• About us
  • Contact us
  • Our team
  • Terms of Service
Tuesday, March 24, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home TOP NEWS

Speedy trial run on 180-degree gradient adds new chapter in Indian Railway, says CRS

Press Trust of india by Press Trust of india
January 9, 2025
in TOP NEWS
A A
0
Railways conducts trial run on world’s highest arch rail bridge in J&K

File Photo

FacebookTwitterWhatsapp

Banihal/Jammu: A new chapter was written in Indian Railway history with a successful “rising grade” speed trial in the challenging terrain from Jammu and Kashmir’s Katra to Banihal along the USBRL project, a top official said on Wednesday.

The remarks by the Northern Circle’s Commissioner of Railway Safety (CRS) Dinesh Chand Deshwal offer a positive indication for an early start to direct rail services between Kashmir and the rest of the country.

More News

No safe space for terror supporters in J&K: LG Sinha

No fuel shortage in Kashmir, stocks for up to 15 days available: Div Com

NIA raids multiple locations in Kashmir in Red Fort blast case

Load More

However, he said they would analyse the data collected after completion of the two-day statutory inspection later in the day before the Centre might take a decision to start the much-awaited service.

Talking to reporters on reaching Banihal after the successful high-speed trial run from Katra station, Deshwal said his team would return to Katra and all the collected data would be analysed before a decision was taken on the start of direct train services to Kashmir.

“The trial run at 110 kilometres per hour on the 180-degree rising grade in such a challenging geography from Katra to Banihal has written a new chapter in the history of the Railways. The trial run was smooth and filled us with a sense of fulfillment and the credit for it goes to our engineers who have done such great work,” the CRS said.

The trial train left Katra station at 10:30 am and reached Banihal station within one-and-a-half hours. The train left for Katra on its return journey at 2 pm and reached its destination at 3:30 pm.

This was the final speed trial run on the trek.

Deshwal, who reached Katra on a two-day statutory inspection of the newly completed railway line, said the Centre would take the final decision on the start of services between Kashmir and the rest of the country.

“I am not in a position to talk about it (start of services). The statutory inspection will be completed by this evening and all the gathered data analysed in accordance with guidelines of the Northern Railway,” he said.

The CRS said the inspection and the trial run on the trek had been satisfactory so far.

“Our infrastructure is outstanding and very soon a fair decision will be taken based on our report,” he added.

On reaching Katra, Deshwal said the speed trial run on the falling gradient from Banihal to Katra was also satisfactory.

“It was fully successful on both sides…the train also passed through T-30 (tunnel-30) at a speed of 110 kmph. This tunnel posed some challenges during the construction process but the engineers overcame the technical solutions and made the track alignment precisely fit for this speed,” he said.

Last month, Rail Minister Ashwini Vaishnaw announced the completion of the Reasi-Katra section, an important development for connecting Kashmir with the rest of the country after nearly three decades of work.

On January 4, a successful trial run of an electric train was conducted on the Katra-Banihal section. The Railways have conducted six trial runs over the past month on various segments of the track, including the two major milestones of the Anji Khad and Chenab bridges.

Of the total 272-kilometre Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, 209 kilometres were commissioned in phases.

Officials said the dream project to link Kashmir by train was started in 1997 and missed several deadlines due to geological, topographical and meteorological challenges.

 

Previous Post

Police seize heroin worth over 30 crores, two held

Next Post

Youth are responsible for shaping their own and J&K’s future: LG Sinha

Press Trust of india

Press Trust of india

Related Posts

No safe space for terror supporters in J&K: LG Sinha

No safe space for terror supporters in J&K: LG Sinha
March 24, 2026

Jammu: Asserting that the era of terrorism in Jammu and Kashmir is over, Lieutenant Governor Manoj Sinha on Monday warned...

Read moreDetails

No fuel shortage in Kashmir, stocks for up to 15 days available: Div Com

Div Com reviews progress of operationlisation of 60 MLD STP for Srinagar city
March 24, 2026

Srinagar, Mar 23: Divisional Commissioner Kashmir Anshul Garg on Monday said there is no shortage of fuel or LPG in...

Read moreDetails

NIA raids multiple locations in Kashmir in Red Fort blast case

NIA arrests key accused in J&K ‘narco-terror nexus’ case
March 24, 2026

New Delhi/Srinagar: The National Investigation Agency on Monday conducted searches at various locations in Kashmir in connection with its probe...

Read moreDetails

Blast outside home in Samba; NIA, NSG teams rush to site

   Two killings/deaths in J&K, people want answers
March 24, 2026

Jammu:  A mysterious blast outside the house of a former sarpanch in Samba district early Monday shook the neighbourhood, officials...

Read moreDetails

Kashmiris pour in financial contributions for war-ravaged Iran; women lead with family gold

Kashmiris pour in financial contributions for war-ravaged Iran; women lead with family gold
March 24, 2026

Srinagar: Donations for the war-ravaged Iran poured from across Kashmir for the second day on Monday as people, cutting across...

Read moreDetails

Farooq Abdullah firing case: Accused Jamwal sent to judicial remand till April 6

City court convicts 2 persons in acid attack case
March 24, 2026

Jammu: A local court on Monday sent Kamal Singh Jamwal, accused of firing at National Conference president Farooq Abdullah at...

Read moreDetails
Next Post
Youth are responsible for shaping their own and J&K’s future: LG Sinha

Youth are responsible for shaping their own and J&K’s future: LG Sinha

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.