• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, August 2, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Union cabinet approves Kiru hydro-electric project

Images News Netwok by Images News Netwok
March 8, 2019
in TOP NEWS
A A
0
Modi defends 10% quota, asks Cong to clarify on Rafale claim
FacebookTwitterWhatsapp

New Delhi, Mar 07: The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi has approved the investment sanction for construction of 624 MW Kiru hydro-electric power project by M/s Chenab Valley Power Projects Private Limited (CVPPPL) in Jammu & Kashmir.

The project will be implemented at an estimated cost of Rs 4287.59 crore which includes Interest during construction and foreign component of Rs 426.16 crore and infusion of equity of Rs 630.28 crore by NHPC in CVPPPL, for construction of Kiru hydro-electric project including Rs 70 crore for pre-construction activities already approved by the Cabinet, while according the approval for execution of the Pakal Dul hydro-electric project, an official handout said.

More News

  Kulgam: Second migrant worker succumbs; death toll 2; search on for attackers

CM announces Rs 10 lakh each for kin of victims

3 special trains ferry 2,200 stranded passengers

Load More

CVPPPL is a joint venture company between NHPC, Jammu & Kashmir State Power Development Corporation (JKSPDC) and PTC with equity shareholding of 49 percent, 49 percent and 2 percent respectively.

The project is located on River Chenab in Kishtwar district of Jammu & Kashmir. It envisages construction of a 135 m high concrete gravity dam above deepest foundation level, four circular pressure shafts of 5.5 m internal dia of length varying from 316 m to 322 m, an underground power house and four tail race tunnels, horseshoe shape, 7 m dia and length varying from 165 m to 190 m.

The project shall provide much-needed power in Northern Grid and shall accelerate process of development of remote areas of Jammu and Kashmir. The project is scheduled to be completed in a period of four-and-half years, the handout informed.

Kiru hydro-electric project is envisaged as a run-of-river (RoR) scheme, designed complying with the requirements of Indus Waters Treaty of 1960, with installed capacity 624 MW (4 x 156 MW). The project would generate 2272.02 MU in a 90 percent dependable year.

The foundation stone of the project was laid by the Prime Minister Narendra Modi on Feb 03, 2019.

The Government of Jammu and Kashmir has already granted exemption on account of payment of levy of toll tax, State Goods and Service Tax (SGST), waiver of free power in a decremental manner and water usage charges for a period of 10 years from the date of commercial operation.

Previous Post

2 persons arrested for murder in Uri

Next Post

Will ‘soon’ respond to Indian dossier on JeM: Pak FO

Images News Netwok

Images News Netwok

Related Posts

  Kulgam: Second migrant worker succumbs; death toll 2; search on for attackers

   Kulgam: Second migrant worker succumbs; death toll 2; search on for attackers
August 2, 2026

Srinagar: Security forces on Saturday intensified search operations to track down the assailants who killed two migrant labourers in Kulgam...

Read moreDetails

CM announces Rs 10 lakh each for kin of victims

CM calls for depiction of cultural identity in new infrastructure at JK House properties across India
August 2, 2026

Srinagar: Chief Minister Omar Abdullah on Saturday announced an ex-gratia relief of Rs 10 lakh each for the kin of...

Read moreDetails

3 special trains ferry 2,200 stranded passengers

Locomotive of Jammu-bound train detaches from coaches in Punjab
August 2, 2026

Jammu: The Northern Railway operated three special trains in J&K on Saturday and successfully transported around 2,200 passengers stranded due...

Read moreDetails

Condemning Kulgam terror attack, Farooq Abdullah questions timing of attack; seeks probe

Farooq Abdullah questions Centre’s silence on situation in PoJK
August 2, 2026

Jammu/Srinagar: National Conference president Farooq Abdullah on Saturday condemned the Kulgam terror attack that left two migrant workers dead but...

Read moreDetails

LG hands over job letters to kin of two slain policemen

LG hands over job letters to kin of two slain policemen
August 2, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Saturday handed over appointment letters on compassionate grounds to the son of a head...

Read moreDetails

No society prospers on govt jobs alone: CM

Following KI report on Srinagar Smart City fiasco, CM announces inquiry
August 2, 2026

Bengaluru:  Chief Minister Omar Abdullah on Saturday said no society had ever become prosperous solely through government employment or public...

Read moreDetails
Next Post
Efforts on to resume dialogue with India: Pak FO

Will 'soon' respond to Indian dossier on JeM: Pak FO

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.