• TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
Tuesday, July 1, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home LOCAL

CS reviews implementation of action plan for electrification of 54 remote villages through Solar Power

Images News Netwok by Images News Netwok
March 30, 2018
in LOCAL
0
CS reviews progress of AIIMS project, action taken on ‘AoA’

Chief Secretary B B Vyas

JAMMU, MARCH 29: Chief Secretary, B B Vyas on Thursday chaired a meeting here with Commissioner/Secretary PDD, and MD JKSPDC to review the status of implementation of the action plan for dispatch of Solar Power units/material to the five districts of Kishtwar, Leh, Kargil, Bandipora and Kupwara under the electrification of 54 left out villages through off-grid mode.

This follows the meeting taken by the Union Cabinet Secretary on 1st of March, and subsequently by the Chief Secretary on 10th of March, 2018, wherein the action plan for implementation of the programme was finalised.

Related posts

Sakeena Itoo reviews progress on health projects across Kashmir division

Sakeena Itoo reviews progress on health projects across Kashmir division

June 30, 2025
CS assesses promotion plans for Handicrafts, MSMEs in J&K

CS sets the tone for transforming rural women into successful entrepreneurs

June 30, 2025

Out of the 18452 villages identified in the country for electrification in 2015, only 910 villages remain to be electrified including 70 in Jammu and Kashmir. These 70 remaining villages have been targeted for electrification by April, 2018 including 54 through the off-grid mode.

It was informed that after the mandatory inspection of the Solar Power units, the consignment has been dispatched to the state through surface transport and will be reaching the designated places in couple of days; from where, these will be transported to the remote un-electrified villages by air sorties/surface transport, as per the action plan devised for the purpose.

Divisional and the District Administration have been directed to provide all necessary support to the Power Development Department in facilitating/coordinating the implementation of the entire project.

Previous Post

Bhat accorded farewell by Law Deptt

Next Post

Speaker, Ansari lay foundation of Guest House, inaugurate “TECHNOVATION-2018”

Next Post
Speaker, Ansari lay foundation of Guest House, inaugurate “TECHNOVATION-2018”

Speaker, Ansari lay foundation of Guest House, inaugurate "TECHNOVATION-2018"

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: [email protected]

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.