• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, August 11, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Banihal-Qazigund road tunnel likely to open next year: NHAI official

Images News Netwok by Images News Netwok
May 21, 2018
in TOP NEWS
A A
0
Banihal-Qazigund road tunnel likely to open next year: NHAI official

Banihal-Qazigund road tunnel

FacebookTwitterWhatsapp

Banihal: Excavation work inside the 8.5-km-long Banihal-Qazigund tunnel along the Jammu-Srinagar National Highway was completed today with its twin tubes likely to be made operational by next year, a senior NHAI official said.

“The double tube excavation work inside the Banihal-Qazigund four-lane tunnel was completed after seven years… The breakthrough was made today,” NHAI Project Director Ghulam Qadir told PTI.

Related posts

   First-ever freight train carrying cement arrives at Anantnag Goods Shed

  First-ever freight train carrying cement arrives at Anantnag Goods Shed

August 10, 2025
Govt bringing laws, taking steps to make social media platforms accountable: IT Min

Goods train to Kashmir a milestone: Ashwini Vaishnaw

August 10, 2025

The existing Jawahar tunnel, under the Banihal pass, is at an elevation of 2,194 metres (7,198 feet) making it prone to avalanches, which have lead to closure and bottlenecks on the 265-km all-weather highway linking Kashmir to the rest of the country.

The new Banihal-Qazigund tunnel’s elevation is 1,790 metres (5,870 feet), 400 metres below the Jawahar tunnel. This makes it less prone to avalanches, National Highways Authority of India (NHAI) officials said.

The work on the Rs 2,100-crore project started in June 2011 and on completion, the tunnel would reduce the distance between Banihal and Qazigund by 16 kms.

“The project is likely to be completed by next year,” Qadir said.

The tunnel has two parallel tubes, one for each direction. Each tube will be seven metres (23 ft) wide with two lanes. One of the tubes was completed in February this year.

The tubes are interconnected by  passages at every 500 metres for maintenance and emergency evacuation.

The tunnel will have forced ventilation for extracting smoke and stale air and infusing fresh air. It will have state-of-the-art monitoring and control systems for security.

It is expected that commuters using the tunnel will have to pay a toll.

Previous Post

CM reviews pace on key dev projects in Jammu

Next Post

Authorities promote unfair trade under the brand of ‘fair price’…

Images News Netwok

Images News Netwok

Next Post
Authorities promote unfair trade under the brand of ‘fair price’…

Authorities promote unfair trade under the brand of ‘fair price’…

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.