• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, May 19, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

History is made after almost 7 decades: KASHMIR CONNECTED, FINALLY

Taha Wani by Taha Wani
January 26, 2025
in TOP NEWS
A A
0
History is made after almost 7 decades: KASHMIR CONNECTED, FINALLY

Vande Bharat Express Reaches Srinagar. PHOTO: Farooq Javed

FacebookTwitterWhatsapp

Srinagar: After nearly 78 years, Kashmir Valley has finally got connected with rest of the country as a specially-designed Vande Bharat Express train arrived at the Srinagar station in the Nowgam area on the city outskirts from Katra in Jammu and then moved to Budgam.

Years of hard work and dedication, and some engineering marvels later, the dream of Kashmir’s rail connectivity finally came true as a specially-designed Vande Bharat Express train arrived here on Saturday, completing its trial run.

More News

SC flags low conviction in UAPA cases, says 90% trials culminate in acquittals

LG Sinha reviews construction work at Pantha chowk Yatri Niwas

Jailed MP Engineer Rashid’s father dies at 85

Load More

The train, on its maiden trial run, arrived at the Srinagar station in the Nowgam area on the city outskirts from Katra in Jammu.

It had reached Jammu on Friday.

As the Vande Bharat Express reached the station at 11:30 am, it was welcomed with slogans and praises for the Indian Railways.

A large number of people and railway officials were waiting for the train since the morning, many of them carrying garlands to welcome the officials on board the train.

After a brief half at the station here, the train moved to the Budgam station to complete its trial run.

“The first trial run of the Vande Bharat between Katra and Kashmir was completed successfully,” an official said.

The train is specially designed to operate seamlessly in Jammu and Kashmir’s challenging winter conditions.

Prime Minister Narendra Modi is expected to flag off the train from Katra, as the commissioner of railway safety has given the green signal for running the train service on the Katra-Baramulla section. The date of the flagging-off ceremony is yet to be announced.

The railways has completed 272 kilometres of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.

According to railway officials, the Railway Board, on June 8 last year, unveiled a Vande Bharat Express train specially designed to operate seamlessly in Jammu and Kashmir’s challenging winter conditions for the upcoming Katra-Srinagar rail route. The train incorporates special climate-related features.

Compared to the other 136 Vande Bharat Express trains running in different parts of the country, this train has several additional features to meet operational challenges and passengers’ needs in the extreme weather conditions of Jammu and Kashmir.

It includes advanced heating systems that prevent the freezing of water and bio-toilet tanks, provide warm air for the vacuum system and ensure optimal functioning of the air-brake system for smooth operations even in sub-zero temperatures.

The train also features embedded heating elements in the windshield to automatically defrost the driver’s front lookout glass, ensuring clear visibility in harsh winter conditions.

In addition to these climate-related features, it includes all other amenities of the existing Vande Bharat trains — fully air-conditioned coaches, automatic plug doors, mobile charging sockets and the likes.

By enhancing the Kashmir valley’s connectivity to the national railway network, this train symbolises India’s commitment to bridging geographical and economic gaps, the officials said.

The approval by the commissioner of railway safety marks a significant step towards completing the 272-km USBRL project, which aims at connecting the Kashmir valley to the broader Indian Railway network.

Over the last month, the Indian Railways has conducted six trial runs on various sections of the track, including crucial milestones such as the country’s first cable-stayed rail bridge, the Anji Khad bridge, and the iconic arch bridge over the Chenab river at Kauri.

The Anji Khad bridge, a critical part of the USBRL project, is an engineering achievement, featuring a single pylon rising 331 metres above the river bed. The pylon, which took several years to complete, now rises 191 metres above its foundation level.

With a total length of 473.25 metres, the Anji Khad bridge is one of the two highest railway bridges in the world, alongside the Chenab bridge at Kauri, which holds the title of the world’s highest railway bridge at 359 metres above the river bed, 35 metres taller than the Eiffel Tower in Paris. (With PTI Inputs)

Vande Bharat Express Reaches Srinagar. PHOTO: Farooq Javed
Previous Post

Independent MLA blames dual power system for mysterious deaths in Rajouri

Next Post

PoK resident apprehended near LoC in Poonch

Taha Wani

Taha Wani

Related Posts

SC flags low conviction in UAPA cases, says 90% trials culminate in acquittals

SC says will consider listing of pleas challenging abrogation of Article 370
May 19, 2026

New Delhi: The Supreme Court on Monday flagged low conviction rates under the Unlawful Activities (Prevention) Act and said that...

Read moreDetails

LG Sinha reviews construction work at Pantha chowk Yatri Niwas

LG Sinha reviews construction work at Pantha chowk Yatri Niwas
May 19, 2026

Srinagar: Lieutenant Governor Manoj Sinha on Monday reviewed the ongoing construction works and pilgrim facilities at Shri Amarnath Shrine Board...

Read moreDetails

Jailed MP Engineer Rashid’s father dies at 85

Out on interim bail, Engineer Rashid meets ailing father in Srinagar hospital
May 19, 2026

Srinagar: The father of jailed Baramulla MP Sheikh Abdul Rashid, also known as Engineer Rashid, died at a hospital in...

Read moreDetails

CM expresses grief over demise of father of MP, MLA Khursheed Ahmad

CM assures priority redressal of public concerns
May 19, 2026

Srinagar: Chief Minister Omar Abdullah has expressed deep grief and sorrow over the passing away of Khazir Mohammad Sheikh, father...

Read moreDetails

Person cannot be declared “history-sheeter”, placed under surveillance ‘mechanically’ HC

PM Modi inaugurating incomplete projects for votes: JKPCC
May 19, 2026

Srinagar: The High Court of Jammu & Kashmir and Ladakh has ruled that a person cannot be declared a “history-sheeter”...

Read moreDetails

Have urged chief justices of all HCs to conduct virtual hearings: CJI

‘Imaandari’ not mere ornament to character, it sustains justice and reputation: CJI
May 19, 2026

New Delhi: Chief Justice of India Surya Kant said on Monday that he had requested the chief justices of all...

Read moreDetails
Next Post
CBI, ED, police don’t arrest people through video calls: Indian Cyber Crime Coordination Centre

PoK resident apprehended near LoC in Poonch

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.