• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, November 17, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Zojila Tunnel breakthrough scheduled for June 9

Gadkari to trigger final blast as strategic Kashmir-Ladakh link nears major milestone

KI News by KI News
June 4, 2026
in TOP NEWS
A A
0
High-tech surveillance system installed at Navayuga Tunnel Qazigund

File Photo

FacebookTwitterWhatsapp

GANDERBAL: The strategically important 13.15-kilometre Zojila Tunnel connecting Jammu and Kashmir with Ladakh is set to achieve a major milestone on June 9, when Union Minister for Road Transport and Highways Nitin Gadkari is scheduled to trigger the breakthrough blast marking the completion of excavation work.

Once completed, the tunnel will become the world’s longest single-tube bi-directional road tunnel at an altitude of nearly 11,500 feet, providing all-weather connectivity between the Kashmir Valley and Ladakh.

More News

Rotten meat exposes rot in system; FDA wakes up after nearly a year

Terrorist killed in encounter in Kulgam, body recovered; hunt on for associate

Vital clues obtained, operations underway to track terrorists behind Kulgam attack: CRPF JK ADG

Load More

Constructed beneath the Zojila Pass, the tunnel is expected to ensure year-round road access between Kashmir and Kargil, reducing dependence on the weather-sensitive mountain pass that often remains closed during winter months.

Harpal Singh, Joint Chief Operating Officer of Megha Engineering and Infrastructures Limited (MEIL), said excavation has entered its final phase, with only a few metres of digging remaining before the two ends of the tunnel meet.

He said construction was undertaken simultaneously from the Baltal side in Kashmir and the Minamarg side in Ladakh to expedite progress.

Awarded in 2020 and taken up for execution in 2021, the project has been built under challenging Himalayan conditions, including weak rock formations, water seepage and difficult terrain. More than 1,000 engineers, technicians and workers are currently engaged in the project.

Being constructed at an estimated cost of around Rs 2,600 crore, the tunnel is designed as a single-tube, two-lane structure with a horseshoe-shaped profile and is being built using the New Austrian Tunnelling Method (NATM), a technique suited to complex mountain geology.

Following the breakthrough, work will continue on internal infrastructure, including concrete lining, ventilation systems and other safety installations.

The tunnel will also feature a dedicated walkway for maintenance and emergency operations. Upon completion, it is expected to significantly enhance connectivity, mobility, tourism, trade and economic activity in the strategically important region. (KNO)

Previous Post

High Court denies bail to Kupwara man in rape case

Next Post

CIK conducts raids in 6 Kashmir districts in a terror-related case

KI News

KI News

Kashmir Images is an English language daily newspaper published from Srinagar (J&K), India. The newspaper is one of the largest circulated English dailies of Kashmir and its hard copies reach every nook and corner of Kashmir Valley besides Jammu and Ladakh region.

Related Posts

Rotten meat exposes rot in system; FDA wakes up after nearly a year

FDA inspects 85 meat units across J&K, seizes 115 kg paneer in Jammu
November 17, 2026

Srinagar: The supply of unhygienic and rotten food rocked the Kashmir Valley nearly a year ago. The concerned authorities swung...

Read moreDetails

Terrorist killed in encounter in Kulgam, body recovered; hunt on for associate

Two terrorists killed, 5 security personnel injured in encounter in Kulgam
November 17, 2026

Srinagar: One of the terrorists allegedly involved in last week's attack on CRPF personnel in south Kashmir's Kulgam district was...

Read moreDetails

Vital clues obtained, operations underway to track terrorists behind Kulgam attack: CRPF JK ADG

Vital clues obtained, operations underway to track terrorists behind Kulgam attack: CRPF JK ADG
November 17, 2026

Srinagar: Security forces have gathered “vital clues” about the identities of the terrorists behind last week's attack on a CRPF...

Read moreDetails

Gulmarg, Pahalgam shiver at -3.5°C

Snowfall in higher reaches, rain in plains as wet spell approaches J&K
November 17, 2026

Srinagar: The night temperatures continued to remain below normal at several places across Kashmir, with Gulmarg and Pahalgam recording the...

Read moreDetails

44% consultant posts, 25% medical officer posts vacant in J&K healthcare institutions

KI News
November 17, 2026

Srinagar: If you fall sick in the peripheral areas of Jammu & Kashmir, the first healthcare facility you are likely...

Read moreDetails

Collective punishment only breeds alienation: PDP chief on search operation by security forces

This moment in the Valley
November 17, 2026

Srinagar: PDP president Mehbooba Mufti on Monday said meting out collective punishment to a large population for the wrong deeds...

Read moreDetails
Next Post
Police searches underway at 10 locations in Kashmir

CIK conducts raids in 6 Kashmir districts in a terror-related case

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.