• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, September 1, 2025
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Landslide halts traffic on Srinagar-Jammu highway for 15 hours

Images News Netwok by Images News Netwok
March 5, 2019
in TOP NEWS
A A
0
Landslide blocks Jammu-Srinagar national highway
FacebookTwitterWhatsapp

Srinagar, Mar 04: A fresh landslide halted traffic for nearly 15 hours on the strategic Srinagar-Jammu national highway even as over 3,000 Kashmir-bound vehicles, mostly carrying passengers, crossed the Jawahar Tunnel — the gateway to the Valley on Monday, officials said.

The 270-km highway is partially open but only stranded vehicles are being allowed to ply to reach their destination, the officials said.

Related posts

Full restoration of highway may take 20 to 25 days; two-way traffic could be made possible on the alternative route shortly: CM

Full restoration of highway may take 20 to 25 days; two-way traffic could be made possible on the alternative route shortly: CM

September 1, 2025
Home Minister Amit Shah reaches Jammu to assess flood situation

Home Minister Amit Shah reaches Jammu to assess flood situation

September 1, 2025

“As many as 2,500 light motor vehicles and 600 trucks including 250  fuel tankers crossed the Jawahar Tunnel into the valley from this side till 4 pm,” Deputy Superintendent of Police, Traffic (national highway),  Pardeep Singh Sen was quoted as saying by PTI.

He said a major landslide hit the highway in Panthiyal area of Ramban Sunday evening, forcing closure of the road.

The agency concerned worked overnight and managed to clear the road of the hurdles after 15-hour long operation Monday morning, the officer said adding the vehicular movement was on when last reports were received.

Authorities allowed one-way traffic from Jammu to Srinagar on Saturday after nearly week-long closure but multiple landslides coupled with continuous shooting of stones due to fresh snowfall and incessant rains left thousands of commuters stranded between Ramban to Udhampur.

The traffic was allowed to move towards Srinagar after restoration of the road on Sunday but only a few hundred vehicles managed to cross the problematic 12-km zone from Panthiyal to Ramsu before it was blocked by multiple landslides again.

The authorities did not allow traffic from either Srinagar or Jammu and said the preference would be given to clear the stranded vehicles first, the officials said.

Previous Post

59 Nobel laureates urge India, Pak PMs to defuse tensions

Next Post

Fresh firing breaks two-day lull along LoC in J&K

Images News Netwok

Images News Netwok

Next Post
Minor boy from PaK detained

Fresh firing breaks two-day lull along LoC in J&K

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ePaper

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2024 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2024 Kashmir Images - Designed by GITS.