• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, January 19, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

MPs raise concern over delay in North East telecom project

Press Trust of india by Press Trust of india
March 19, 2018
in BUSINESS
A A
0
FacebookTwitterWhatsapp

New Delhi, Mar 18: Members of Parliament from BJP as well as Congress have expressed concern over delays in mobile network rollout in uncovered villages of the sensitive North East region.

In a letter to telecom minister Manoj Sinha, Congress MP from Arunachal Pradesh Ninong Ering said that despite north eastern states signing memorandum of understanding in January over installation of mobile towers in uncovered villages, nothing has been implemented on ground.

More News

PM unveils development projects worth over Rs 830 cr in Bengal

SC places before CJI plea for SOP on freezing, de-freezing of bank accounts during cybercrime probes

Partner with Bharat, subscribe to future: India at WEF

Load More

He has called for immediate installation of mobile towers in Bishing and Tuting area of Arunachal Pradesh where China has reportedly attempted to build road on Indian territory.

“It is my earnest request to you that the connectivity on all Chinese border is very important. As you must have witness during the last incursion of the Chinese in Bishing, in Tuting area of Arunachal Pradesh. The information received by the army personnel was very late. If the mobile tower had been installed the incursion could have been stopped,” Ering said.

The Cabinet in 2014 had approved Comprehensive Telecom Development Plan for the north-eastern region to provide 2G mobile coverage in 8,621 uncovered villages and areas along with national highways in the North-East with an outlay of Rs 5,336.18 crore. However, the project is yet to be rolled out.

Bharti Airtel has also been entrusted to set up over 2004 mobile towers to connect about 2,128 villages in Manipur, Mizoram, Nagaland, Sikkim, Tripura, parts of Assam and national highways in north-eastern States. Besides, BSNL has been assigned to install 2,817 mobile towers to provide coverage in 4,119 uncovered villages in the region.

BJP MP Nishikant Dubey had also approached the telecom minister last December expressing concern over the 3-year delay in the project. He alleged  that senior officers in Universal Service Obligation Fund (USOF) department are “deliberately delaying” the project.

“They are responsible for criminal delay of the project. Either they are incompetent or they have some ulterior motives,” Dubey alleged.

When contacted, a Department of Telecom (DoT) official said that the Telecom Commission has already approved the project and the roll out has been delayed due to pending of network testing on ground.

He said: “BSNL has been awarded project on the nomination basis. There have been complaints against telecom network deployed by BSNL in naxal affected states. BSNL plans to deploy same technology in North East.

“The Telecom Commission in September has desired to conduct test at the site to check if BSNL network works without any glitch in North East states before final approval is accorded.”

A BSNL official has said network in area affected by left wing extremism (LWE) was based on specifications approved by DoT.

“The network came as relief for those areas which never had any connectivity and was appreciated by all initially. Over the years network carrying traffic capacity has reached its limit. Therefore it needs further upgrade for which DoT is considering various measures.BSNL will upgrade as soon as approvals are received,” the BSNL officer said.

The DoT officer said that BSNL vendors agreed for network test in North East at the location in mid-February.

“We are just waiting for them to get the testing done, after which the mobile tower roll out can be carried out as per BSNL’s convenience,” the officer said.

Previous Post

Next Post

The brokers of religion

Press Trust of india

Press Trust of india

Related Posts

PM unveils development projects worth over Rs 830 cr in Bengal

Pahalgam terror attack: PM Modi steps up diplomatic offensive against Pak
January 18, 2026

Singur (WB): Prime Minister Narendra Modi on Sunday launched development projects worth over Rs 830 crore in West Bengal and...

Read moreDetails

SC places before CJI plea for SOP on freezing, de-freezing of bank accounts during cybercrime probes

SC says will consider listing of pleas challenging abrogation of Article 370
January 18, 2026

New Delhi:  The Supreme Court has directed that a plea seeking directions to the Centre and the Reserve Bank of...

Read moreDetails

Partner with Bharat, subscribe to future: India at WEF

January 18, 2026

Davos:  From a new address here, once occupied by the iconic Piano Bar, Team India has a clear message written...

Read moreDetails

Treaties should be driven by national interest, not pressure from foreign govts or corporations: SC

SC to fix schedule of hearing of Ayodhya land dispute cases in January next year
January 17, 2026

New Delhi: Treaties should be driven by national interest, not pressure from foreign governments or corporations, the Supreme Court has...

Read moreDetails

India skips South Africa-led naval exercise as it’s not ‘institutionalised’ BRICS activity

India strongly rejects charges of interference in Canadian elections
January 17, 2026

New Delhi: India on Saturday said it skipped a South Africa-initiated multilateral naval wargame featuring a number of BRICS countries...

Read moreDetails

Merchandise exports likely to be affected by strong headwinds: CRISIL

January 17, 2026

Kolkata: Ratings firm CRISIL said that merchandise exports are likely to be buffeted by stronger headwinds due to the continuing...

Read moreDetails
Next Post
The brokers of religion

The brokers of religion

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.