due to West Asia war, says PM Modi
June 20, 2026

New Delhi:  Pradhan Mantri Viksit Bharat Rozgar Yojana (PM-VBRY) has created over 70 lakh jobs across the country so far,...

Read moreDetails

MPC opts for ‘wait-and-watch’ amid growth, inflation uncertainties: RBI minutes

RBI holds meeting of Steering Sub Committee of J&K SLBC
June 20, 2026

Mumbai:  All six members of the RBI's Monetary Policy Committee favoured a wait-and-watch approach as they voted for a status...

Read moreDetails

PM Modi meets leading CEOs in France; discusses investments and expansion plans in India

PM Modi meets leading CEOs in France; discusses investments and expansion plans in India
June 19, 2026

Paris:  Prime Minister Narendra Modi on Thursday met leading business executives here and held discussions on investment opportunities and expansion...

Read moreDetails

Modi to transfer PM-KISAN installment worth Rs 18,880 cr to 9.44 cr farmers on June 20

   PM Modi pitches for ‘swadeshi’ goods
June 19, 2026

New Delhi:  Prime Minister Narendra Modi will on June 20 transfer the 23rd instalment under the PM-KISAN scheme, disbursing Rs...

Read moreDetails
Next Post
Ramadan Donations- Think before you offer!

Ramadan Donations- Think before you offer!

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.