• About us
  • Contact us
  • Our team
  • Terms of Service
Sunday, January 11, 2026
Kashmir Images - Latest News Update
Epaper
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER
No Result
View All Result
Kashmir Images - Latest News Update
No Result
View All Result
Home BUSINESS

Namo Bharat reaches capital as PM inaugurates 13-km section of Delhi-Meerut RRTS corridor

Press Trust of india by Press Trust of india
January 5, 2025
in BUSINESS
A A
0
FacebookTwitterWhatsapp

New Delhi:  The Namo Bharat train entered the national capital on Sunday with Prime Minister Narendra Modi inaugurating a 13-km section of the Delhi-Meerut RRTS corridor from Sahibabad in Ghaziabad to New Ashok Nagar here.

Modi also took a ride on a Namo Bharat train from Sahibabad to New Ashok Nagar. During his journey, the prime minister interacted with people, including children.

More News

Modi raises investment pitch, ‘Amid great global uncertainty, unprecedented certainty in India’

RBI advocates disclosure of NPA, inspection info; banks oppose; matters in CIC

India tightens crypto noose: Live selfies, geo-tagging now mandatory for users

Load More

With the inauguration of the Delhi section of the Regional Rapid Transit System (RRTS) corridor, Meerut city is now directly connected to Delhi and commuters can reach Meerut South in just 40 minutes.

The 55-km RRTS corridor between New Ashok Nagar and Meerut South with 11 stations has become operational. Passenger operations will commence from 5 pm onwards and trains will be available every 15 minutes.

The fare from New Ashok Nagar station to Meerut South station is Rs 150 for standard coach and Rs 225 for premium coach.

The Namo Bharat train has served more than 5 million passengers so far.

The construction of other sections — New Ashok Nagar-Sarai Kale Khan and Meerut South-Modipuram — is progressing at a rapid pace, according to an official.

Of the newly-inaugurated 13-km section, 6 km is underground, including Anand Vihar station.

This is the first time that Namo Bharat trains will operate in an underground section.

Anand Vihar underground station is one of the biggest on the Namo Bharat corridor. New Ashok Nagar is the first elevated Namo Bharat station to become operational on the Delhi section.

The official said that Namo Bharat stations are designed and constructed to provide seamless connectivity with other modes of public transport, such as buses and metro, wherever possible.

One coach in each train is reserved for women and other coaches have reserved seats for women, the elderly and ‘Divyangjans’.

Each train has designated space for wheelchairs and stretchers, and a train attendant to assist and ensure the convenience of passengers.

Modi inaugurated the 17-km priority section of the RRTS corridor between Sahibabad and Duhai Depot on October 20 last year.

The 82-km RRTS corridor originates at Sarai Kale Khan in New Delhi and terminates at Modipuram in Meerut.

It has 16 stations along with nine additional stations for the Meerut metro, making it a comprehensive and transformative regional transit solution.

Previous Post

Four soldiers killed, two injured as Army vehicle falls into gorge in Bandipora

Next Post

Tighter anti-spam norms in a mth; TRAI pilot soon to onboard past user consents onto digital system

Press Trust of india

Press Trust of india

Related Posts

Modi raises investment pitch, ‘Amid great global uncertainty, unprecedented certainty in India’

India-Middle East-Europe corridor will become basis of world trade for centuries: PM Modi
January 11, 2026

Rajkot:  Prime Minister Narendra Modi on Sunday said India is currently witnessing an era of unprecedented certainty and political stability,...

Read moreDetails

RBI advocates disclosure of NPA, inspection info; banks oppose; matters in CIC

RBI holds meeting of Steering Sub Committee of J&K SLBC
January 11, 2026

New Delhi: Four major banks -- Bank of Baroda, RBL Bank, Yes Bank and State Bank of India -- have...

Read moreDetails

India tightens crypto noose: Live selfies, geo-tagging now mandatory for users

January 11, 2026

New Delhi: In an effort to eliminate illegal activity in the digital asset market, India's Financial Intelligence Unit (FIU) has...

Read moreDetails

Homebuyers’ ‘fraud’: ED attaches land parcels worth Rs 585 crore in Haryana, UP

JKSSB SI paper leak: ED arrests key absconding accused, gets 5-day remand
January 10, 2026

New Delhi:  The Enforcement Directorate on Saturday said it has attached hundreds of acres of land in Haryana and Uttar...

Read moreDetails

Incredible opportunities ahead for India and US: Sergio Gor

Defence deals boost India-US ties, new era in relations, say experts
January 10, 2026

New Delhi:  US ambassador-designate Sergio Gor, known to be a key member of President Donald Trump's inner circle, has arrived...

Read moreDetails

India projected to grow at 6.6%, resilient consumption, public investment to offset US tariffs impact: UN

Encouraged by Group of Friends launched by India to promote accountability for crimes against peacekeepers: UN Staff Union
January 9, 2026

United Nations:  India is projected to grow at 6.6 per cent in 2026, registering an “exceptionally high growth in a...

Read moreDetails
Next Post

Tighter anti-spam norms in a mth; TRAI pilot soon to onboard past user consents onto digital system

  • About us
  • Contact us
  • Our team
  • Terms of Service
E-Mailus: kashmirimages123@gmail.com

© 2025 Kashmir Images - Designed by GITS.

No Result
View All Result
  • TOP NEWS
  • CITY & TOWNS
  • LOCAL
  • BUSINESS
  • NATION
  • WORLD
  • SPORTS
  • OPINION
    • EDITORIAL
    • ON HERITAGE
    • CREATIVE BEATS
    • INTERALIA
    • WIDE ANGLE
    • OTHER VIEW
    • ART SPACE
  • Photo Gallery
  • CARTOON
  • EPAPER

© 2025 Kashmir Images - Designed by GITS.