• About us
  • Contact us
  • Our team
  • Terms of Service
Monday, May 18, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Centre gives nod to Sawalkote project on Chenab river amid Indus Waters Treaty suspension

Press Trust of india by Press Trust of india
October 11, 2025
in TOP NEWS
A A
0
Govt diverts Chenab river water to expedite 850-MW Ratle hydro electric project
FacebookTwitterWhatsapp

New Delhi: The Centre has recommended environmental clearance for the 1,856-MW Sawalkote Hydro Electric Project on the Chenab river in Jammu and Kashmir, a strategically-important project being revived following the suspension of the Indus Waters Treaty (IWT) with Pakistan.

Stalled for nearly four decades, the Sawalkote project is one of India’s largest hydropower schemes in the Chenab basin and a key part of the government’s push to fully utilise its share of western river waters under the 1960 treaty.

More News

LG urges citizens to self-enumerate their household details

Lashkar terrorist goes for hair transplant after infiltrating J&K

Eid-ul-Adha on May 27

Load More

Its revival comes months after New Delhi announced the suspension of the treaty following the April 22 Pahalgam terror attack, allowing India to freely develop infrastructure on the Indus, Jhelum and Chenab rivers.

Under the IWT, the three eastern rivers — Ravi, Beas and Sutlej — were allocated to India for its exclusive use. The three western rivers — Indus, Jhelum and Chenab — were reserved for Pakistan, though India retains limited rights to use their waters for non-consumptive purposes, such as run-of-the-river hydropower generation, navigation and fisheries.

To be built by the National Hydroelectric Power Corporation (NHPC) Limited at an estimated cost of Rs 31,380 crore, the run-of-the-river project will straddle Ramban, Reasi and Udhampur districts of Jammu and Kashmir.

It includes a 192.5-metre-high roller-compacted concrete dam and underground powerhouses designed to generate about 7,534 million units of electricity annually.

Once commissioned, it will be the largest hydropower project in the Union Territory and provide crucial peaking power and grid stability for northern states.

The project carries both developmental and strategic weight.

Besides adding to the region’s power supply, the project will enhance India’s ability to manage and store the Chenab’s waters, a right allowed under the IWT but rarely exercised fully due to engineering challenges and diplomatic sensitivities with Pakistan.

The Expert Appraisal Committee (EAC) for river valley and hydroelectric projects of the Union environment ministry, at its meeting on September 26, examined the NHPC’s updated proposal covering a total area of 1,401.35 hectares, including 847.17 hectares of forest land.

The project received Stage-I forest clearance in July.

According to the committee’s minutes published on October 9, no protected area lies within a 10-kilometre radius of the site and the nearest sanctuary; Kishtwar High Altitude National Park, is about 63 kilometres away.

The NHPC’s revised environmental-management plan allocates about Rs 594 crore for mitigation and restoration measures, up from Rs 392 crore earlier.

The plan includes catchment-area treatment, muck disposal, biodiversity conservation and long-term monitoring of the air, water, soil and aquatic ecosystems.

The project will affect 13 villages and displace about 1,500 families, primarily in Ramban district.

The NHPC has proposed a detailed rehabilitation-and-resettlement plan, offering housing, livelihood support and skill development to the project-affected families.

Around 1,500 people will be employed during construction, with about 200 technical staff retained during operation.

Public hearings were held in Udhampur, Reasi and Ramban in early 2016, where residents demanded fair compensation, better connectivity, healthcare, education facilities and free electricity.

Concerns were also raised over forest loss and riverine impacts.

The EAC, after reviewing the updated baseline environmental data and responses, found the proposal compliant with regulatory norms and recommended clearance with specific environmental safeguards.

The Sawalkote project was first conceived in the 1980s but faced repeated delays over forest clearances, rehabilitation issues and questions about cumulative impact studies.

The environment ministry’s Forest Advisory Committee and the home ministry recently backed its clearance on strategic grounds, noting that new assessment norms introduced in 2013 should not apply retrospectively to older projects.

 

Previous Post

NC names Choudhary Ramzan, Sajad Kichloo, Shammi Oberoi for Rajya Sabha polls

Next Post

Terrorism is breathing its last in J&K: LG Sinha

Press Trust of india

Press Trust of india

Related Posts

LG urges citizens to self-enumerate their household details

LG urges citizens to self-enumerate their household details
May 18, 2026

Srinagar: The Lieutenant Governor Manoj Sinha completed his self-enumeration today, marking the beginning of the House listing and Housing Census...

Read moreDetails

Lashkar terrorist goes for hair transplant after infiltrating J&K

Lashkar terrorist goes for hair transplant after infiltrating J&K
May 18, 2026

Srinagar: Infiltrating Jammu and Kashmir to execute terror attacks for the banned Lashkar-e-Taiba (LeT), a Pakistani terrorist paused his operations...

Read moreDetails

Eid-ul-Adha on May 27

Ramzan to begin on March 2 across J&K: Mufti Nasir-ul-Islam
May 18, 2026

Srinagar: Grand Mufti of Jammu and Kashmir Nasir-ul-Islam Farooq on Sunday announced that Eid-ul-Adha will be celebrated across Jammu and...

Read moreDetails

Mainstreaming of J&K under Modi govt led to aspirational surge among women: Jitendra Singh

Mainstreaming of J&K under Modi govt led to aspirational surge among women: Jitendra Singh
May 18, 2026

Srinagar: Union Minister Jitendra Singh on Sunday said the mainstreaming of Jammu and Kashmir under the leadership of Prime Minister...

Read moreDetails

DFCO issues advisory ahead of nationwide chemists’ bandh on May 20

Tral shuts for second day against militant killings
May 18, 2026

Srinagar: Drugs and Food Control Organization on Sunday issued a public advisory ahead of the nationwide bandh call given by...

Read moreDetails

Govt withholds salaries of four ACDs over poor MGNREGA performance

AC extends Amnesty Scheme-2022 for domestic consumers of electricity till March 2025
May 18, 2026

Srinagar: The Jammu and Kashmir government has withheld the salaries of four Additional District Programme Coordinators (ADPCs)/Assistant Commissioners Development (ACDs)...

Read moreDetails
Next Post
Terrorism is breathing its last in J&K: LG Sinha

Terrorism is breathing its last in J&K: LG Sinha

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.